메뉴 건너뛰기




Volumn 15, Issue 9, 2002, Pages 72-80

Simultaneous optimal auction and unit commitment for deregulated electricity markets

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0036829328     PISSN: 10406190     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1040-6190(02)00380-9     Document Type: Article
Times cited : (23)

References (21)
  • 2
    • 0004084565 scopus 로고    scopus 로고
    • Measuring Market Inefficiencies in California's Restructured Wholesale Electricity Market
    • University of California Energy Institute, Center for the Study of Energy Markets, Working Paper 102, June
    • S. Borenstein, J. Bushnell, and F. Wolak, Measuring Market Inefficiencies in California's Restructured Wholesale Electricity Market, University of California Energy Institute, Center for the Study of Energy Markets, Working Paper 102, June 2002.
    • (2002)
    • Borenstein, S.1    Bushnell, J.2    Wolak, F.3
  • 3
    • 85170512109 scopus 로고    scopus 로고
    • Comprehensive Market Design Proposal
    • California Independent System Operator (CAISO), April 29
    • California Independent System Operator (CAISO), Comprehensive Market Design Proposal, April 29, 2002.
    • (2002)
  • 4
    • 85170511673 scopus 로고    scopus 로고
    • California Independent System Operator (CAISO), MD02 Tariff Filings, Attachment A, Appendix K: Locational Marginal Pricing, filed with FERC on June 17
    • California Independent System Operator (CAISO), MD02 Tariff Filings, Attachment A, Appendix K: Locational Marginal Pricing, filed with FERC on June 17, 2002.
    • (2002)
  • 5
    • 0023534142 scopus 로고
    • Optimization-Based Methods for Operations Scheduling
    • A. Cohen, Optimization-Based Methods for Operations Scheduling, PROC. IEEE, 1987, 75 (12), at 1574-1591.
    • (1987) PROC. IEEE , vol.75 , Issue.12 , pp. 1574-1591
    • Cohen, A.1
  • 7
    • 0004084573 scopus 로고    scopus 로고
    • Order Proposing Remedies for California Wholesale Electricity Markets
    • Federal Energy Regulatory Commission Order, Issued Nov. 1
    • Federal Energy Regulatory Commission Order, Order Proposing Remedies for California Wholesale Electricity Markets, Issued Nov. 1, 2000.
    • (2000)
  • 8
    • 0005199564 scopus 로고    scopus 로고
    • Working Paper on Standardized Transmission Service and Wholesale Electric Market Design
    • Federal Energy Regulatory Commission, March 15
    • Federal Energy Regulatory Commission, Working Paper on Standardized Transmission Service and Wholesale Electric Market Design, March 15, 2002.
    • (2002)
  • 10
    • 0028426230 scopus 로고
    • Optimization-Based Scheduling of Hydrothermal Power Systems with Pumped-Storage Units
    • May
    • X.Guan, P.B. Luh, H. Yan, and P. Rogan, Optimization-Based Scheduling of Hydrothermal Power Systems with Pumped-Storage Units, IEEE TRANS. POWER SYST., May 1994, 9 (2), at 1023-1031.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.2 , pp. 1023-1031
    • Guan, X.1    Luh, P.B.2    Yan, H.3    Rogan, P.4
  • 11
    • 0003771241 scopus 로고    scopus 로고
    • A Quantitative Analysis of Pricing Behavior in California's Wholesale Electricity Market during Summer 2000: The Final Word
    • Rev. Feb. 2002, available at
    • P.L. Joskow and E. Kahn, A Quantitative Analysis of Pricing Behavior in California's Wholesale Electricity Market during Summer 2000: The Final Word, Rev. Feb. 2002, available at http://econ-www.mit.edu/faculty/pjoskow/files/joskow-K.pdf.
    • Joskow, P.L.1    Kahn, E.2
  • 12
    • 0003879870 scopus 로고    scopus 로고
    • Pricing in the California Power Exchange Electricity Market: Should California Switch from Uniform Pricing to Pay-as-Bid Pricing?
    • Blue Ribbon Panel Report, Jan
    • A.E. Kahn, P.C. Cramton, R.H. Porter, and R.D. Tabora, Pricing in the California Power Exchange Electricity Market: Should California Switch from Uniform Pricing to Pay-as-Bid Pricing? Blue Ribbon Panel Report, Jan. 2001.
