메뉴 건너뛰기




Volumn 2, Issue , 2002, Pages 517-523

Preliminary probabilistic safety assessment of the IRIS plant

Author keywords

[No Author keywords available]

Indexed keywords

AIR-OPERATED VALVE; AUTOMATIC DEPRESSURIZATION SYSTEM; CORE DAMAGE FREQUENCY; DIESEL GENERATOR; LONG-TERM CORE MAKEUP SYSTEM; LOSS OF OFFSITE POWER; MAIN FEEDWATER ISOLATION VALVE; MAIN STEAM ISOLATION VALVE; PASSIVE CONTAINMENT COOLING SYSTEM; PROBABILISTIC SAFETY ASSESSMENT;

EID: 0036390397     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/ICONE10-22095     Document Type: Conference Paper
Times cited : (4)

References (6)
  • 4
    • 0026768547 scopus 로고
    • Westinghouse advanced passive 600 plant
    • "Westinghouse Advanced Passive 600 Plant," Nucl. Safety, Vol. 33, No. 1 (1992).
    • (1992) Nucl. Safety , vol.33 , Issue.1
  • 5
    • 0010746573 scopus 로고    scopus 로고
    • AP600 probabilistic risk assessment rev. 11
    • Westinghouse Electric Corporation
    • "AP600 Probabilistic Risk Assessment Rev. 11," Westinghouse Electric Corporation (1998).
    • (1998)
  • 6
    • 0003539707 scopus 로고
    • Severe accident risks: An assessment for five U.S. nuclear power plants final summary report
    • U.S. Nuclear Regulatory Commission
    • "Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants Final Summary Report," NUREG-1150, Vol. 1, U.S. Nuclear Regulatory Commission (1990).
    • (1990) NUREG-1150 , vol.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.