1
-
-
38249027473
-
Innovation and firm size in manufacturing
-
Z. Acs and D. Audretsch, "Innovation and firm size in manufacturing," Technovation, vol. 7, pp. 197-210, 1988.
-
(1988)
Technovation
, vol.7
, pp. 197-210
-
-
Acs, Z.1
Audretsch, D.2
-
2
-
-
0000400935
-
Behind the learning curve: A sketch of the learning process
-
P. S. Adler and K. B. Clark, "Behind the learning curve: A sketch of the learning process," Mgt. Sci., vol. 37, pp. 267-281, 1991.
-
(1991)
Mgt. Sci.
, vol.37
, pp. 267-281
-
-
Adler, P.S.1
Clark, K.B.2
-
3
-
-
0000928359
-
Getting the most out of your product development process
-
P. S. Adler, A. Mandelbaum, V. Nguyen, and E. Schwerer, "Getting the most out of your product development process," Harvard Bus. Rev., vol. 74, 1996.
-
(1996)
Harvard Bus. Rev.
, vol.74
-
-
Adler, P.S.1
Mandelbaum, A.2
Nguyen, V.3
Schwerer, E.4
-
4
-
-
0001643223
-
The persistence and transfer of learning in industrial settings
-
L. Argote, S. L. Beckman, and D. Epple, "The persistence and transfer of learning in industrial settings," Mgt. Sci., vol. 36, pp. 140-154, 1990.
-
(1990)
Mgt. Sci.
, vol.36
, pp. 140-154
-
-
Argote, L.1
Beckman, S.L.2
Epple, D.3
-
5
-
-
0033474961
-
Organization change: A review of theory and research in the 1990s
-
A. A. Armenakis and A. G. Bedeian, "Organization change: A review of theory and research in the 1990s," J. Mgt., vol. 25, pp. 293-315, 1999.
-
(1999)
J. Mgt.
, vol.25
, pp. 293-315
-
-
Armenakis, A.A.1
Bedeian, A.G.2
-
6
-
-
0001215232
-
Forgetting and the learning curve: A laboratory study
-
C. D. Bailey, "Forgetting and the learning curve: A laboratory study," Mgt. Sci., vol. 35, pp. 340-352, 1989.
-
(1989)
Mgt. Sci.
, vol.35
, pp. 340-352
-
-
Bailey, C.D.1
-
8
-
-
0003218279
-
Boeing's effort to cushion itself from cycles backfires
-
Oct.
-
F. M. Biddle, "Boeing's effort to cushion itself from cycles backfires," Wall Street J., Oct. 1997.
-
(1997)
Wall Street J.
-
-
Biddle, F.M.1
-
9
-
-
0001927505
-
Measuring and managing technological knowledge
-
Fall
-
R. E. Bohn, "Measuring and managing technological knowledge," Sloan Mgt. Rev., pp. 61-73. Fall 1994.
-
(1994)
Sloan Mgt. Rev.
, pp. 61-73
-
-
Bohn, R.E.1
-
10
-
-
0026824741
-
The empowerment of service workers: What, why, how, and when
-
Spring
-
D. Bowen and E. Lawler, "The empowerment of service workers: What, why, how, and when," Sloan Mgt. Rev., vol. 33, pp. 31-40, Spring 1992.
-
(1992)
Sloan Mgt. Rev.
, vol.33
, pp. 31-40
-
-
Bowen, D.1
Lawler, E.2
-
11
-
-
0013451805
-
Investments in manufacturing quality: A response to increased demand in product variety
-
R. H. Burgess and C. Gaimon, "Investments in manufacturing quality: A response to increased demand in product variety," in Proc. Nat. Decisions Science Inst. (DSI), Honolulu, HI, Nov. 1994.
-
Proc. Nat. Decisions Science Inst. (DSI), Honolulu, HI, Nov. 1994
-
-
Burgess, R.H.1
Gaimon, C.2
-
12
-
-
0013445449
-
Revenue implications of manufacturing quality: A dynamic model
-
____, "Revenue implications of manufacturing quality: A dynamic model," in Proc. Nat. Decision Sciences Inst. (DSI), Boston, MA, Nov. 1995.
