![]() |
Volumn 2, Issue , 2001, Pages 411-420
|
Through tubing well construction
a
a
SPE
(United States)
|
Author keywords
[No Author keywords available]
|
Indexed keywords
BOREHOLES;
COST EFFECTIVENESS;
PETROLEUM RESERVOIR EVALUATION;
TECHNICAL WRITING;
COILED TUBING DRILLING (CTD);
THROUGH TUBING DRILLING (TBD);
WELL CONSTRUCTION;
WELL DRILLING;
|
EID: 0035057964
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.2118/67823-ms Document Type: Conference Paper |
Times cited : (2)
|
References (2)
|