-
1
-
-
0342465887
-
Application of operational research in industry and industrialization in developing countries
-
Datta S and Bandyopadhay R (1994). Application of operational research in industry and industrialization in developing countries. Omega 22: 173-184.
-
(1994)
Omega
, vol.22
, pp. 173-184
-
-
Datta, S.1
Bandyopadhay, R.2
-
2
-
-
0020844127
-
An operational research approach to breakdown maintenance: Problem recognition
-
Christer AH and Whitelaw J (1983). An operational research approach to breakdown maintenance: problem recognition. JOplResSoc 34: 1041-1052.
-
(1983)
Joplressoc
, vol.34
, pp. 1041-1052
-
-
Christer, A.H.1
Whitelaw, J.2
-
3
-
-
0033366210
-
Developments in delay-time analysis for modelling plant maintenance
-
Christer AH (1999). Developments in delay-time analysis for modelling plant maintenance. J Opl Res Soc 50: 1120-1137.
-
(1999)
J Opl Res Soc
, vol.50
, pp. 1120-1137
-
-
Christer, A.H.1
-
4
-
-
0021444682
-
Reducing production downtime using delay-time analysis
-
Christer AH and Waller WM (1984). Reducing production downtime using delay-time analysis. J Opl Res Soc 35: 499-512.
-
(1984)
J Opl Res Soc
, vol.35
, pp. 499-512
-
-
Christer, A.H.1
Waller, W.M.2
-
5
-
-
0021522019
-
An operational research approach to planned maintenance: Modelling PM for a vehicle fleet
-
Christer AH and Waller WM (1984). An operational research approach to planned maintenance: modelling PM for a vehicle fleet. J Opl Res Soc 35: 967-984.
-
(1984)
J Opl Res Soc
, vol.35
, pp. 967-984
-
-
Christer, A.H.1
Waller, W.M.2
-
6
-
-
0026219530
-
Modelling of condition based maintenance at the coal face
-
Chilcott J and Christer AH (1991). Modelling of condition based maintenance at the coal face. Int J Prod Econ 22: 1-11.
-
(1991)
Int J Prod Econ
, vol.22
, pp. 1-11
-
-
Chilcott, J.1
Christer, A.H.2
-
7
-
-
0031165116
-
An application of delay time analysis to concrete structures
-
Christer AH and Redmond DF (1997). An application of delay time analysis to concrete structures. Eur J Oper Res 99: 619-631.
-
(1997)
Eur J Oper Res
, vol.99
, pp. 619-631
-
-
Christer, A.H.1
Redmond, D.F.2
-
8
-
-
0000936628
-
Estimating the delay-time distribution of faults in repairable machinery of failure data
-
Baker R and Wang W (1992). Estimating the delay-time distribution of faults in repairable machinery of failure data. IMA J Math Appl Bus Indust 3: 259-282.
-
(1992)
IMA J Math Appl Bus Indust
, vol.3
, pp. 259-282
-
-
Baker, R.1
Wang, W.2
-
9
-
-
0002382158
-
Modelling maintenance practice of production plant using the delay time concept
-
Christer AH, Wang W, Baker RD and Sharp J (1995). Modelling maintenance practice of production plant using the delay time concept. IMA J Math Appl Bus Indust 6: 67-84.
-
(1995)
IMA J Math Appl Bus Indust
, vol.6
, pp. 67-84
-
-
Christer, A.H.1
Wang, W.2
Baker, R.D.3
Sharp, J.4
-
10
-
-
0342880947
-
A stochastic modelling problem of high-tech steel production plant
-
Christer AH, Osak S, Thomas C (eds). Springer: Berlin
-
Christer AH, Wang W, Baker RD and Sharp J (1997). A stochastic modelling problem of high-tech steel production plant. In: Stochastic modelling in Innovative Manufacturing, Lecture Notes in Economics and Mathematical Systems, No. 445, Christer AH, Osak S, Thomas C (eds). Springer: Berlin.
-
(1997)
Stochastic Modelling in Innovative Manufacturing, Lecture Notes in Economics and Mathematical Systems
, vol.445
-
-
Christer, A.H.1
Wang, W.2
Baker, R.D.3
Sharp, J.4
-
13
-
-
33847576123
-
Maintenance and availability modelling of a bus fleet in Malaysia, issues and problems
-
Rosenhead J and Triparthy A, Publishers: New Delhi
-
Christer AH and Desa ME (1996). Maintenance and availability modelling of a bus fleet in Malaysia, issues and problems. In: Rosenhead J and Triparthy A (eds). Proc Int Conf of Operational Research for Development, Ahmedabad, India. New Age Int. Publishers: New Delhi, pp 241-250.
-
(1996)
Proc Int Conf of Operational Research for Development, Ahmedabad, India. New Age Int
, pp. 241-250
-
-
Christer, A.H.1
Desa, M.E.2
-
14
-
-
0034004936
-
A model of multiple nested inspections at different intervals
-
Wang W (2000). A model of multiple nested inspections at different intervals. Comp Oper Res 27: 539-558.
-
(2000)
Comp Oper Res
, vol.27
, pp. 539-558
-
-
Wang, W.1
-
15
-
-
0003469953
-
Repairable Systems Reliability: Modelling Inference
-
Marcel Dekker: New York
-
Ascher HE and Feingold H (1984). Repairable Systems Reliability: Modelling Inference, Misconceptions and Their Causes. Marcel Dekker: New York.
-
(1984)
Misconceptions and Their Causes
-
-
Ascher, H.E.1
Feingold, H.2
-
16
-
-
0026835697
-
Revising models of maintenance and inspection
-
Christer AH and Redmond DF (1992). Revising models of maintenance and inspection. Int J Prod Econ 24: 227-234.
-
(1992)
Int J Prod Econ
, vol.24
, pp. 227-234
-
-
Christer, A.H.1
Redmond, D.F.2
-
17
-
-
77958405876
-
A recent mathematical development in maintenance theory
-
Christer AH and Redmond DF (1990). A recent mathematical development in maintenance theory. IMA J Math Appl Bus Indust 2: 97-108.
-
(1990)
IMA J Math Appl Bus Indust
, vol.2
, pp. 97-108
-
-
Christer, A.H.1
Redmond, D.F.2
|