메뉴 건너뛰기




Volumn 14, Issue 5, 2002, Pages 293-296

Achieving breakthrough performance improvement: Results of implementing a fit-for-purpose total management system

Author keywords

Balanced scorecard; Performance improvement; Total quality management

Indexed keywords

EFFICIENCY; PERFORMANCE; QUALITY ASSURANCE; STANDARDS; STRATEGIC PLANNING;

EID: 0036393578     PISSN: 0954478X     EISSN: None     Source Type: Journal    
DOI: 10.1108/09544780210439725     Document Type: Article
Times cited : (5)

References (12)
  • 2
    • 0010670992 scopus 로고    scopus 로고
    • Balanced performance scorecard - A vision-based performance measurement tool
    • March
    • Chan, Y.K. (1999), "Balanced performance scorecard - a vision-based performance measurement tool", The Eighth Hong Kong Quality Management Convention, March, pp. 85-93.
    • (1999) The Eighth Hong Kong Quality Management Convention , pp. 85-93
    • Chan, Y.K.1
  • 3
    • 0010710981 scopus 로고    scopus 로고
    • System integration - A quality direction for the new millennium
    • Sydney, February
    • Chan, Y.K. (2000), "System integration - a quality direction for the new millennium", ADQ, QUALCON 2000, Sydney, February.
    • (2000) ADQ, QUALCON 2000
    • Chan, Y.K.1
  • 4
    • 0010718033 scopus 로고    scopus 로고
    • Statistical verification of performance difference based on balanced scorecard performance indicators
    • Chan, Y.K. (2001), "Statistical verification of performance difference based on balanced scorecard performance indicators", paper presented at accepted by the 6th International Conference on ISO9000 and TQM, April.
    • (2001) 6th International Conference on ISO9000 and TQM, April
    • Chan, Y.K.1
  • 5
    • 84975861280 scopus 로고    scopus 로고
    • Putting divisional IMS into perspective - Interview with the operations director, Mr Phil Gaffney
    • March
    • Chan, Y.K. and Sing, C. (1999), "Putting divisional IMS into perspective - interview with the operations director, Mr Phil Gaffney", Engineering Insight (MTR Technical Journal), March, pp. 2-6.
    • (1999) Engineering Insight (MTR Technical Journal) , pp. 2-6
    • Chan, Y.K.1    Sing, C.2
  • 8
    • 0032301665 scopus 로고    scopus 로고
    • The establishment of an integrated management system - A paradigm for railway engineering management
    • Chan, Y.K., Gaffney, P., Nealey, K. and Ip, W.H. (1998), "The establishment of an integrated management system - a paradigm for railway engineering management", The TQM Magazine, Vol. 10 No. 6, pp. 420-4.
    • (1998) The TQM Magazine , vol.10 , Issue.6 , pp. 420-424
    • Chan, Y.K.1    Gaffney, P.2    Nealey, K.3    Ip, W.H.4
  • 10
    • 84986120824 scopus 로고    scopus 로고
    • A model for business excellence
    • January
    • Godfrey, A.B. (1997), "A model for business excellence", Quality Digest, January, p. 17.
    • (1997) Quality Digest , pp. 17
    • Godfrey, A.B.1
  • 11


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.