-
Proc. Nat. Decision Sciences Inst. (DSI), Boston, MA, Nov. 1995
-
-
Burgess, R.H.1
Gaimon, C.2
-
13
-
-
34548710216
-
Fading memories: A process theory of strategic business exits and dynamic environments
-
R. Burgleman, "Fading memories: A process theory of strategic business exits and dynamic environments," Admin. Sci. Quart., vol. 39, pp. 24-56, 1994.
-
(1994)
Admin. Sci. Quart.
, vol.39
, pp. 24-56
-
-
Burgleman, R.1
-
14
-
-
0033872873
-
Improving manufacturing performance through process change and knowledge creation
-
J. E. Carrillo and C. Gaimon, "Improving manufacturing performance through process change and knowledge creation," Mgt. Sci., vol. 46, pp. 265-288, 2000.
-
(2000)
Mgt. Sci.
, vol.46
, pp. 265-288
-
-
Carrillo, J.E.1
Gaimon, C.2
-
15
-
-
0013409252
-
Investing in knowledge-based resources: Analysis of uncertainty and managerial systems
-
in working paper, Mar.
-
____, "Investing in knowledge-based resources: Analysis of uncertainty and managerial systems," in working paper, Mar. 2001.
-
(2001)
-
-
Carrillo, J.E.1
Gaimon, C.2
-
16
-
-
4244013932
-
Improving time-to-market through investments in design and process capabilities
-
in working paper
-
J. E. Carrillo and R. Franza, "Improving time-to-market through investments in design and process capabilities," in working paper, 2001.
-
(2001)
-
-
Carrillo, J.E.1
Franza, R.2
-
17
-
-
0030281853
-
Capacity allocation for dynamic process change with quality and demand considerations
-
Nov.-Dec.
-
S. Chand, H. Moskowitz, A. Novak, I. Rehki, and G. Sorger, "Capacity allocation for dynamic process change with quality and demand considerations," Opns. Res., vol. 44, pp. 964-976, Nov.-Dec. 1996.
-
(1996)
Opns. Res.
, vol.44
, pp. 964-976
-
-
Chand, S.1
Moskowitz, H.2
Novak, A.3
Rehki, I.4
Sorger, G.5
-
18
-
-
0004083533
-
-
Boston, MA: Irwin/Mc-Graw-Hill
-
R. B. Chase, N. J. Aquilano, and F. R. Jacobs, Prod. Opns. Management: Manufacturing and Services, 8th ed. Boston, MA: Irwin/Mc-Graw-Hill, 1998.
-
(1998)
Prod. Opns. Management: Manufacturing and Services, 8th Ed.
-
-
Chase, R.B.1
Aquilano, N.J.2
Jacobs, F.R.3
-
19
-
-
0003013590
-
Beating Murphy's law
-
Spring
-
B. Chew, D. Leonard-Barton, and R. E. Bohn, "Beating Murphy's law," Sloan Mgt. Rev., pp. 5-16, Spring 1991.
-
(1991)
Sloan Mgt. Rev.
, pp. 5-16
-
-
Chew, B.1
Leonard-Barton, D.2
Bohn, R.E.3
-
20
-
-
0001113331
-
Project scope and project performance
-
K. Clark, "Project scope and project performance," Mgt. Sci., vol. 35, pp. 1247-1264, 1989.
-
(1989)
Mgt. Sci.
, vol.35
, pp. 1247-1264
-
-
Clark, K.1
-
22
-
-
84936166194
-
Absorptive capacity: A new perspective on learning and innovation
-
W. Cohen and D. Levinthal, "Absorptive capacity: A new perspective on learning and innovation," Admin. Sci. Quart., vol. 35, pp. 128-152, 1990.
-
(1990)
Admin. Sci. Quart.
, vol.35
, pp. 128-152
-
-
Cohen, W.1
Levinthal, D.2
-
23
-
-
0003119680
-
Fortune favors the prepared firm
-
____, "Fortune favors the prepared firm," Mgt. Sci., vol. 40, pp. 227-251, 1994.
-
(1994)
Mgt. Sci.
