![]() |
Volumn 2, Issue , 2001, Pages 461-472
|
Designing underbalanced thru tubing drilling operations
a
a
SPE
(United States)
|
Author keywords
[No Author keywords available]
|
Indexed keywords
COST ACCOUNTING;
DRILLING EQUIPMENT;
FAILURE ANALYSIS;
OIL WELL PRODUCTION;
PETROLEUM RESERVOIRS;
STRATEGIC PLANNING;
THRU TUBING DRILLING (TTD);
WELL DRILLING;
|
EID: 0035058464
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.2118/67829-ms Document Type: Conference Paper |
Times cited : (2)
|
References (8)
|