|
Volumn 2, Issue , 2002, Pages 1254-1259
|
Feedback control for real-time scheduling
a a a a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
ALGORITHMS;
CLOSED LOOP CONTROL SYSTEMS;
COMPUTER SIMULATION;
CONTROL SYSTEM SYNTHESIS;
MULTIPROCESSING SYSTEMS;
OPTIMAL CONTROL SYSTEMS;
PARAMETER ESTIMATION;
REAL TIME SYSTEMS;
SCHEDULING;
THREE TERM CONTROL SYSTEMS;
DEADLINE MISS RATIO;
OPEN LOOP DYNAMICS;
REAL TIME SCHEDULING;
TASK REJECTION RATIO;
WORST CASE EXECUTION TIME;
FEEDBACK CONTROL;
|
EID: 0036059989
PISSN: 07431619
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/acc.2002.1023192 Document Type: Conference Paper |
Times cited : (17)
|
References (14)
|