, vol.40
, pp. 227-251
-
-
Cohen, W.1
Levinthal, D.2
-
24
-
-
0002670658
-
Manufacturing innovation: Lessons from the Japanese auto industry
-
Fall
-
M. A. Cusumano, "Manufacturing innovation: Lessons from the Japanese auto industry," Sloan Mgt. Rev., pp. 29-39, Fall 1998.
-
(1998)
Sloan Mgt. Rev.
, pp. 29-39
-
-
Cusumano, M.A.1
-
25
-
-
0001036918
-
Organizational complexity and innovation: Developing and testing multiple contingency models
-
F. Damanpour, "Organizational complexity and innovation: Developing and testing multiple contingency models," Mgt. Sci., vol. 42, pp. 693-716, 1996.
-
(1996)
Mgt. Sci.
, vol.42
, pp. 693-716
-
-
Damanpour, F.1
-
26
-
-
0032112063
-
Putting the enterprise into the enterprise system
-
T.H. Davenport, "Putting the enterprise into the enterprise system," Harvard Bus. Rev., vol. 76, pp. 121-131, 1998.
-
(1998)
Harvard Bus. Rev.
, vol.76
, pp. 121-131
-
-
Davenport, T.H.1
-
27
-
-
0000436009
-
The adoption of radical and incremental innovations: An empirical analysis
-
R. Dewar and J. Dutton, "The adoption of radical and incremental innovations: An empirical analysis," Mgt. Sci., vol. 32, pp. 1422-1433, 1986.
-
(1986)
Mgt. Sci.
, vol.32
, pp. 1422-1433
-
-
Dewar, R.1
Dutton, J.2
-
28
-
-
0028769364
-
Flexibility and product variety in lot-sizing models
-
X. de Grotte, "Flexibility and product variety in lot-sizing models," Eur. J. Oper. Res., vol. 75, pp. 264-274, 1994.
-
(1994)
Eur. J. Oper. Res.
, vol.75
, pp. 264-274
-
-
De Grotte, X.1
-
29
-
-
38249002949
-
An approach to single parameter process design
-
X. de Groote and E. L. Porteus, "An approach to single parameter process design," Opns. Res. Letts., vol. 13, pp. 239-245, 1993.
-
(1993)
Opns. Res. Letts.
, vol.13
, pp. 239-245
-
-
De Groote, X.1
Porteus, E.L.2
-
30
-
-
85055308552
-
Japanese-style partnerships: Giving companies a competitive edge
-
Fall
-
J. H. Dyer and W. G. Ouchi, "Japanese-style partnerships: Giving companies a competitive edge," Sloan Mgt. Rev., pp. 51-63, Fall 1993.
-
(1993)
Sloan Mgt. Rev.
, pp. 51-63
-
-
Dyer, J.H.1
Ouchi, W.G.2
-
31
-
-
0022792327
-
Quality improvement and learning in productive systems
-
C. H. Fine, "Quality improvement and learning in productive systems," Mgt. Sci., vol. 32, pp. 1301-1305, 1986.
-
(1986)
Mgt. Sci.
, vol.32
, pp. 1301-1305
-
-
Fine, C.H.1
-
32
-
-
0001599465
-
Optimal investment in product-flexible manufacturing capacity
-
C. H. Fine and R. M. Freund, "Optimal investment in product-flexible manufacturing capacity," Mgt. Sci., vol. 36, pp. 449-466, 1990.
-
(1990)
Mgt. Sci.
, vol.36
, pp. 449-466
-
-
Fine, C.H.1
Freund, R.M.2
-
33
-
-
0024701171
-
Dynamic process improvement
-
C. H. Fine and E. L. Porteus, "Dynamic process improvement," Opns. Res., vol. 37, 580-591, 1989.
-
(1989)
Opns. Res.
, vol.37
, pp. 580-591
-
-
Fine, C.H.1
Porteus, E.L.2
-
34
-
-
0032001122
-
Flexibility and pricing decisions for high volume products with short life cycles
-
R. Franza and C. Gaimon, "Flexibility and pricing decisions for high volume products with short life cycles," Int. J. Flexible Manuf. Syst., vol. 10, pp. 43-71, 1998.
