메뉴 건너뛰기




Volumn 2, Issue , 2001, Pages 1188-1193

Sizing a pilot production line using simulation

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; INDUSTRIAL MANAGEMENT; OPERATIONS RESEARCH; PRODUCTION ENGINEERING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0035705626     PISSN: 02750708     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (7)

References (8)
  • 3
    • 0008269513 scopus 로고    scopus 로고
    • A modified shifting bottleneck heuristic for minimizing the total weighted tardiness in a semiconductor wafer fab
    • In revision for the Journal of Scheduling
    • Mason, S.J.1    Fowler, J.W.2    Carlyle, W.M.3
  • 6
    • 0008224412 scopus 로고    scopus 로고
    • Semiconductor industry association reports global semiconductor market tops $200 billion mark for first time
    • February 5 accessed July 2, 2001
    • (2001) Semiseek News


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.