메뉴 건너뛰기




Volumn 129, Issue 1, 2001, Pages 87-94

Scheduling with target start times

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; COSTS; PROBLEM SOLVING; PROCESS CONTROL; SCHEDULING;

EID: 0035254704     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(99)00426-9     Document Type: Article
Times cited : (15)

References (12)
  • 1
    • 0025539033 scopus 로고
    • Lower bounds for single-machine scheduling problems
    • Ahmadi R., Bagchi U. Lower bounds for single-machine scheduling problems. Naval Research Logistics Quarterly. 37:1990;967-979.
    • (1990) Naval Research Logistics Quarterly , vol.37 , pp. 967-979
    • Ahmadi, R.1    Bagchi, U.2
  • 3
    • 0002218558 scopus 로고
    • Bicriterion static scheduling research for a single machine
    • Dileepan P., Sen T. Bicriterion static scheduling research for a single machine. Omega. 16:1988;53-59.
    • (1988) Omega , vol.16 , pp. 53-59
    • Dileepan, P.1    Sen, T.2
  • 6
    • 0030087378 scopus 로고    scopus 로고
    • Minimizing maximum promptness and maximum lateness on a single machine
    • Hoogeveen J.A. Minimizing maximum promptness and maximum lateness on a single machine. Mathematics of Operations Research. 21:1996;100-114.
    • (1996) Mathematics of Operations Research , vol.21 , pp. 100-114
    • Hoogeveen, J.A.1
  • 7
    • 0029314136 scopus 로고
    • Minimizing total completion and maximum cost simultaneously is solvable in polynomial time
    • Hoogeveen J.A., van de Velde S.L. Minimizing total completion and maximum cost simultaneously is solvable in polynomial time. Operations Research Letters. 17:1995;205-208.
    • (1995) Operations Research Letters , vol.17 , pp. 205-208
    • Hoogeveen, J.A.1    Van De Velde, S.L.2
  • 8
    • 0001399202 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for single-machine earliness-tardiness scheduling with idle time
    • Hoogeveen J.A., van de Velde S.L. A branch-and-bound algorithm for single-machine earliness-tardiness scheduling with idle time. INFORMS Journal on Computing. 8:1996;402-412.
    • (1996) INFORMS Journal on Computing , vol.8 , pp. 402-412
    • Hoogeveen, J.A.1    Van De Velde, S.L.2
  • 10
    • 0030215229 scopus 로고    scopus 로고
    • Single-machine scheduling with release dates, due date, and family setup times
    • Schutten M., van de Velde S.L., Zijm W.H.M. Single-machine scheduling with release dates, due date, and family setup times. Management Science. 42:1996;1165-1174.
    • (1996) Management Science , vol.42 , pp. 1165-1174
    • Schutten, M.1    Van De Velde, S.L.2    Zijm, W.H.M.3
  • 11
    • 0002066821 scopus 로고
    • Various optimizers for single-stage production
    • Smith W.E. Various optimizers for single-stage production. Naval Research Logistics Quarterly. 1:1956;59-66.
    • (1956) Naval Research Logistics Quarterly , vol.1 , pp. 59-66
    • Smith, W.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.