메뉴 건너뛰기




Volumn 473, Issue 3, 2001, Pages 243-259

Implementation and synchronisation of the First Level Global Trigger for the CMS experiment at LHC

Author keywords

Compact Muon Solenoid; Field Programmable Gate Arrays; Global; Topology; Trigger

Indexed keywords

ALGORITHMS; COLLIDING BEAM ACCELERATORS; FIELD PROGRAMMABLE GATE ARRAYS; PROTONS; SOLENOIDS; SYNCHRONIZATION; TABLE LOOKUP; TOPOLOGY; TRIGGER CIRCUITS;

EID: 0035846443     PISSN: 01689002     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0168-9002(01)00930-5     Document Type: Article
Times cited : (13)

References (12)
  • 12
    • 0006420301 scopus 로고    scopus 로고
    • DS90CR218A/217 LVDS 21-Bit Channel Link, November
    • (1999) Data Sheet


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.