-
1
-
-
0030170675
-
Single machine scheduling using dominance relation to minimize earliness to ready and due times
-
Asano, K. and Ohta, H., 1996, Single machine scheduling using dominance relation to minimize earliness to ready and due times. International Journal of Production Economics, 44, 35-43.
-
(1996)
International Journal of Production Economics
, vol.44
, pp. 35-43
-
-
Asano, K.1
Ohta, H.2
-
2
-
-
0028369288
-
Supervisory control of timed discrete-event systems
-
Brandin, B. A. and Wonham, W. M., 1994, Supervisory control of timed discrete-event systems. IEEE Transactions on Automatic Control, 39, 329-342.
-
(1994)
IEEE Transactions on Automatic Control
, vol.39
, pp. 329-342
-
-
Brandin, B.A.1
Wonham, W.M.2
-
3
-
-
0028449763
-
Resource optimal control in some single-machine scheduling problems
-
Cheng, T. C. E. and Janiak, A., 1994, Resource optimal control in some single-machine scheduling problems. IEEE Transactions on Automatic Control, 39, 1243-1246.
-
(1994)
IEEE Transactions on Automatic Control
, vol.39
, pp. 1243-1246
-
-
Cheng, T.C.E.1
Janiak, A.2
-
4
-
-
0028255406
-
A method of flexible scheduling for flexible manufacturing systems
-
Choi, J. and Hitomi, K., 1994, A method of flexible scheduling for flexible manufacturing systems. International Journal of Production Economics, 33, 247-255.
-
(1994)
International Journal of Production Economics
, vol.33
, pp. 247-255
-
-
Choi, J.1
Hitomi, K.2
-
5
-
-
0022026963
-
A linear-system-theoretical view of discrete-event processes and its use for performance evaluation in manufacturing
-
Cohen, G., Dubois, D., Quadrat, J. P. and Viot, M., 1985, A linear-system-theoretical view of discrete-event processes and its use for performance evaluation in manufacturing. IEEE Transactions on Automatic Control, AC-30, 210-220.
-
(1985)
IEEE Transactions on Automatic Control
, vol.AC-30
, pp. 210-220
-
-
Cohen, G.1
Dubois, D.2
Quadrat, J.P.3
Viot, M.4
-
7
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extensions
-
Elmaghraby, S., 1978, The economic lot scheduling problem (ELSP): Review and extensions. Management Science, 24, 587-598.
-
(1978)
Management Science
, vol.24
, pp. 587-598
-
-
Elmaghraby, S.1
-
8
-
-
0003666178
-
Scheduling a production line to minimize maximum tardiness
-
Research Report 43, Management Science Research Project, University of California, Los Angeles
-
Jackson, J. R., 1955, Scheduling a production line to minimize maximum tardiness. Research Report 43, Management Science Research Project, University of California, Los Angeles.
-
-
-
Jackson, J.R.1
-
9
-
-
0027575418
-
Optimal due date determination and sequencing of n jobs on a single machine using the SLK method
-
Karacapilidis, N. I. and Pappis, C. P., 1993, Optimal due date determination and sequencing of n jobs on a single machine using the SLK method. Computers in Industry, 21, p. 335-339.
-
(1993)
Computers in Industry
, vol.21
, pp. 335-339
-
-
Karacapilidis, N.I.1
Pappis, C.P.2
-
10
-
-
0010916439
-
Recent results in the theory of machine scheduling
-
edited by A. Bachem, M. Grotschel and B. Korte (New York: Springer-Verlag)
-
Lawler, E. L., 1983, Recent results in the theory of machine scheduling. In Mathematical Programming: The State of the Art, edited by A. Bachem, M. Grotschel and B. Korte (New York: Springer-Verlag), pp. 202-233.
-
Mathematical Programming: The State of the Art
, pp. 202-233
-
-
Lawler, E.L.1
-
11
-
-
0030110425
-
A greedy-based decision support system for scheduling a manufacturing operation
-
Lipskie, K. R., 1996, A greedy-based decision support system for scheduling a manufacturing operation. Production and Inventory Management Journal, 37, 36-39.
