메뉴 건너뛰기




Volumn 74, Issue 1, 2001, Pages 63-74

The step complexity measure for emergency operating procedures - Comparing with simulation data

Author keywords

Complexity factors; Emergency operating procedures; Entropy; Measure validations; Nuclear power plants; Step complexity quantification; Step performance time

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; CORRELATION METHODS; ENTROPY; ERROR ANALYSIS; HUMAN ENGINEERING; STATISTICAL METHODS;

EID: 0035479743     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0951-8320(01)00063-1     Document Type: Article
Times cited : (28)

References (21)
  • 8
    • 0003761103 scopus 로고
    • Human factors engineering program review model
    • Washington, DC; July
    • (1994) NUREG/CR-0711
  • 9
    • 0003911432 scopus 로고    scopus 로고
    • Research strategies for human performance
    • March
    • (1998) NEA/CSNI/R , Issue.97 , pp. 24
  • 10
    • 0003771863 scopus 로고
    • Guidelines for the preparation of emergency operating procedures
    • Washington, DC; August
    • (1982) NUREG/CR-0899
  • 11
    • 0003936710 scopus 로고
    • Evaluation of emergency operating procedures for nuclear power plants
    • USNRC. Washington, DC
    • (1981) NUREG/CR-1875
  • 12
    • 0003912261 scopus 로고
    • Checklist for evaluating emergency operating procedure used in nuclear power plants
    • Washington, DC
    • (1983) NUREG/CR-2005
  • 13
    • 0003826571 scopus 로고
    • Development of a checklist for evaluating emergency operating procedures used in nuclear power plants
    • Washington, DC; May
    • (1981) NUREG/CR-1970
  • 20
    • 0026114647 scopus 로고
    • Psychometric properties of subjective workload measurement techniques: Implications for their use in the assessment of perceived mental workload
    • (1991) Hum Factors , vol.33 , Issue.1 , pp. 17-33
    • Nygren Thomas, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.