-
2
-
-
0343993778
-
A precast substructure design for standard bridge systems
-
Center for Transportation Research, Austin, Tex.
-
Billington, S. L., Barnes, R. W., and Breen, J. E. (1999). "A precast substructure design for standard bridge systems." Res. Rep. 1410-2, Center for Transportation Research, Austin, Tex.
-
(1999)
Res. Rep. 1410-2
-
-
Billington, S.L.1
Barnes, R.W.2
Breen, J.E.3
-
3
-
-
0342687304
-
Development process for a new substructure system for standard bridges
-
Rio de Janeiro, IABSE
-
Billington, S. L., and Breen, J. E. (1999). "Development process for a new substructure system for standard bridges." Symp. on Struct. for the Future - The Search for Quality, Rio de Janeiro, IABSE, Vol. 83.
-
(1999)
Symp. on Struct. for the Future - The Search for Quality
, vol.83
-
-
Billington, S.L.1
Breen, J.E.2
-
4
-
-
0034322672
-
Improving standard highway bridges with attention to cast-in-place substructures
-
Billington, S. L., and Breen, J. E. (2000). "Improving standard highway bridges with attention to cast-in-place substructures." J. Bridge Engrg., ASCE, 5(4), 344-351.
-
(2000)
J. Bridge Engrg., ASCE
, vol.5
, Issue.4
, pp. 344-351
-
-
Billington, S.L.1
Breen, J.E.2
-
5
-
-
0011709179
-
Example applications of aesthetics & efficiency guidelines
-
Billington, S. L., Ratcheye, S., Breen, J. E., and Vernooy, D. A. (2000). "Example applications of aesthetics & efficiency guidelines." Concrete Int., 22(2), 66-75.
-
(2000)
Concrete Int.
, vol.22
, Issue.2
, pp. 66-75
-
-
Billington, S.L.1
Ratcheye, S.2
Breen, J.E.3
Vernooy, D.A.4
-
6
-
-
0343121689
-
-
Sect. 7, Sacramento, Calif.
-
California Department of Transportation (CALTRANS). (1990). Bridge design details, Sect. 7, Sacramento, Calif., 7-31-7-31.2.
-
(1990)
Bridge Design Details
, pp. 731-7312
-
-
-
7
-
-
0026884489
-
Building better bridges: Concrete vs. Steel
-
Freyermuth, C. L. (1992). "Building better bridges: Concrete vs. steel." Civ. Engrg., ASCE, 62(7), 66-71.
-
(1992)
Civ. Engrg., ASCE
, vol.62
, Issue.7
, pp. 66-71
-
-
Freyermuth, C.L.1
-
8
-
-
0343557615
-
Placing spans at a dire strait
-
Sept. 16
-
Green, P. (1996). "Placing spans at a dire strait." Engrg. News Rec., Sept. 16, 26-30.
-
(1996)
Engrg. News Rec.
, pp. 26-30
-
-
Green, P.1
-
9
-
-
0343993774
-
Contractor wins race to finish roadway with days to spare
-
July 7
-
Kraker, J. (1997). "Contractor wins race to finish roadway with days to spare." Engrg. News Rec., July 7, 40-41.
-
(1997)
Engrg. News Rec.
, pp. 40-41
-
-
Kraker, J.1
-
10
-
-
0012650613
-
-
Prepared for the Florida Department of Transportation
-
LoBuono, Armstrong & Associates, HDR Engineering, Inc., and Morales & Shumer Engineers, Inc. (1996). "Development of precast bridge substructures." Prepared for the Florida Department of Transportation.
-
(1996)
Development of Precast Bridge Substructures
-
-
LoBuono, A.1
-
12
-
-
0003899633
-
-
10th Ed., Merriam-Webster, Inc., Springfield, Mass.
-
Merriam-Webster's collegiate dictionary. (1997). 10th Ed., Merriam-Webster, Inc., Springfield, Mass.
-
(1997)
Merriam-Webster's Collegiate Dictionary
-
-
-
13
-
-
0022131851
-
Design and construction of Linn Cove Viaduct
-
Muller, J. M., and Barker, J. M. (1985). "Design and construction of Linn Cove Viaduct." PCI J., 30(5), 38-53.
-
(1985)
PCI J.
, vol.30
, Issue.5
, pp. 38-53
-
-
Muller, J.M.1
Barker, J.M.2
-
14
-
-
0023437225
-
Precast cofferdams speed pier construction
-
Munn, W. D. (1987). "Precast cofferdams speed pier construction." Hwy. & Heavy Constr., 130(10), 58-60.
-
(1987)
Hwy. & Heavy Constr.
, vol.130
, Issue.10
, pp. 58-60
-
-
Munn, W.D.1
-
15
-
-
0343557614
-
-
Wiley, New York
-
Podolny, W., Jr., and Muller, J. M. (1982). Construction and design of prestressed concrete segmental bridges, Wiley, New York, 543-545.
-
(1982)
Construction and Design of Prestressed Concrete Segmental Bridges
, pp. 543-545
-
-
Podolny W., Jr.1
Muller, J.M.2
-
16
-
-
0022525262
-
Design trends for concrete bridge piers
-
Poston, R. W., Diaz, M., and Breen, J. E. (1986). "Design trends for concrete bridge piers." J. ACI. 83(1), 14-20.
-
(1986)
J. ACI.
, vol.83
, Issue.1
, pp. 14-20
-
-
Poston, R.W.1
Diaz, M.2
Breen, J.E.3
-
17
-
-
0343121688
-
-
Center of Transportation Research, Austin, Tex.
-
Texas Department of Transportation (TxDOT). (1999). "Research project 0-1748." Center of Transportation Research, Austin, Tex.
-
(1999)
Research Project 0-1748
-
-
-
19
-
-
0024663611
-
Torridge bridge combines aesthetic excellence with construction economy
-
"Torridge bridge combines aesthetic excellence with construction economy." (1989). Concrete Constr., 34(5), 447-452.
-
(1989)
Concrete Constr.
, vol.34
, Issue.5
, pp. 447-452
-
-
-
21
-
-
0012647908
-
Redfish bay and Morris & Cummings cut: Innovations on bridge construction and durability
-
Wolf, L. M., and Friedman, N. K. (1994). "Redfish Bay and Morris & Cummings Cut: Innovations on bridge construction and durability." Tech. Quarterly, 9(2), 1-3.
-
(1994)
Tech. Quarterly
, vol.9
, Issue.2
, pp. 1-3
-
-
Wolf, L.M.1
Friedman, N.K.2
|