-
(1998)
Int. J. Flexible Manuf. Syst.
, vol.10
, pp. 43-71
-
-
Franza, R.1
Gaimon, C.2
-
35
-
-
0031238092
-
Planning information technology-worker systems
-
C. Gaimon, "Planning information technology-worker systems," Mgt. Sci., vol. 43, pp. 1308-1328, 1997.
-
(1997)
Mgt. Sci.
, vol.43
, pp. 1308-1328
-
-
Gaimon, C.1
-
36
-
-
3843064397
-
Flexibility and the choice of facilities under short product life cycles
-
C. Gaimon and V. Singhal, "Flexibility and the choice of facilities under short product life cycles," Eur. J. Oper. Res., vol. 60, pp. 211-223, 1992.
-
(1992)
Eur. J. Oper. Res.
, vol.60
, pp. 211-223
-
-
Gaimon, C.1
Singhal, V.2
-
37
-
-
84968285533
-
Transferring core manufacturing technologies in high-technology firms
-
summer
-
C. S. Galbraith, "Transferring core manufacturing technologies in high-technology firms," Calif. Mgt. Rev., pp. 56-70 summer 1990.
-
(1990)
Calif. Mgt. Rev.
, pp. 56-70
-
-
Galbraith, C.S.1
-
38
-
-
0024011428
-
A theory of innovation processes for computer-aided manufacturing technology
-
D. Gerwin, "A theory of innovation processes for computer-aided manufacturing technology," IEEE Trans. Eng. Mgt., vol. 35, pp. 90-100, 1988.
-
(1988)
IEEE Trans. Eng. Mgt.
, vol.35
, pp. 90-100
-
-
Gerwin, D.1
-
39
-
-
0027580682
-
Manufacturing flexibility: A strategic perspective
-
____, "Manufacturing flexibility: A strategic perspective," Mgt. Sci., vol. 39, pp. 395-410, 1993.
-
(1993)
Mgt. Sci.
, vol.39
, pp. 395-410
-
-
Gerwin, D.1
-
40
-
-
0026391838
-
A process approach to the implementation of new technology
-
P. S. Goodman and T. L. Griffith, "A process approach to the implementation of new technology," J. Eng. Techn. Mgt., vol. 8, pp. 261-285, 1991.
-
(1991)
J. Eng. Techn. Mgt.
, vol.8
, pp. 261-285
-
-
Goodman, P.S.1
Griffith, T.L.2
-
41
-
-
0033080004
-
From business reengineering to business process change management: A study of trends and practices
-
V. Grover, "From business reengineering to business process change management: A study of trends and practices," IEEE Trans. Eng. Mgt., vol. 46, pp. 36-46, 1999.
-
(1999)
IEEE Trans. Eng. Mgt.
, vol.46
, pp. 36-46
-
-
Grover, V.1
-
42
-
-
0031195488
-
Business process reengineering: A tutorial on the concept, evolution, method, technology, and application
-
V. Grover and M. Malhotra, "Business process reengineering: A tutorial on the concept, evolution, method, technology, and application," J. Opns. Mgt., vol. 15, pp. 193-213, 1997.
-
(1997)
J. Opns. Mgt.
, vol.15
, pp. 193-213
-
-
Grover, V.1
Malhotra, M.2
-
43
-
-
0026962245
-
Optimal mix of flexible and dedicated manufacturing capacities: Hedging against demand uncertainty
-
D. Gupta, Y. Gerchak, and J. A. Buzacott, "Optimal mix of flexible and dedicated manufacturing capacities: Hedging against demand uncertainty," Int. J. Prod. Econ., vol. 28, pp. 309-319, 1992.
-
(1992)
Int. J. Prod. Econ.
, vol.28
, pp. 309-319
-
-
Gupta, D.1
Gerchak, Y.2
Buzacott, J.A.3
-
44
-
-
0001167750
-
Reengineering work: Don't automate, obliterate
-
July-Aug.
