메뉴 건너뛰기




Volumn 59, Issue 5, 2002, Pages 725-737

Mechanical design of the recirculating, terminal pumping in the Lund Pelletron, and experimental experience

Author keywords

Accelerator mass spectrometry; AMS; Electrostatic accelerator; Pelletron; Terminal pumping system

Indexed keywords

ELECTRIC POTENTIAL; ELECTRIC POWER FACTOR; ELECTROSTATICS; MASS SPECTROMETRY; PARTICLE ACCELERATORS;

EID: 0036851705     PISSN: 03044289     EISSN: None     Source Type: Journal    
DOI: 10.1007/s12043-002-0085-5     Document Type: Conference Paper
Times cited : (5)

References (21)
  • 4
    • 0001360698 scopus 로고    scopus 로고
    • The modification of an over 20-year old pelletron to function as a high quality AMS facility
    • 13-15 October, Jülich, Germany (World Scientific ISBN 981-02-3852-52-5)
    • R. Hellborg, K. Håkansson and G. Skog, The modification of an over 20-year old pelletron to function as a high quality AMS facility, Proc. 31st Symp. of Northeastern Accelerator Personnel, 13-15 October 1997, Jülich, Germany, p. 165 (World Scientific ISBN 981-02-3852-52-5).
    • (1997) Proc. 31st Symp. of Northeastern Accelerator Personnel , pp. 165
    • Hellborg, R.1    Håkansson, K.2    Skog, G.3
  • 8
    • 0003100626 scopus 로고    scopus 로고
    • A new design of terminal pumping in the Lund pelletron tandem
    • Proc. 8th Int. Conf. on Heavy-Ion Accelerator Technology Argonne Nat Lab USA, 5-9 October
    • K. Håkansson and R. Hellborg, A new design of terminal pumping in the Lund pelletron tandem, Proc. 8th Int. Conf. on Heavy-Ion Accelerator Technology, Argonne Nat Lab USA, 5-9 October 1998, p. 94 (AIP conference proceedings no. 473).
    • (1998) AIP conference proceedings , vol.473 , pp. 94
    • Håkansson, K.1    Hellborg, R.2
  • 17
  • 21
    • 85036868091 scopus 로고    scopus 로고
    • The pressure profile in the Lund Pelletron accelerator when using the newly installed terminal pumping
    • to be submitted
    • P. Persson, R. Hellborg, M. Kiisk and G. Skog, The pressure profile in the Lund Pelletron accelerator when using the newly installed terminal pumping, Nucl Instrum. Methods A (to be submitted).
    • Nucl Instrum. Methods A
    • Persson, P.1    Hellborg, R.2    Kiisk, M.3    Skog, G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.