메뉴 건너뛰기




Volumn 1, Issue , 2001, Pages 16-20

Status and challenges of the LHC construction

(1)  Ostojic, R a  


Author keywords

[No Author keywords available]

Indexed keywords

CRYOGENICS; MAGNETIC MOMENTS; OPTIMIZATION; PARTICLE BEAM INJECTION; PROTON BEAMS; QUALITY CONTROL; SUPERCONDUCTING MAGNETS; TUNING;

EID: 0035569304     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (4)

References (18)
  • 2
  • 3
    • 0006338370 scopus 로고    scopus 로고
    • The LHC magnet programme: From accelerator physics requirements to production in industry
    • Vienna, Austria, June
    • (2000) Proc. EPAC'2000 , pp. 207-211
    • Wyss, C.1
  • 6
  • 14
    • 0006285143 scopus 로고    scopus 로고
    • Superconducting dipole magnets for the LHC insertion regions
    • Vienna, Austria, June
    • (2000) Proc. EPAC'2000 , pp. 2187-2189
    • Willen, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.