-
M. Hammer, "Reengineering work: Don't automate, obliterate," Harvard Bus. Rev., vol. 68, pp. 104-112, July-Aug. 1990.
-
(1990)
Harvard Bus. Rev.
, vol.68
, pp. 104-112
-
-
Hammer, M.1
-
45
-
-
0032209022
-
Process innovation and learning by doing in semiconductor manufacturing
-
N. W. Hatch and D. C. Mowery, "Process innovation and learning by doing in semiconductor manufacturing," Mgt. Sci., vol. 44, pp. 1461-1477, 1998.
-
(1998)
Mgt. Sci.
, vol.44
, pp. 1461-1477
-
-
Hatch, N.W.1
Mowery, D.C.2
-
46
-
-
0001785027
-
Exploring the sources of productivity differences at the factory level
-
K. B. Clark, R. H. Hayes, and C. Lorenz, Eds. Cambridge, MA: Harvard Business School Press
-
R. H. Hayes and K. B. Clark, "Exploring the sources of productivity differences at the factory level," in The Uneasy Alliance: Managing the Productivity-Technology Dilemma, K. B. Clark, R. H. Hayes, and C. Lorenz, Eds. Cambridge, MA: Harvard Business School Press, 1985, pp. 151-188.
-
(1985)
The Uneasy Alliance: Managing the Productivity-Technology Dilemma
, pp. 151-188
-
-
Hayes, R.H.1
Clark, K.B.2
-
47
-
-
0002868975
-
Beyond world-class: The new manufacturing strategy
-
Jan.-Feb.
-
R. B. Hayes and G. P. Pisano, "Beyond world-class: The new manufacturing strategy," Harvard Bus. Rev., vol. 72, pp. 77-96, Jan.-Feb. 1994.
-
(1994)
Harvard Bus. Rev.
, vol.72
, pp. 77-86
-
-
Hayes, R.B.1
Pisano, G.P.2
-
48
-
-
25544454564
-
Performance measurement for process improvement
-
in working paper
-
G. G. Hegde and N. J. Nagarajan, "Performance measurement for process improvement," in working paper, 1991.
-
(1991)
-
-
Hegde, G.G.1
Nagarajan, N.J.2
-
49
-
-
0013457003
-
GM president says concern won't open all parts of saturn project at same time
-
August
-
P. Ingrassia, "GM president says concern won't open all parts of saturn project at same time," Wall Street J., August 1986.
-
(1986)
Wall Street J.
-
-
Ingrassia, P.1
-
50
-
-
0013355048
-
-
Conversions with, Coca-Cola Corp. Atlanta, GA
-
M. Jalvert, Conversions with, Coca-Cola Corp. Atlanta, GA, 1995.
-
(1995)
-
-
Jalvert, M.1
-
51
-
-
0013408626
-
-
Conversations with, INTEL Corp. Chandler, AZ
-
K. Kempf, Conversations with, INTEL Corp. Chandler, AZ, 1994.
-
(1994)
-
-
Kempf, K.1
-
52
-
-
0037758317
-
First-mover advantage: A synthesis, conceptual framework, and research propositions
-
R. A. Kerin, R. Varadarajan, and R. A. Peterson, "First-mover advantage: A synthesis, conceptual framework, and research propositions," J. Marketing, vol. 56, pp. 35-52, 1992.
-
(1992)
J. Marketing
, vol.56
, pp. 33-52
-
-
Kerin, R.A.1
Varadarajan, R.2
Peterson, R.A.3
-
53
-
-
0013404430
-
The shape of a new machine
-
July
-
K. Kerwin, K. Naughton, and E. H. Updike, "The shape of a new machine," Bus. Week, pp. 60-66, July 1995.
-
(1995)
Bus. Week
, pp. 60-66
-
-
Kerwin, K.1
Naughton, K.2
Updike, E.H.3
-
55
-
-
0035239259
-
Product development decisions: A review of the literature
-
V. Krishnan and K. T. Ulrich, "Product development decisions: A review of the literature," Mgt. Sci., vol. 47, pp. 1-21, 2001.
