메뉴 건너뛰기




Volumn 33, Issue 7, 2001, Pages 547-557

Cost minimization and workload balancing in printed circuit board assembly

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; FACTORY AUTOMATION; FLEXIBLE MANUFACTURING SYSTEMS; HEURISTIC METHODS; INTEGER PROGRAMMING; MACHINERY; OPTIMIZATION; SCHEDULING;

EID: 0035400757     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/07408170108936853     Document Type: Article
Times cited : (21)

References (36)
  • 7
    • 0024140442 scopus 로고
    • A heuristic for minimizing the number of tool switches on a flexible machine
    • (1988) IIE Transactions , vol.20 , pp. 382-391
    • Bard, J.F.1
  • 9
    • 70449410166 scopus 로고    scopus 로고
    • Sequencing tasks with exponential service times on two machines
    • Department of Electrical Engineering and Computer Science, University of California at Santa Barbara, Santa Barbara, CA
    • Technical Report
    • Bruno, J.1    Downey, P.2
  • 13
    • 0004982003 scopus 로고
    • An overview of recent research on assigning products to groups for group technology production problems
    • Department of Civil Engineering, Northwestern University, Evanston, IL
    • (1991) Working Paper
    • Daskin, M.S.1
  • 14
    • 0004927938 scopus 로고
    • A branch and bound algorithm for grouping components in printed circuit board production
    • Department of Industrial Engineering, Northwestern University, Evanston, IL
    • (1991) Report 91-05
    • Daskin, M.S.1    Maimon, O.2    Shtub, A.3
  • 33
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • (1983) Management Science , vol.29 , pp. 273-288
    • Stecke, K.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.