-
1
-
-
0025458420
-
Stochastic effectiveness models for human-machine systems
-
Abbas, B. S. and Kuo, W., 1990, Stochastic effectiveness models for human-machine systems. IEEE Transactions on Systems, Man, and Cybernetics, 20, 826-834.
-
(1990)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.20
, pp. 826-834
-
-
Abbas, B.S.1
Kuo, W.2
-
2
-
-
0010839819
-
Performance modeling and evaluation of flexible manufacturing systems using semi-Markov approach
-
(Amsterdam: Elsevier)
-
Alam, M., Gupta, D., Ahmad, S. I. and Raouf, A., 1985, Performance modeling and evaluation of flexible manufacturing systems using semi-Markov approach. Flexible Manufacturing: Recent Developments in FMS, Robotics, CAD/CAM, CIM (Amsterdam: Elsevier), pp. 87-118.
-
(1985)
Flexible Manufacturing: Recent Developments in FMS, Robotics, CAD/CAM, CIM
, pp. 87-118
-
-
Alam, M.1
Gupta, D.2
Ahmad, S.I.3
Raouf, A.4
-
4
-
-
0002437073
-
Automated tooling in a flexible manufacturing system
-
April
-
Kiran, A. S. and Krason, R. J., 1988, Automated tooling in a flexible manufacturing system. Industrial Engineering, April, 52-57.
-
(1988)
Industrial Engineering
, pp. 52-57
-
-
Kiran, A.S.1
Krason, R.J.2
-
5
-
-
0010771174
-
Performance modeling for multiple human/machine systems
-
Kuo, W. and Abbas, B. S., 1993, Performance modeling for multiple human/machine systems. Journal of Analytical Modeling and Simulation, 11, 57-71.
-
(1993)
Journal of Analytical Modeling and Simulation
, vol.11
, pp. 57-71
-
-
Kuo, W.1
Abbas, B.S.2
-
6
-
-
0010774040
-
Nonintuitive availability design and evaluation for a generic flexible manufacturing system
-
(Amsterdam: Elsevier)
-
Kuo, W. and Rahman, M., 1993, Nonintuitive availability design and evaluation for a generic flexible manufacturing system. Quality Through Engineering Design (Amsterdam: Elsevier), pp. 267-283
-
(1993)
Quality Through Engineering Design
, pp. 267-283
-
-
Kuo, W.1
Rahman, M.2
-
7
-
-
0010839595
-
Optimizing spare parts storage policy based on availability design
-
Kuo, W. and Rahman, M., 1994, Optimizing spare parts storage policy based on availability design. International Journal of Reliability, Quality and Safety Engineering, 1, 27-40.
-
(1994)
International Journal of Reliability, Quality and Safety Engineering
, vol.1
, pp. 27-40
-
-
Kuo, W.1
Rahman, M.2
-
8
-
-
0025469368
-
Stochastic models for mission effectiveness
-
Lee, K. W., Higgins, J. J. and Tillman, F. A., 1990, Stochastic models for mission effectiveness. IEEE Transactions on Reliability, 39, 321-324.
-
(1990)
IEEE Transactions on Reliability
, vol.39
, pp. 321-324
-
-
Lee, K.W.1
Higgins, J.J.2
Tillman, F.A.3
-
10
-
-
0019047765
-
On evaluating the performability of degradable computer systems
-
Meyer, J., 1980, On evaluating the performability of degradable computer systems. IEEE Transactions on Computers, C-29, 720-731
-
(1980)
IEEE Transactions on Computers
, vol.C-29
, pp. 720-731
-
-
Meyer, J.1
-
11
-
-
0020151729
-
Closed-form solutions of performability
-
Meyer, J., 1982, Closed-form solutions of performability. IEEE Transactions on Computers, C-31, 648-657.
-
(1982)
IEEE Transactions on Computers
, vol.C-31
, pp. 648-657
-
-
Meyer, J.1
-
12
-
-
0022940712
-
Simulation studies of flexible manufacturing systems
-
(UK: IFS Publications)
-
Mishra, P. K., Pandey, P. C. and Singh, C. K., 1986, Simulation studies of flexible manufacturing systems. Proceedings of the 2nd International Conference on Simulation in Manufacturing (UK: IFS Publications) pp. 119-128.
-
(1986)
Proceedings of the 2nd International Conference on Simulation in Manufacturing
, pp. 119-128
-
-
Mishra, P.K.1
Pandey, P.C.2
Singh, C.K.3
-
13
-
-
0025468368
-
Modeling the effect of reliability on performance
-
Reibman, A. L., 1990, Modeling the effect of reliability on performance. IEEE Transactions on Reliability, 39, 314-320.
-
(1990)
IEEE Transactions on Reliability
, vol.39
, pp. 314-320
-
-
Reibman, A.L.1
-
14
-
-
0032167135
-
Performability of systems based on renewal process models
-
Rupe, J. and Kuo, W., 1998, Performability of systems based on renewal process models. IEEE Transactions on System, Man and Cybernetics, 28, 691-698.
-
(1998)
IEEE Transactions on System, Man and Cybernetics
, vol.28
, pp. 691-698
-
-
Rupe, J.1
Kuo, W.2
-
15
-
-
0022949590
-
Decision support for planning flexible manufacturing systems
-
(UK: IFS Publications)
-
Seliger, G., Viehweger, B. and Wieneke, B., 1986, Decision support for planning flexible manufacturing systems. Proceedings of the 2nd International Conference on Simulation in Manufacturing (UK: IFS Publications), pp. 193-206.
-
(1986)
Proceedings of the 2nd International Conference on Simulation in Manufacturing
, pp. 193-206
-
-
Seliger, G.1
Viehweger, B.2
Wieneke, B.3
-
16
-
-
0027146759
-
Output maximization of a CIM system: Simulation and statistical approach
-
Shang, J. S. and Tadikamalla, P. R., 1993, Output maximization of a CIM system: simulation and statistical approach. International Journal of Production Research, 31, 19-41.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 19-41
-
-
Shang, J.S.1
Tadikamalla, P.R.2
-
17
-
-
0010842093
-
On optimal capacities for repair facilities in flexible manufacturing systems
-
(Elsevier Science)
-
Vinod, B. and John, T. C., 1986, On optimal capacities for repair facilities in flexible manufacturing systems. Flexible Manufacturing Systems: Methods and Studies (Elsevier Science), pp. 341-351.
-
(1986)
Flexible Manufacturing Systems: Methods and Studies
, pp. 341-351
-
-
Vinod, B.1
John, T.C.2
-
18
-
-
0004652931
-
Performance models for unreliable flexible manufacturing systems
-
Vinod, B. and Solberg, S. S., 1994, Performance models for unreliable flexible manufacturing systems. Omega, The International Journal of Management Science, 12, 299-308.
-
(1994)
Omega, the International Journal of Management Science
, vol.12
, pp. 299-308
-
-
Vinod, B.1
Solberg, S.S.2
-
19
-
-
84946304952
-
Closed queueing network models of flexible manufacturing systems
-
Yao, D. D. W. and Buzacott, J. A., 1983, Closed queueing network models of flexible manufacturing systems. Proceedings of ICPR 83, VIIth International Conference on Production Research, Windsor, Ontario, vol. 1, pp. 648-654.
-
(1983)
Proceedings of ICPR 83, VIIth International Conference on Production Research, Windsor, Ontario
, vol.1
, pp. 648-654
-
-
Yao, D.D.W.1
Buzacott, J.A.2
|