-
(2001)
Mgt. Sci.
, vol.47
, pp. 1-21
-
-
Krishnan, V.1
Ulrich, K.T.2
-
56
-
-
0030734685
-
Modeling the costs and benefits of delayed product differentiation
-
H. L. Lee and C. S. Tang, "Modeling the costs and benefits of delayed product differentiation," Mgt. Sci., vol. 43, pp. 43-53, 1997.
-
(1997)
Mgt. Sci.
, vol.43
, pp. 43-53
-
-
Lee, H.L.1
Tang, C.S.2
-
57
-
-
84938687906
-
Core capabilities and core rigidities: A paradox in managing new product development
-
D. Leonard-Barton, "Core capabilities and core rigidities: A paradox in managing new product development," Strategic Mgt. J., vol. 13, pp. 111-125, 1992.
-
(1992)
Strategic Mgt. J.
, vol.13
, pp. 111-125
-
-
Leonard-Barton, D.1
-
58
-
-
0032208328
-
Process improvement, quality, and learning effects
-
G. Li and S. Rajagopalan, "Process improvement, quality, and learning effects," Mgt. Sci., vol. 44, pp. 1517-1532, 1998.
-
(1998)
Mgt. Sci.
, vol.44
, pp. 1517-1532
-
-
Li, G.1
Rajagopalan, S.2
-
59
-
-
84944578298
-
Controlling your consultants
-
Oct.
-
R. B. Lieber, "Controlling your consultants," Fortune, pp. 114-115, Oct. 1996.
-
(1996)
Fortune
, pp. 114-115
-
-
Lieber, R.B.1
-
60
-
-
0001852791
-
Management of uncertainty in AMT implementation: The case of FMS
-
P. Lindberg, "Management of uncertainty in AMT implementation: The case of FMS," Int. J. Opns. and Prod. Mgt., vol. 12, pp. 57-75, 1992.
-
(1992)
Int. J. Opns. and Prod. Mgt.
, vol.12
, pp. 57-75
-
-
Lindberg, P.1
-
61
-
-
0342690356
-
Profiting from process improvements in the new semiconductor manufacturing environment
-
H. Matsuo, J. D. Martin, R. McIvor, and J. Ng, "Profiting from process improvements in the new semiconductor manufacturing environment," Techn. Opns. Rev., vol. 1, pp. 1-16, 1997.
-
(1997)
Techn. Opns. Rev.
, vol.1
, pp. 1-16
-
-
Matsuo, H.1
Martin, J.D.2
McIvor, R.3
Ng, J.4
-
62
-
-
0029403789
-
Training in CAD: An exploratory study of methods and benefits
-
C. M. McDermott and A. Marucheck, "Training in CAD: An exploratory study of methods and benefits," IEEE Trans. Eng. Mgt., vol. 42, pp. 410-418, 1995.
-
(1995)
IEEE Trans. Eng. Mgt.
, vol.42
, pp. 410-418
-
-
McDermott, C.M.1
Marucheck, A.2
-
63
-
-
0035149296
-
The impact of total productive maintenance practices on manufacturing performance
-
K. E. McKone, R. G. Schroeder, and K. O. Cua, "The impact of total productive maintenance practices on manufacturing performance," J. Opns. Mgt., vol. 19, 39-58, 2001.
-
(2001)
J. Opns. Mgt.
, vol.19
, pp. 39-58
-
-
McKone, K.E.1
Schroeder, R.G.2
Cua, K.O.3
-
64
-
-
84989064973
-
The strategic advantages of new manufacturing technologies for small firms
-
J. Meredith, "The strategic advantages of new manufacturing technologies for small firms," Strategic Mgt. J., vol. 8, pp. 249-258, 1987.
-
(1987)
Strategic Mgt. J.
, vol.8
, pp. 249-258
-
-
Meredith, J.1
-
66
-
-
0002238627
-
The effective management of organizational change
-
L. Lorsch, Ed. Englewood Cliffs, NJ: Prentice-Hall
-
D. A. Nadler, "The effective management of organizational change," in Handbook of Organizational Behavior, L. Lorsch, Ed. Englewood Cliffs, NJ: Prentice-Hall, 1987, pp. 358-369.