-
(1996)
Production and Inventory Management Journal
, vol.37
, pp. 36-39
-
-
Lipskie, K.R.1
-
12
-
-
84974687699
-
Scheduling algorithms for multiprogramming in a hard-real-time environment
-
Liu, C. L. and Layland, J. W., 1973, Scheduling algorithms for multiprogramming in a hard-real-time environment. Journal of the ACM, 20, 46-66.
-
(1973)
Journal of the ACM
, vol.20
, pp. 46-66
-
-
Liu, C.L.1
Layland, J.W.2
-
13
-
-
0026243201
-
The economic lot scheduling problem: Theory and practice
-
Lopez, M. A. N. and Kingsman, B. G., 1991, The economic lot scheduling problem: theory and practice. International Journal of Production Economics, 23, 147-164.
-
(1991)
International Journal of Production Economics
, vol.23
, pp. 147-164
-
-
Lopez, M.A.N.1
Kingsman, B.G.2
-
14
-
-
0027625736
-
Scheduling of manufacturing systems using the Lagrangian relaxation technique
-
Luh, P. B. and Hoitomt, D. J., 1993, Scheduling of manufacturing systems using the Lagrangian relaxation technique. IEEE Transactions on Automatic Control, 38, 1066-1079.
-
(1993)
IEEE Transactions on Automatic Control
, vol.38
, pp. 1066-1079
-
-
Luh, P.B.1
Hoitomt, D.J.2
-
15
-
-
0024611210
-
Stable, distributed, real-time scheduling of flexible manufacturing/assembly/disassembly systems
-
Perkins, J. R. and Kumar, P. R., 1989, Stable, distributed, real-time scheduling of flexible manufacturing/assembly/disassembly systems. IEEE Transactions on Automatic Control, 34, 139-148.
-
(1989)
IEEE Transactions on Automatic Control
, vol.34
, pp. 139-148
-
-
Perkins, J.R.1
Kumar, P.R.2
-
16
-
-
0024479313
-
The control of discrete event systems
-
Ramadge, P. J. and Wonham, W. M., 1989, The control of discrete event systems. Proceedings of the IEEE, 77, 81-98.
-
(1989)
Proceedings of the IEEE
, vol.77
, pp. 81-98
-
-
Ramadge, P.J.1
Wonham, W.M.2
-
17
-
-
0030124979
-
Single-machine earliness-tardiness scheduling about a common due date with tolerances
-
Weng, M. X. and Ventura, J. A., 1996, Single-machine earliness-tardiness scheduling about a common due date with tolerances. International Journal of Production Economics, 42, 217-227.
-
(1996)
International Journal of Production Economics
, vol.42
, pp. 217-227
-
-
Weng, M.X.1
Ventura, J.A.2
-
18
-
-
0003506104
-
-
Department of Electrical and Computer Engineering, University of Toronto, 1999
-
Wonham, W. M., 1999, Notes on Control of Discrete-Event Systems. Version 99.12.01, Department of Electrical and Computer Engineering, University of Toronto, 1999. Available on-line at: http://www.control.utoronto.ca/people/profs/wonham.
-
(1999)
Notes on Control of Discrete-Event Systems. Version 99.12.01
-
-
Wonham, W.M.1
-
19
-
-
0023347999
-
On the supremal controllable sublanguage of a given language
-
Wonham, W. M. and Ramadge, P. J., 1987, On the supremal controllable sublanguage of a given language. SIAM Journal of Control and Optimization, 25, 637-659.
-
(1987)
SIAM Journal of Control and Optimization
, vol.25
, pp. 637-659
-
-
Wonham, W.M.1
Ramadge, P.J.2
-
20
-
-
0023827662
-
Modular supervisory control of discrete event systems
-
Wonham, W. M. and Ramadge, P. J., 1988, Modular supervisory control of discrete event systems. Mathematics of Control, Signal and Systems, 1, 13-30.
-
(1988)
Mathematics of Control, Signal and Systems
, vol.1
, pp. 13-30
-
-
Wonham, W.M.1
Ramadge, P.J.2
|