메뉴 건너뛰기




Volumn 12, Issue 7, 2001, Pages 717-726

Engineering change: A theoretical assessment and a case study

Author keywords

Change management; Engineering change; Production planning

Indexed keywords

PRODUCTION PLANNING;

EID: 0035497219     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/09537280010024054     Document Type: Article
Times cited : (29)

References (24)
  • 1
    • 0002598187 scopus 로고    scopus 로고
    • Managing engineering change: Market opportunities and manufacturing costs
    • BALAKRISHNAN, N., and CHAKRAVARTY, K., 1996, Managing engineering change: market opportunities and manufacturing costs. Production and Operations Management, 4, 335-356.
    • (1996) Production and Operations Management , vol.4 , pp. 335-356
    • Balakrishnan, N.1    Chakravarty, K.2
  • 4
    • 0020107702 scopus 로고
    • Engineering change control and implementation considerations
    • DIPRIMA, M., 1982, Engineering change control and implementation considerations. Production and Inventory Management Journal, 23, 81-87.
    • (1982) Production and Inventory Management Journal , vol.23 , pp. 81-87
    • Diprima, M.1
  • 5
    • 33847574861 scopus 로고
    • IBM Microelectronics: The value of technologies
    • Vimercate Plant, Italy
    • EC GROUP, 1994, IBM Microelectronics: the value of technologies. IBM Internal Publication, Vimercate Plant, Italy.
    • (1994) IBM Internal Publication
  • 6
    • 33847601908 scopus 로고
    • Engineering Change Cards
    • Vimercate Plant, Italy
    • EC GROUP, 1995, Engineering Change Cards. IBM Internal Publication, Vimercate Plant, Italy.
    • (1995) IBM Internal Publication
  • 7
    • 27944459876 scopus 로고
    • The Boeing 767: From concept to production
    • Number. 9-680-040
    • GARVIN, D. A., 1991, The Boeing 767: from concept to production. Harvard Business School Case Number. 9-680-040.
    • (1991) Harvard Business School Case
    • Garvin, D.A.1
  • 9
    • 33847590496 scopus 로고    scopus 로고
    • Plant capacity and productivity. Measurement and improvement techniques. Part II: Capacity and utilisation indexes in multiple machine systems
    • GRANDO, A., and TURCO, F., 1998b, Plant capacity and productivity. Measurement and improvement techniques. Part II: Capacity and utilisation indexes in multiple machine systems. Internal Research Report, Dipartimento di Economia e Produzione, Politecnico di Milano, 18.
    • (1998) Internal Research Report, Dipartimento di Economia e Produzione, Politecnico di Milano , vol.18
    • Grando, A.1    Turco, F.2
  • 10
    • 0024702296 scopus 로고
    • Evaluating the impact of operating environments on MRP system nervousness
    • Ho, C., 1989, Evaluating the impact of operating environments on MRP system nervousness. International Journal of Production Research, 27, 1115-1135.
    • (1989) International Journal of Production Research , vol.27 , pp. 1115-1135
    • Ho, C.1
  • 12
    • 0028396781 scopus 로고
    • Evaluating the impact of frequent engineering changes on MRP system performance
    • HO, C., 1994, Evaluating the impact of frequent engineering changes on MRP system performance. International Journal of Production Research, 32, 619-641.
    • (1994) International Journal of Production Research , vol.32 , pp. 619-641
    • Ho, C.1
  • 13
    • 0001641797 scopus 로고
    • Examining the impact of demand lumpiness on the lot-sizing performance in MRP systems
    • HO, C., 1995, Examining the impact of demand lumpiness on the lot-sizing performance in MRP systems. International Journal of Production Research, 33, 2579-2599.
    • (1995) International Journal of Production Research , vol.33 , pp. 2579-2599
    • Ho, C.1
  • 14
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP systems nervousness
    • HO, C., and CARTER, P. L., 1996, An investigation of alternative dampening procedures to cope with MRP systems nervousness. International Journal of Production Research, 34, 137-156.
    • (1996) International Journal of Production Research , vol.34 , pp. 137-156
    • Ho, C.1    Carter, P.L.2
  • 15
    • 0002958558 scopus 로고
    • A diagnostic analysis of the impact of forecast errors on production planning via MRP system nervousness
    • HO, C., and IRELAND, T. C., 1993, A diagnostic analysis of the impact of forecast errors on production planning via MRP system nervousness. Production Planning & Control, 4, 311-322.
    • (1993) Production Planning & Control , vol.4 , pp. 311-322
    • Ho, C.1    Ireland, T.C.2
  • 16
  • 18
    • 0017417271 scopus 로고
    • Reschedule the reschedules you just rescheduled: Way of life for MRP?
    • MATHER, H., 1977, Reschedule the reschedules you just rescheduled: way of life for MRP? Production and Inventory Management Journal, 4, 60-79.
    • (1977) Production and Inventory Management Journal , vol.4 , pp. 60-79
    • Mather, H.1
  • 22
    • 0026414520 scopus 로고
    • Engineering change management for long lead time production environments
    • REIDELBACH, M., 1991, Engineering change management for long lead time production environments. Production and Inventory Management Journal, 2, 84-88.
    • (1991) Production and Inventory Management Journal , vol.2 , pp. 84-88
    • Reidelbach, M.1
  • 23
    • 0002657699 scopus 로고
    • An heuristic for selecting lot-size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
    • SILVER, E. A., and MEAL, H. C., 1973, An heuristic for selecting lot-size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment Production and Inventory Management, 14, 64-74.
    • (1973) Production and Inventory Management , vol.14 , pp. 64-74
    • Silver, E.A.1    Meal, H.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.