메뉴 건너뛰기




Volumn 16, Issue 1, 2001, Pages 163-169

Simulation of the start-up of a hydro power plant for the emergency power supply of a nuclear power station

Author keywords

Electromagnetic transient analysis; Hydroelectric generators; Induction motors; Nuclear power generation auxiliary systems; Off nominal frequency and voltage operation

Indexed keywords

EMERGNECY POWER SUPPLY;

EID: 0035248336     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/59.910793     Document Type: Article
Times cited : (17)

References (11)
  • 5
    • 0029355021 scopus 로고
    • Nuclear plant requirements during power system restoration
    • Aug
    • (1995) IEEE Trans. on Power Systems , vol.10 , Issue.3 , pp. 1486-1491
  • 9
    • 0026820057 scopus 로고
    • Working group on prime mover and energy supply models for system dynamic performance studies. Hydraulic turbine and turbine control models for system dynamic studies
    • Feb
    • (1992) IEEE Trans. on Power Systems , vol.7 , Issue.1 , pp. 167-179


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.