메뉴 건너뛰기




Volumn 25, Issue 7-8, 2001, Pages 1031-1043

Planning production on a single processor with sequence-dependent setups. Part 2: Campaign sequencing and scheduling

Author keywords

Production planning; Scheduling; Sequencing; Tabu search

Indexed keywords

ALGORITHMS; APPROXIMATION THEORY; COMBINATORIAL MATHEMATICS; HEURISTIC METHODS; LINEAR PROGRAMMING; PLANNING; PROCESS CONTROL; SCHEDULING;

EID: 0035882048     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0098-1354(01)00677-9     Document Type: Article
Times cited : (7)

References (14)
  • 6
    • 0018058202 scopus 로고
    • The application of marginal analysis to the economic lot scheduling problem
    • (1978) AIIE Transactions , vol.10 , Issue.4 , pp. 354-361
    • Fujita, S.1
  • 8
    • 0018724120 scopus 로고
    • An improved extended basic period procedure for solving the economic lot scheduling problem
    • (1979) AIIE Transactions , vol.11 , Issue.4 , pp. 336-340
    • Haessler, R.1
  • 13
    • 0001343645 scopus 로고
    • Rounding off to powers of two in continuous relaxations of capacitated lot scheduling problems
    • (1989) Management Science , vol.35 , pp. 1433-1442
    • Roundy, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.