-
1
-
-
0001177268
-
-
R. Hellborg, L.J. Curtis, B. Erlandsson, M. Faarinen, M. Kiisk, C.-E. Magnusson, P. Persson, G. Skog and K. Stenström, Phys. Scr. 61, 530 (2000).
-
(2000)
Phys. Scr.
, vol.61
, pp. 530
-
-
Hellborg, R.1
Curtis, L.J.2
Erlandsson, B.3
Faarinen, M.4
Kiisk, M.5
Magnusson, C.-E.6
Persson, P.7
Skog, G.8
Stenström, K.9
-
2
-
-
0008427970
-
-
P. Persson, K. Freiman, R. Hellborg, K. Håkansson, G. Skog and K. Stenström, Rev. Sci. Instrum. 69(2), 1188 (1998).
-
(1998)
Rev. Sci. Instrum.
, vol.69
, Issue.2
, pp. 1188
-
-
Persson, P.1
Freiman, K.2
Hellborg, R.3
Håkansson, K.4
Skog, G.5
Stenström, K.6
-
4
-
-
0001360698
-
The modification of an over 20-year old pelletron to function as a high quality AMS facility
-
13-15 October, Jülich, Germany (World Scientific ISBN 981-02-3852-52-5)
-
R. Hellborg, K. Håkansson and G. Skog, The modification of an over 20-year old pelletron to function as a high quality AMS facility, Proc. 31st Symp. of Northeastern Accelerator Personnel, 13-15 October 1997, Jülich, Germany, p. 165 (World Scientific ISBN 981-02-3852-52-5).
-
(1997)
Proc. 31st Symp. of Northeastern Accelerator Personnel
, pp. 165
-
-
Hellborg, R.1
Håkansson, K.2
Skog, G.3
-
5
-
-
85036879569
-
-
Lund, Sweden, 22-25 October (to be published)
-
Mikko Faarinen, Ragnar Hellborg, Madis Kiisk, Carl-Erik Magnusson, Per Persson, Göran Skog, Kristina Stenström and Sergei Bazhal, Proc. 2001 Symp. of Northeastern Accelerator Personnel, Lund, Sweden, 22-25 October 2001 (to be published).
-
(2001)
Proc. 2001 Symp. of Northeastern Accelerator Personnel
-
-
Faarinen, M.1
Hellborg, R.2
Kiisk, M.3
Magnusson, C.-E.4
Persson, P.5
Skog, G.6
Stenström, K.7
Bazhal, S.8
-
6
-
-
58149212956
-
-
A. Wiebert, B. Erlandsson, R. Hellborg, K. Stenström and G. Skog, Nucl. Instrum. Methods A366, 17 (1995).
-
(1995)
Nucl. Instrum. Methods
, vol.A366
, pp. 17
-
-
Wiebert, A.1
Erlandsson, B.2
Hellborg, R.3
Stenström, K.4
Skog, G.5
-
7
-
-
0000161679
-
-
A. Wiebert, B. Erlandsson, R. Hellborg, K. Stenström and G. Skog, Nucl. Instrum. Methods A364, 201 (1995).
-
(1995)
Nucl. Instrum. Methods
, vol.A364
, pp. 201
-
-
Wiebert, A.1
Erlandsson, B.2
Hellborg, R.3
Stenström, K.4
Skog, G.5
-
8
-
-
0003100626
-
A new design of terminal pumping in the Lund pelletron tandem
-
Proc. 8th Int. Conf. on Heavy-Ion Accelerator Technology Argonne Nat Lab USA, 5-9 October
-
K. Håkansson and R. Hellborg, A new design of terminal pumping in the Lund pelletron tandem, Proc. 8th Int. Conf. on Heavy-Ion Accelerator Technology, Argonne Nat Lab USA, 5-9 October 1998, p. 94 (AIP conference proceedings no. 473).
-
(1998)
AIP conference proceedings
, vol.473
, pp. 94
-
-
Håkansson, K.1
Hellborg, R.2
-
9
-
-
0008701484
-
Improvements of the terminal pumping in the Lund pelletron tandem
-
Knoxville, Tennessee, 25-28 October (to be published)
-
K. Håkansson, R. Hellborg, S. Uthas and F. Olsson, Improvements of the terminal pumping in the Lund pelletron tandem, Proc. 1999 Symp. of Northeastern Accelerator Personnel, Knoxville, Tennessee, 25-28 October 1999 (to be published).
-
(1999)
Proc. 1999 Symp. of Northeastern Accelerator Personnel
-
-
Håkansson, K.1
Hellborg, R.2
Uthas, S.3
Olsson, F.4
-
11
-
-
0000905757
-
-
H.W. Lee, A. Galindo-Uribarri, K.H. Chang, L.R. Kilius and A.E. Litherland, Nucl. Instrum. Methods B5, 208 (1984).
-
(1984)
Nucl. Instrum. Methods
, vol.B5
, pp. 208
-
-
Lee, H.W.1
Galindo-Uribarri, A.2
Chang, K.H.3
Kilius, L.R.4
Litherland, A.E.5
-
12
-
-
0001533492
-
-
G. Bonani, P. Eberhardt, H.J. Hofmann, Th.R. Niklaus, M. Suter, H.A. Synal and W. Wölfli, Nucl. Instrum. Methods B52, 338 (1990).
