메뉴 건너뛰기




Volumn 29, Issue 13, 2002, Pages 1873-1901

A multi-level hybrid framework applied to the general flow-shop scheduling problem

Author keywords

Flow shop scheduling; Intensification and diversification; Multi level hybrid system; Tabu search

Indexed keywords

COMPUTER AIDED MANUFACTURING; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING;

EID: 0036833015     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(01)00064-8     Document Type: Article
Times cited : (24)

References (49)
  • 23
    • 0000765086 scopus 로고
    • Some numerical experiments for an M x J flow shop and its decision-theoretical aspects
    • (1960) Operations Research , vol.8 , pp. 178-184
    • Heller, J.1
  • 31
    • 84989487658 scopus 로고
    • Heuristics for integer programming using surrogate constraints
    • (1977) Decision Sciences , vol.8 , Issue.1 , pp. 156-166
    • Glover, F.1
  • 39
    • 0000478729 scopus 로고
    • Solving resource-constrained network problems by implicit enumeration: Non preemptive case
    • (1970) Operations Research , vol.18 , pp. 263-278
    • Schrage, L.1
  • 44
    • 0003533609 scopus 로고    scopus 로고
    • Performance of various computers using standard linear equations software
    • Computer Science Department, University of Tennessee, Knoxville, TN 37996-1301, USA, September 14
    • (1999) Technical Report CS - 89 - 85
    • Dongarra, J.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.