메뉴 건너뛰기




Volumn , Issue , 2001, Pages 819-828

Are long TBM tunnels faster by TBM?

(1)  Barton, Nick a  

a NONE

Author keywords

[No Author keywords available]

Indexed keywords

CORRELATION METHODS; MATHEMATICAL MODELS; NUMERICAL ANALYSIS; TUNNELING (EXCAVATION);

EID: 0035791185     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (8)

References (9)
  • 1
    • 0016313398 scopus 로고
    • Engineering classification of rock masses for the design of tunnel support
    • Springer-Verlag
    • Barton, N.; R. Lien and J. Lunde, 1974. Engineering classification of rock masses for the design of tunnel support. Rock Mechanics, 6 (4): 189-236, Springer-Verlag.
    • (1974) Rock Mechanics , vol.6 , Issue.4 , pp. 189-236
    • Barton, N.1    Lien, R.2    Lunde, J.3
  • 4
    • 0003807625 scopus 로고    scopus 로고
    • TBM tunneling in jointed and faulted rock
    • Balkema, Rotterdam
    • Barton, N., 2000a. "TBM Tunneling in Jointed and Faulted Rock", 173 p., Balkema, Rotterdam.
    • (2000) , pp. 173
    • Barton, N.1
  • 6
    • 2142669859 scopus 로고    scopus 로고
    • Seismic velocity and rock quality
    • (book in preparation)
    • Barton, N., 2001. Seismic velocity and rock quality (book in preparation).
    • (2001)
    • Barton, N.1
  • 9
    • 4244177804 scopus 로고
    • Full face tunnel boring
    • NTH; Project Report 1-94, NTH/NTNU, Trondheim, Norway
    • NTH, 1994. Full face tunnel boring. Project Report 1-94, NTH/NTNU, Trondheim, Norway.
    • (1994)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.