|
Volumn 25, Issue 7-8, 2001, Pages 1031-1043
|
Planning production on a single processor with sequence-dependent setups. Part 2: Campaign sequencing and scheduling
|
Author keywords
Production planning; Scheduling; Sequencing; Tabu search
|
Indexed keywords
ALGORITHMS;
APPROXIMATION THEORY;
COMBINATORIAL MATHEMATICS;
HEURISTIC METHODS;
LINEAR PROGRAMMING;
PLANNING;
PROCESS CONTROL;
SCHEDULING;
SEQUENCE-DEPENDENT SETUPS;
PRODUCTION ENGINEERING;
COMPUTER AIDED PROCESS PLANNING;
ALGORITHM;
ARTICLE;
CALCULATION;
CHEMICAL ENGINEERING;
MATHEMATICAL ANALYSIS;
METHODOLOGY;
PLANNING;
|
EID: 0035882048
PISSN: 00981354
EISSN: None
Source Type: Journal
DOI: 10.1016/S0098-1354(01)00677-9 Document Type: Article |
Times cited : (7)
|
References (14)
|