-
(1987)
Handbook of Organizational Behavior
, pp. 358-369
-
-
Nadler, D.A.1
-
68
-
-
0000650832
-
Learning-before-doing in the development of new process technology
-
G. P. Pisano, "Learning-before-doing in the development of new process technology," Res. Pol., vol. 25, pp. 1097-1119, 1996.
-
(1996)
Res. Pol.
, vol.25
, pp. 1097-1119
-
-
Pisano, G.P.1
-
69
-
-
0002499209
-
The new logic of high-tech R&D
-
Sept.-Oct.
-
G. P. Pisano and S. C. Wheelwright, "The new logic of high-tech R&D," Harvard Bus. Rev., vol. 73, pp. 93-105, Sept.-Oct. 1995.
-
(1995)
Harvard Bus. Rev.
, vol.73
, pp. 93-105
-
-
Pisano, G.P.1
Wheelwright, S.C.2
-
70
-
-
0000752798
-
Investing in reduced setups in the EOQ model
-
E. L. Porteus, "Investing in reduced setups in the EOQ model," Mgt. Sci., vol. 31, pp. 998-1010, 1985.
-
(1985)
Mgt. Sci.
, vol.31
, pp. 998-1010
-
-
Porteus, E.L.1
-
72
-
-
0029255688
-
The influence of planning on implementation success of advanced manufacturing technologies
-
K. Ramamurthy, "The influence of planning on implementation success of advanced manufacturing technologies," IEEE Trans. Eng. Mgt., vol. 42, pp. 62-73, 1995.
-
(1995)
IEEE Trans. Eng. Mgt.
, vol.42
, pp. 62-73
-
-
Ramamurthy, K.1
-
73
-
-
0013402497
-
The knowledge factory for accelerated learning practices
-
A. Roth, A. Marucheck, A. Kemp, and D. Trimble, "The knowledge factory for accelerated learning practices," Planning Rev., vol. 22, pp. 26-30, 1994.
-
(1994)
Planning Rev.
, vol.22
, pp. 26-30
-
-
Roth, A.1
Marucheck, A.2
Kemp, A.3
Trimble, D.4
-
74
-
-
0002986901
-
Manufacturing - Missing link in corporate strategy
-
May-June
-
W. Skimmer, "Manufacturing - Missing link in corporate strategy," Harvard Bus. Rev., vol. 47, pp. 136-145, May-June 1969.
-
(1969)
Harvard Bus. Rev.
, vol.47
, pp. 136-145
-
-
Skimmer, W.1
-
75
-
-
0023437336
-
Setup reduction and increased effective capacity
-
A. M. Spence and E. L. Porteus, "Setup reduction and increased effective capacity," Mgt. Sci., vol. 33, pp. 1291-1301, 1987.
-
(1987)
Mgt. Sci.
, vol.33
, pp. 1291-1301
-
-
Spence, A.M.1
Porteus, E.L.2
-
76
-
-
0013354416
-
Information integration for supply chain management: An empirical investigation of ERP systems in manufacturing
-
dissertation, Univ. North Carolina, Chapel Hill, NC
-
J. Stratman, "Information integration for supply chain management: An empirical investigation of ERP systems in manufacturing," dissertation, Univ. North Carolina, Chapel Hill, NC, 2001.
-
(2001)
-
-
Stratman, J.1
-
77
-
-
0003025175
-
Advanced manufacturing technology: Investment decision process part I
-
K. Swann and W. O'Keefe, "Advanced manufacturing technology: Investment decision process part I," Mgt. Dec., vol. 28, pp 20-31, 1990.
-
(1990)
Mgt. Dec.
, vol.28
, pp. 20-31
-
-
Swann, K.1
O'Keefe, W.2
-
78
-
-
0035283518
-
Learning and process improvement during production ramp-up
-
C. Terwiesch and R. E. Bohn, "Learning and process improvement during production ramp-up," Int. J. Prod. Econ., vol. 70, pp. 1-19, 2001.
