|
Volumn 15, Issue 1, 2001, Pages 17-30
|
Design of minimum earthwork cost canal sections
|
Author keywords
Canal design; Earthwork; Minimum earthwork cost; Optimal canal design; Optimal section
|
Indexed keywords
COSTS;
ERROR ANALYSIS;
EXCAVATION;
OPTIMIZATION;
EARTHWORK COSTS;
CANALS;
CANAL;
DESIGN;
EARTHWORKS;
ECONOMIC ANALYSIS;
|
EID: 0035255237
PISSN: 09204741
EISSN: None
Source Type: Journal
DOI: 10.1023/A:1012244603325 Document Type: Article |
Times cited : (21)
|
References (27)
|