    • (2001)
    • Kahn, A.E.1    Cramton, P.C.2    Porter, R.H.3    Tabora, R.D.4
  • 13
    • 85170506317 scopus 로고    scopus 로고
    • Unit Commitment with Transmission Security and Voltage Constraints
    • June, PE-416-PWRS-2-06-1998
    • H. Ma and S.M. Shahidehpour, Unit Commitment with Transmission Security and Voltage Constraints, IEEE Summer Meeting, June 1998, PE-416-PWRS-2-06-1998.
    • (1998) IEEE Summer Meeting
    • Ma, H.1    Shahidehpour, S.M.2
  • 14
    • 0030142825 scopus 로고    scopus 로고
    • Optimization-Based Sale Transactions and Hydrothermal Scheduling
    • May
    • B. Prasannan, P.B. Luh, H. Yan, J.A. Palmberg, and L. Zhang, Optimization-Based Sale Transactions and Hydrothermal Scheduling, IEEE TRANS, POWER SYST., May 1996, 11 (2), at 654-659.
    • (1996) IEEE Trans, Power Syst , vol.11 , Issue.2 , pp. 654-659
    • Prasannan, B.1    Luh, P.B.2    Yan, H.3    Palmberg, J.A.4    Zhang, L.5
  • 15
    • 0029356615 scopus 로고
    • A Direct Method for Security-Constrained Unit Commitment
    • Feb
    • J.J. Shaw, A Direct Method for Security-Constrained Unit Commitment, IEEE TRANS. POWER SYST., Feb. 1994, 10 (3), at 279-287.
    • (1994) IEEE Trans. Power Syst , vol.10 , Issue.3 , pp. 279-287
    • Shaw, J.J.1
  • 16
    • 0005125005 scopus 로고    scopus 로고
    • Empirical Evidence of Strategic Bidding in California ISO Real Time Market
    • March 21, for CAISO
    • A. Sheffrin, Empirical Evidence of Strategic Bidding in California ISO Real Time Market, March 21, 2001, for CAISO.
    • (2001)
    • Sheffrin, A.1
  • 17
    • 85170492836 scopus 로고    scopus 로고
    • Market Power Mitigation Measures and Their Impacts on the California Electricity Markets
    • Presented at 14th Annual Western Conference of Center for Research in Regulated Industries, in San Diego, June 2001
    • G.A. Stern, Market Power Mitigation Measures and Their Impacts on the California Electricity Markets, Presented at 14th Annual Western Conference of Center for Research in Regulated Industries (http://crri.rutgers.edu) in San Diego, June 2001.
    • Stern, G.A.1
  • 18
    • 0027649191 scopus 로고
    • Scheduling of Hydrothermal Power System
    • Aug
    • H. Yan, P.B. Luh, X. Guan and P. Rogan, Scheduling of Hydrothermal Power System, IEEE TRANS. POWER SYST., Aug 1993, 8 (3), at 1358-1365.
    • (1993) IEEE Trans. Power Syst , vol.8 , Issue.3 , pp. 1358-1365
    • Yan, H.1    Luh, P.B.2    Guan, X.3    Rogan, P.4
  • 19
    • 0028596821 scopus 로고    scopus 로고
    • Scheduling of Hydrothermal Power Systems Using the Augmented Lagrangian Decomposition and Coordination Technique
    • H. Yan, P.B. Luh, and L. Zhang, Scheduling of Hydrothermal Power Systems Using the Augmented Lagrangian Decomposition and Coordination Technique, Proceedings of 1994 American Control Conference.
    • Proceedings of 1994 American Control Conference
    • Yan, H.1    Luh, P.B.2    Zhang, L.3
  • 20
    • 0031144636 scopus 로고    scopus 로고
    • A Fuzzy Optimization-Based Method for Integrated Power System Scheduling and Inter-Utility Power Transaction With Uncertainties
    • May
    • H. Yan and P.B. Luh, A Fuzzy Optimization-Based Method for Integrated Power System Scheduling and Inter-Utility Power Transaction With Uncertainties, IEEE TRANS. POWER SYST., May 1997, 12 (2), at 756-763.
    • (1997) IEEE Trans. Power Syst , vol.12 , Issue.2 , pp. 756-763
    • Yan, H.1    Luh, P.B.2
  • 21
    • 0028430844 scopus 로고
    • Optimization-Based Inter-Utility Power Purchases
    • May
    • L. Zhang, P.B. Luh, X. Guan and G. Merchel, Optimization-Based Inter-Utility Power Purchases, IEEE TRANS. POWER SYST., May 1994, 9 (2), at 891-897.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.2 , pp. 891-897
    • Zhang, L.1    Luh, P.B.2    Guan, X.3    Merchel, G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.