-
1
-
-
4243758580
-
Right-of-Way maintenance: Changing options
-
Sept.
-
G. Paula, "Right-of-Way maintenance: Changing options," Elect. World T & D Special Rep., vol. 203, no. 9, pp. S5-S15, Sept. 1989.
-
(1989)
Elect. World T & D Special Rep.
, vol.203
, Issue.9
-
-
Paula, G.1
-
2
-
-
0030261388
-
Distribution system reliability assessment using hierarchical markov modeling
-
Oct.
-
R.E. Brown, S. Gupta, R.D. Christie, S.S. Venkata, and R. Fletcher, "Distribution system reliability assessment using hierarchical markov modeling," IEEE Trans. Power Delivery, vol. 11, pp. 1929-1934, Oct. 1996.
-
(1996)
IEEE Trans. Power Delivery
, vol.11
, pp. 1929-1934
-
-
Brown, R.E.1
Gupta, S.2
Christie, R.D.3
Venkata, S.S.4
Fletcher, R.5
-
3
-
-
0026854269
-
RELRAD-an analytical approach for distribution system reliability assessment
-
Apr.
-
G. Kjolle and K. Sand, "RELRAD-an analytical approach for distribution system reliability assessment," IEEE Trans. Power Delivery, vol. 7, pp. 809-814, Apr. 1992.
-
(1992)
IEEE Trans. Power Delivery
, vol.7
, pp. 809-814
-
-
Kjolle, G.1
Sand, K.2
-
4
-
-
0001589038
-
The optimal reliability-constrained line clearance scheduling problem
-
Manhattan, KS, Sept.
-
L. Dai and R.D. Christie, "The optimal reliability-constrained line clearance scheduling problem," in Proc. 26th Annu. North Amer. Power Symp., vol. 1, Manhattan, KS, Sept. 1994, pp. 244-249.
-
(1994)
Proc. 26th Annu. North Amer. Power Symp.
, vol.1
, pp. 244-249
-
-
Dai, L.1
Christie, R.D.2
-
5
-
-
0022328259
-
Characteristics of a simulated high impedance fault
-
Newcastle, Australia, Oct.
-
T.R. Blackburn and L.T. Pau, "Characteristics of a simulated high impedance fault," in Proc. Elect. Energy Conf. Modern Trends Generation, Transm., Distrib., Utilization Elect. Energy, Newcastle, Australia, Oct. 1985, pp. 301-304.
-
(1985)
Proc. Elect. Energy Conf. Modern Trends Generation, Transm., Distrib., Utilization Elect. Energy
, pp. 301-304
-
-
Blackburn, T.R.1
Pau, L.T.2
-
6
-
-
0021624250
-
Trees in electrical contact with high voltage lines
-
Paris, France
-
E. Hoffmann, H.V. Rheinbaben, and B. Stösser, "Trees in electrical contact with high voltage lines," in Proc. Int. Conf. Large High Voltage Elect. Syst., Proc. 30th Sess., CIGRE, vol. 2, Paris, France, 1984, p. 22.3.
-
(1984)
Proc. Int. Conf. Large High Voltage Elect. Syst., Proc. 30th Sess., CIGRE
, vol.2
, pp. 223
-
-
Hoffmann, E.1
Rheinbaben, H.V.2
Stösser, B.3
-
7
-
-
0030303279
-
Investigating parameters of growth equations
-
Nov.
-
V. Shvets and B. Zeide, "Investigating parameters of growth equations," Can. J. Forest Res., vol. 26, no. 11, pp. 1980-1990, Nov. 1996.
-
(1996)
Can. J. Forest Res.
, vol.26
, Issue.11
, pp. 1980-1990
-
-
Shvets, V.1
Zeide, B.2
-
8
-
-
0027804336
-
Adjusting a process-base growth model for varying site conditions through parameter estimation
-
Sept.
-
R. Sievanen and T.E. Burk, "Adjusting a process-base growth model for varying site conditions through parameter estimation," Can. J. Forest Res., vol. 23, no. 9, pp. 1837-1851, Sept. 1993.
-
(1993)
Can. J. Forest Res.
, vol.23
, Issue.9
, pp. 1837-1851
-
-
Sievanen, R.1
Burk, T.E.2
-
9
-
-
0011865264
-
An integro-Differential equation model of tree height growth
-
Minneapolis, MN, Aug.
-
D.C. Hamlin and R.A. Leary, "An integro-Differential equation model of tree height growth," in Proc. IUFRO Conf., vol. 2, Minneapolis, MN, Aug. 1987, pp. 683-690.
-
(1987)
Proc. IUFRO Conf.
, vol.2
, pp. 683-690
-
-
Hamlin, D.C.1
Leary, R.A.2
-
10
-
-
0011825256
-
Responses of douglas fir to long term variations in precipitation and temperature in Western Washington
-
College of Forest Resources, Univ. Washington, Seattle
-
J. Hendeson and L. Brubaker, "Responses of douglas fir to long term variations in precipitation and temperature in Western Washington," in Douglas-Fir: Stand Management of the Future: College of Forest Resources, Univ. Washington, Seattle, 1986, pp. 162-167.
-
(1986)
Douglas-Fir: Stand Management of the Future
, pp. 162-167
-
-
Hendeson, J.1
Brubaker, L.2
|