메뉴 건너뛰기




Volumn 70, Issue 2, 2001, Pages 145-161

Makespan estimation in batch process industries using aggregate resource and job set characteristics

Author keywords

[No Author keywords available]

Indexed keywords

MATHEMATICAL MODELS; PROCESS ENGINEERING; REGRESSION ANALYSIS; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0035277340     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(00)00052-9     Document Type: Article
Times cited : (9)

References (17)
  • 2
    • 0003074922 scopus 로고
    • Progress and issues in computer-aided batch process design
    • J.J. Siirola, I.E. Grossmann, G. Stephanopoulos (Eds.), Elsevier, Amsterdam
    • G.V. Reklaitis, Progress and issues in computer-aided batch process design, in: J.J. Siirola, I.E. Grossmann, G. Stephanopoulos (Eds.), Foundations of Computer-Aided Process Design, Elsevier, Amsterdam, 1990, pp. 241-275.
    • (1990) Foundations of Computer-Aided Process Design , pp. 241-275
    • Reklaitis, G.V.1
  • 5
    • 0034321178 scopus 로고    scopus 로고
    • Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries
    • W.H.M. Raaymakers, J.C. Fransoo, Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries, International Journal of Production Economics 68 (2000) 137-149.
    • (2000) International Journal of Production Economics , vol.68 , pp. 137-149
    • Raaymakers, W.H.M.1    Fransoo, J.C.2
  • 8
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • T.C.E. Cheng, M.C. Gupta, Survey of scheduling research involving due date determination decisions, European Journal of Operational Research 38 (1989) 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 10
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • J.K. Weeks, A simulation study of predictable due-dates, Management Science 25 (1979) 363-373.
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 13
    • 0027657253 scopus 로고
    • Job shop flowtime prediction and tardiness control using queueing analysis
    • S.T. Enns, Job shop flowtime prediction and tardiness control using queueing analysis, International Journal of Production Research 31 (1993) 2045-2057.
    • (1993) International Journal of Production Research , vol.31 , pp. 2045-2057
    • Enns, S.T.1
  • 14
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness control
    • S.T. Enns, A dynamic forecasting model for job shop flowtime prediction and tardiness control, International Journal of Production Research 33 (1995) 1295-1312.
    • (1995) International Journal of Production Research , vol.33 , pp. 1295-1312
    • Enns, S.T.1
  • 15
    • 0020783525 scopus 로고
    • The effects of workload dependent due-dates on job shop performance
    • J.W.M. Bertrand, The effects of workload dependent due-dates on job shop performance, Management Science 29 (1983) 799-816.
    • (1983) Management Science , vol.29 , pp. 799-816
    • Bertrand, J.W.M.1
  • 16
    • 0029393210 scopus 로고
    • Estimating flowtimes and setting due-dates in complex production systems
    • S.R. Lawrence, Estimating flowtimes and setting due-dates in complex production systems, IIE Transactions 27 (1995) 657-668.
    • (1995) IIE Transactions , vol.27 , pp. 657-668
    • Lawrence, S.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.