메뉴 건너뛰기




Volumn 2, Issue , 2002, Pages 1095-1099

Reconfiguring a primary industrial network based on reliability studies

Author keywords

Economical analysis; Energy not supplied; Industrial distribution electrical systems; Modeling; Reliability

Indexed keywords

INDUSTRIAL NETWORKS;

EID: 0036443084     PISSN: 01972618     EISSN: None     Source Type: Journal    
DOI: 10.1109/IAS.2002.1042696     Document Type: Article
Times cited : (2)

References (8)
  • 3
    • 0026156854 scopus 로고
    • A reliability test system for educational purposes-Basic distribution system data and results
    • May
    • Allan, R.N., R. Billington, "A Reliability Test System for Educational Purposes-Basic Distribution System Data and Results", IEEE Trans. on Power Syst., Vol. 6, No. 2, May 1991, pp. 813-820.
    • (1991) IEEE Trans. on Power Syst. , vol.6 , Issue.2 , pp. 813-820
    • Allan, R.N.1    Billington, R.2
  • 4
    • 0030289683 scopus 로고    scopus 로고
    • Transmission equipment reliability data from Canadian electric association
    • Nov/Dec
    • Koval, D.O., "Transmission Equipment Reliability Data from Canadian Electric Association", IEEE Trans. on Industry Applications, Vol 32, No. 6, Nov/Dec 1996, pp. 1439-1449.
    • (1996) IEEE Trans. on Industry Applications , vol.32 , Issue.6 , pp. 1439-1449
    • Koval, D.O.1
  • 6
    • 0011876368 scopus 로고
    • The short-term cost of electricity supply interruptions
    • United States Dept. of Energy, April
    • Yabroff, Irvin, "The Short-Term Cost of Electricity Supply Interruptions", Report DOE/EP-005 from The National Electric Reliability Study, United States Dept. of Energy, April 1981, p. 337.
    • (1981) Report DOE/EP-005 from The National Electric Reliability Study , pp. 337
    • Yabroff, I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.