|
Volumn 17, Issue 2, 2002, Pages 277-282
|
Probabilistic production costing modeled with AMPL
|
Author keywords
Hydrogeneration optimization; Hydrothermal scheduling; Long term operating planning; Modeling languages; Nonlinear optimization
|
Indexed keywords
COMPUTER SIMULATION;
ELECTRIC LOADS;
ELECTRIC POWER GENERATION;
OPTIMIZATION;
PROBABILITY DISTRIBUTIONS;
RANDOM PROCESSES;
HYDROGENERATION OPTIMIZATION;
ELECTRIC POWER SYSTEMS;
|
EID: 0036577175
PISSN: 08858950
EISSN: None
Source Type: Journal
DOI: 10.1109/TPWRS.2002.1007893 Document Type: Article |
Times cited : (5)
|
References (13)
|