-
(2001)
Int. J. Prod. Econ.
, vol.70
, pp. 1-19
-
-
Terwiesch, C.1
Bohn, R.E.2
-
79
-
-
84937382673
-
Managing digital design at BMW
-
S. Thomke, "Managing digital design at BMW," Design Mgt. J., vol. 12, pp. 20-24, 2001.
-
(2001)
Design Mgt. J.
, vol.12
, pp. 20-24
-
-
Thomke, S.1
-
80
-
-
0001858017
-
Exploiting opportunities for technological improvement in organizations
-
Fall
-
M. J. Tyre and W. J. Orlikowski, "Exploiting opportunities for technological improvement in organizations," Sloan Mgt. Rev., vol. 35, pp. 13-26, Fall 1993.
-
(1993)
Sloan Mgt. Rev.
, vol.35
, pp. 13-26
-
-
Tyre, M.J.1
Orlikowski, W.J.2
-
82
-
-
4244125410
-
Harvard business school case 693-053
-
Stermon Mills
-
D. M. Upton, "Harvard Business School Case 693-053," Stermon Mills, 1992.
-
(1992)
-
-
Upton, D.M.1
-
83
-
-
0030170937
-
Mechanisms for building and sustaining operations improvement
-
____, "Mechanisms for building and sustaining operations improvement," Eur. Mgt. J., vol. 14, pp. 215-230, 1996.
-
(1996)
Eur. Mgt. J.
, vol.14
, pp. 215-230
-
-
Upton, D.M.1
-
84
-
-
0031197670
-
Process range in manufacturing: An empirical study of flexibility
-
____, "Process range in manufacturing: An empirical study of flexibility," Mgt. Sci., vol. 43, pp. 1079-1092, 1997.
-
(1997)
Mgt. Sci.
, vol.43
, pp. 1079-1092
-
-
Upton, D.M.1
-
85
-
-
4244013930
-
Harvard business school case 697-037
-
D. M. Upton and A. McAfee, "Harvard Business School Case 697-037,", 1997.
-
(1997)
-
-
Upton, D.M.1
McAfee, A.2
-
86
-
-
0032136536
-
Investment strategies for flexible resources
-
J. A. Van Mieghem, "Investment strategies for flexible resources," Mgt. Sci., vol. 44, pp. 1071-1086, 1998.
-
(1998)
Mgt. Sci.
, vol.44
, pp. 1071-1086
-
-
Van Mieghem, J.A.1
-
87
-
-
0013401938
-
Assembly matters in atlanta
-
Sept.
-
G. S. Vasilash, "Assembly matters in atlanta," Production, vol. 107, pp. 38-41, Sept. 1995.
-
(1995)
Production
, vol.107
, pp. 38-41
-
-
Vasilash, G.S.1
-
88
-
-
0000055031
-
Cummins engine flexes its factory
-
Mar.-Apr.
-
R. Venkatesan, "Cummins engine flexes its factory," Harvard Bus. Rev., vol. 68, pp. 120-127, Mar.-Apr. 1990.
-
(1990)
Harvard Bus. Rev.
, vol.68
, pp. 120-127
-
-
Venkatesan, R.1
-
89
-
-
0002533915
-
The second toyota paradox: How delaying decisions can make better cars faster
-
spring
-
A. Ward, J. K. Liker, J. J. Cristiano, and D. K. Sobek II, "The second toyota paradox: How delaying decisions can make better cars faster," Sloan Mgt. Rev., vol. 36, pp. 43-61, spring 1995.
-
(1995)
Sloan Mgt. Rev.
, vol.36
, pp. 43-61
-
-
Ward, A.1
Liker, J.K.2
Cristiano, J.J.3
Sobek D.K. II4
-
90
-
-
0026825151
-
Creating project plans to focus product development
-
S. C. Wheelwright and K. B. Clark, "Creating project plans to focus product development," Harvard Bus. Rev., vol. 70, pp. 70-82, 1992.
-
(1992)
Harvard Bus. Rev.
, vol.70
, pp. 70-82
-
-
Wheelwright, S.C.1
Clark, K.B.2
|