|
Volumn 12, Issue 1, 2002, Pages 305-308
|
Completion of superconducting magnet production at BNL for the HERA luminosity upgrade
a a a a a a a a a a a |
Author keywords
Accelerator magnets; Computer controlled winding; Insertion region magnets; Superconducting magnets
|
Indexed keywords
ACCELERATOR MAGNETS;
COMPUTER SIMULATION;
COOLING;
CRYOGENICS;
CRYOSTATS;
SUPERCONDUCTING CABLES;
SYNCHROTRON RADIATION;
COMPUTER CONTROLLED WINDING;
FIELD QUALITY MEASUREMENT;
SUPERCONDUCTING MULTIFUNCTION MAGNETS;
SUPERCONDUCTING MAGNETS;
|
EID: 0036510130
PISSN: 10518223
EISSN: None
Source Type: Journal
DOI: 10.1109/TASC.2002.1018406 Document Type: Conference Paper |
Times cited : (7)
|
References (4)
|