-
(1990)
Nucl. Instrum. Methods
, vol.B52
, pp. 338
-
-
Bonani, G.1
Eberhardt, P.2
Hofmann, H.J.3
Niklaus, Th.R.4
Suter, M.5
Synal, H.A.6
Wölfli, W.7
-
14
-
-
0035166787
-
26Al investigations at the AMS-laboratory in Lund
-
26Al investigations at the AMS-laboratory in Lund, J. Inorganic Biochemistry 87, 57 (2001).
-
(2001)
J. Inorganic Biochemistry
, vol.87
, pp. 57
-
-
Faarinen, M.1
Magnusson, C.-E.2
Hellborg, R.3
Mattsson, S.4
Kiisk, M.5
Persson, P.6
Schütz, A.7
-
15
-
-
85036859531
-
-
P. Persson, M. Kiisk, B. Erlandsson, M. Faarinen, R. Hellborg, G. Skog and K. Stenström, Nucl. Instrum. Methods B172, 190 (2000).
-
(2000)
Nucl. Instrum. Methods
, vol.B172
, pp. 190
-
-
Persson, P.1
Kiisk, M.2
Erlandsson, B.3
Faarinen, M.4
Hellborg, R.5
Skog, G.6
Stenström, K.7
-
16
-
-
85036887795
-
Radiocarbon dating with the Lund Pelletron accelerator
-
Lund, Sweden, 22-25 October
-
G. Skog, R. Hellborg, K. Stenström, P. Persson, B. Erlandsson, M. Faarinen and M. Kiisk, Radiocarbon dating with the Lund Pelletron accelerator, Proc. 2001 Symp. of Northeastern Accelerator Personnel, Lund, Sweden, 22-25 October 2001.
-
(2001)
Proc. 2001 Symp. of Northeastern Accelerator Personnel
-
-
Skog, G.1
Hellborg, R.2
Stenström, K.3
Persson, P.4
Erlandsson, B.5
Faarinen, M.6
Kiisk, M.7
-
17
-
-
85036901133
-
The charge state distribution of a carbon beam measured at the Lund Pelletron accelerator with the newly installed terminal pumping system in use
-
in press
-
M. Kiisk, B. Erlansson, M. Faarinen, R. Hellborg, K. Håkansson, P. Persson, G. Skog and K. Stenström, The charge state distribution of a carbon beam measured at the Lund Pelletron accelerator with the newly installed terminal pumping system in use, Nucl Instrum. Methods A (in press).
-
Nucl Instrum. Methods A
-
-
Kiisk, M.1
Erlansson, B.2
Faarinen, M.3
Hellborg, R.4
Håkansson, K.5
Persson, P.6
Skog, G.7
Stenström, K.8
-
18
-
-
0011700085
-
2 and Ar gas stripper with terminal pumping
-
Lund, Sweden, 22-25 October (to be published)
-
2 and Ar gas stripper with terminal pumping, Proc. 2001 Symp. of Northeastern Accelerator Personnel, Lund, Sweden, 22-25 October 2001 (to be published).
-
(2001)
Proc. 2001 Symp. of Northeastern Accelerator Personnel
-
-
Kiisk, M.1
Hellborg, R.2
Faarinen, M.3
Håkansson, K.4
Persson, P.5
Skog, G.6
Stenström, K.7
-
19
-
-
0011701312
-
-
in first draft
-
M. Kiisk, R. Hellborg, B. Erlandsson, M. Faarinen, P. Persson, G. Skog and K. Stenström, The charge state distribution of a Be, C and Al ion beams at the Lund Pelletron accelerator with installed terminal pumping for Ar stripper (in first draft).
-
The charge state distribution of a Be, C and Al ion beams at the Lund Pelletron accelerator with installed terminal pumping for Ar stripper
-
-
Kiisk, M.1
Hellborg, R.2
Erlandsson, B.3
Faarinen, M.4
Persson, P.5
Skog, G.6
Stenström, K.7
-
20
-
-
0034291153
-
-
M. Kiisk, P. Persson, R. Hellborg, Z. Smit, B. Erlandsson, M. Faarinen, K. Stenström and G. Skog, Nucl. Instrum. Methods B172, 182 (2000).
-
(2000)
Nucl. Instrum. Methods
, vol.B172
, pp. 182
-
-
Kiisk, M.1
Persson, P.2
Hellborg, R.3
Smit, Z.4
Erlandsson, B.5
Faarinen, M.6
Stenström, K.7
Skog, G.8
-
21
-
-
85036868091
-
The pressure profile in the Lund Pelletron accelerator when using the newly installed terminal pumping
-
to be submitted
-
P. Persson, R. Hellborg, M. Kiisk and G. Skog, The pressure profile in the Lund Pelletron accelerator when using the newly installed terminal pumping, Nucl Instrum. Methods A (to be submitted).
-
Nucl Instrum. Methods A
-
-
Persson, P.1
Hellborg, R.2
Kiisk, M.3
Skog, G.4
|