메뉴 건너뛰기




Volumn 2, Issue SUMMER, 2001, Pages 1122-1126

Available transfer capability evaluation by decomposition

Author keywords

Available transfer capability; Benders decomposition; Deregulation; Optimal power flow; Power systems

Indexed keywords

CONSTRAINT THEORY; ELECTRIC LOAD FLOW; ELECTRIC NETWORK ANALYSIS; LAGRANGE MULTIPLIERS; OPTIMIZATION; TRANSFER FUNCTIONS;

EID: 0035791850     PISSN: 21608555     EISSN: 21608563     Source Type: Conference Proceeding    
DOI: 10.1109/pess.2001.970222     Document Type: Conference Paper
Times cited : (17)

References (9)
  • 1
    • 0003803257 scopus 로고    scopus 로고
    • Available transfer capability definitions and determination
    • Transmission Transfer Capability Task Force; Princeton, NJ, June
    • Transmission Transfer Capability Task Force, "Available Transfer Capability Definitions and Determination", North American Electric Reliability Council, Princeton, NJ, June 1996.
    • (1996) North American Electric Reliability Council
  • 3
    • 0033892010 scopus 로고    scopus 로고
    • Transmission management in the deregulated environment
    • February
    • R.D. Christie, B.F. Wollenberg, and I. Wangensteen, Transmission management in the deregulated environment, IEEE Proceedings, vol. 88, no. 2, February 2000, pp. 170-195.
    • (2000) IEEE Proceedings , vol.88 , Issue.2 , pp. 170-195
    • Christie, R.D.1    Wollenberg, B.F.2    Wangensteen, I.3
  • 6
    • 0013331529 scopus 로고    scopus 로고
    • TTC calculation using SQP method considering reactive power and voltage impacts
    • M. Shaaban, Y.X. Ni, and F.F. Wu, "TTC calculation using SQP method considering reactive power and voltage impacts", submitted to IEEE Trans. Power Systems.
    • IEEE Trans. Power Systems
    • Shaaban, M.1    Ni, Y.X.2    Wu, F.F.3
  • 8
    • 0023292179 scopus 로고
    • Security-constrained optimal power flow with post-contingency corrective rescheduling
    • February
    • A. Monticelli, M.V.F. Pereira, and S. Granville, "Security-constrained optimal power flow with post-contingency corrective rescheduling", IEEE Trans. Power Systems, Vol. PWRS-2, no. 1, February 1987, pp. 175-182.
    • (1987) IEEE Trans. Power Systems , vol.PWRS-2 , Issue.1 , pp. 175-182
    • Monticelli, A.1    Pereira, M.V.F.2    Granville, S.3
  • 9
    • 0033733057 scopus 로고    scopus 로고
    • Optimal short-term real power scheduling in a deregulated competitive market
    • Y.Y. Hong, and M.T. Weng, "Optimal short-term real power scheduling in a deregulated competitive market", Electric Power Systems Research, Vol. 54, 2000, pp. 181-188.
    • (2000) Electric Power Systems Research , vol.54 , pp. 181-188
    • Hong, Y.Y.1    Weng, M.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.