메뉴 건너뛰기




Volumn , Issue 481, 2001, Pages 327-334

Systems safety - A real example (European rail traffic management systems, ERTMS)

Author keywords

[No Author keywords available]

Indexed keywords

CAUSE CONSEQUENCE MODEL; EUROPEAN RAIL TRAFFIC MANAGEMENT SYSTEM; EUROPEAN TRAIN CONTROL SYSTEM;

EID: 0034818804     PISSN: 05379989     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (16)
  • 1
    • 84889158062 scopus 로고    scopus 로고
    • ECSAG, Safety Requirement & Objective Group (ESROG), Special Study Proposal, RT_ESROG_SSP_01, Issue 1 June
    • (1999)
  • 2
    • 84889159894 scopus 로고    scopus 로고
    • Risk profiling of railways, current safety performance of railways models (CSPR0 & CSPR1)
    • Master Report, RT_RPR_CSPR_01, Issue 1 Draft 1, Railtrack plc, April
    • (1999)
  • 3
    • 84889111558 scopus 로고    scopus 로고
    • The trans-European high-speed rail system, technical specification for interoperability control-command and signalling subsystem
    • May 8
    • (2000) , vol.2
  • 4
    • 84889166713 scopus 로고    scopus 로고
    • ERTMS scope, boundary and hazards
    • ESROG_SBH_01, Issue 1 Draft 3, January
    • (2000)
  • 6
    • 84889143173 scopus 로고    scopus 로고
    • UNISIG SRS, ERTMS/ETCS-Class 1 Subset 026, Issue 2.0.0, 22 Dec.
    • (1999)
  • 7
    • 84889109659 scopus 로고    scopus 로고
    • Engineering safety management (Yellow book 3)
    • Railtrack PLC, Issue 3 January
    • (2000) , vol.1-2
  • 8
    • 84889124320 scopus 로고    scopus 로고
    • ERTMS Core Hazard Analysis Reports
  • 9
    • 84889128831 scopus 로고    scopus 로고
    • ERTMS hazard analysis report-human factors support
    • Human Engineering Ltd., ISPER_HFS_01, Issue 1 Draft 1 March
    • (2000)
  • 10
    • 84889110025 scopus 로고    scopus 로고
    • ERTMS hazard analysis report-ECH606 errors and failures during coupling, joining, de-coupling and splitting
    • Bellwether Enterprises Ltd., ISPER_ECH606_01, Issue 1 Draft 1 March
    • (2000)
  • 11
    • 84889107531 scopus 로고    scopus 로고
    • ERTMS hazard analysis report-ECH605 errors and failures during rescue
    • Bellwether Enterprises Ltd., ISPER_ECH605_01, Issue 1 Draft 1 March
    • (2000)
  • 12
    • 84889107266 scopus 로고    scopus 로고
    • ERTMS hazard analysis report-ECH604 errors and failures during shunting, 4-sight consulting and aegis engineering systems
    • ISPER_ECH604_01, Issue 1 Draft 1 March
    • (2000)
  • 13
    • 84889129773 scopus 로고    scopus 로고
    • ERTMS hazard rates and safety forecasts
    • ESROG_HRF_01, issue 1, May
    • (2000)
  • 14
    • 84889147879 scopus 로고    scopus 로고
    • Terms of reference for quantitative assessment (HEROE_WPB)
    • ESROG_HQA_01, issue 1, September
    • (2000)
  • 15
    • 84889147193 scopus 로고    scopus 로고
    • Rule assessment framework for HEROE, WPB
    • September
    • (2000)
  • 16
    • 0242486389 scopus 로고    scopus 로고
    • Railway applications - Safety related electronic systems for signalling
    • CENELEC Document prEN 50129:2000; May
    • (2000)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.