![]() |
Volumn 32, Issue 3, 2002, Pages 316-331
|
Theoretical proof of edge search strategy applied to power plant start-up scheduling
|
Author keywords
Edge search; Genetic algorithms; Optimization; Power plant startup; Scheduling
|
Indexed keywords
ROTOR STRESSES;
COMPUTER SIMULATION;
GENETIC ALGORITHMS;
ITERATIVE METHODS;
OPTIMIZATION;
ROTORS;
SCHEDULING;
STRESS ANALYSIS;
TURBINES;
POWER PLANTS;
|
EID: 0036608713
PISSN: 10834419
EISSN: None
Source Type: Journal
DOI: 10.1109/TSMCB.2002.999808 Document Type: Article |
Times cited : (9)
|
References (24)
|