메뉴 건너뛰기




Volumn 38, Issue 18, 2000, Pages 4743-4761

Master production scheduling in capacitated sequence-dependent process industries

Author keywords

[No Author keywords available]

Indexed keywords

HEURISTIC METHODS; PROCESS CONTROL; SCHEDULING;

EID: 0034672911     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540050205613     Document Type: Article
Times cited : (10)

References (24)
  • 2
  • 3
    • 0000419596 scopus 로고
    • Scheduling of vehicles from a central depot to a number of delivery points
    • Clarke, G. and Wright, J.W., 1964, Scheduling of vehicles from a central depot to a number of delivery points. Operations Research, 1, 568-581.
    • (1964) Operations Research , vol.1 , pp. 568-581
    • Clarke, G.1    Wright, J.W.2
  • 4
    • 0028766168 scopus 로고
    • Studying the effects of production loss due to setup in dynamic production scheduling
    • De Matta, R. and Guignard, M., 1994, Studying the effects of production loss due to setup in dynamic production scheduling. European Journal of Operational Research, 72, 62-73.
    • (1994) European Journal of Operational Research , vol.72 , pp. 62-73
    • De Matta, R.1    Guignard, M.2
  • 5
    • 0000587970 scopus 로고
    • Three heuristic rules for sequencing jobs to a single production facility
    • Gavett, J.W., 1965, Three heuristic rules for sequencing jobs to a single production facility. Management Science, 8, 166-176.
    • (1965) Management Science , vol.8 , pp. 166-176
    • Gavett, J.W.1
  • 6
    • 0027625565 scopus 로고
    • Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time
    • Guinet, A., 1993, Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time. International Journal of Production Research, 7, 1579-1594.
    • (1993) International Journal of Production Research , vol.7 , pp. 1579-1594
    • Guinet, A.1
  • 8
    • 0001296421 scopus 로고
    • The effectiveness of three heuristic rules for job sequencing in a single production facility
    • Haynes, R.D., Komar, C.A. and Byrd, J., 1973, The effectiveness of three heuristic rules for job sequencing in a single production facility. Management Science, 5, 575-580.
    • (1973) Management Science , vol.5 , pp. 575-580
    • Haynes, R.D.1    Komar, C.A.2    Byrd, J.3
  • 9
    • 0030514060 scopus 로고    scopus 로고
    • Master production rescheduling policy in capacity-constrained just-in-time make-to-stock environments
    • Kern, G.M. and Wei, J.C., 1997, Master production rescheduling policy in capacity-constrained just-in-time make-to-stock environments. Decision Sciences, 2, 365-387.
    • (1997) Decision Sciences , vol.2 , pp. 365-387
    • Kern, G.M.1    Wei, J.C.2
  • 10
    • 0026880159 scopus 로고
    • The vehicle routing problem: An overview of exact and approximate algorithms
    • Laporte, G., 1992, The vehicle routing problem: an overview of exact and approximate algorithms. European Journal of Operational Research, 59, 231-247.
    • (1992) European Journal of Operational Research , vol.59 , pp. 231-247
    • Laporte, G.1
  • 11
    • 0029370459 scopus 로고
    • Plastech, Inc. - The importance of matching production capabilities and market requirements
    • Leschke, J.P., 1995, Plastech, Inc.-the importance of matching production capabilities and market requirements. Production & Inventory Management Journal, 3, 11-15.
    • (1995) Production & Inventory Management Journal , vol.3 , pp. 11-15
    • Leschke, J.P.1
  • 12
    • 0000235161 scopus 로고
    • A scheduling problem involving sequence dependent changeover times
    • Lockett, A.G. and Muhlemann, A.P., 1972, A scheduling problem involving sequence dependent changeover times. Operations Research, 20, 895-902.
    • (1972) Operations Research , vol.20 , pp. 895-902
    • Lockett, A.G.1    Muhlemann, A.P.2
  • 13
    • 0022131981 scopus 로고
    • Multiproduct production scheduling at Owens-Corning Fiberglas
    • Oliff, M.D. and Burch, E.E., 1985, Multiproduct production scheduling at Owens-Corning Fiberglas. Interfaces, 15, 25-34.
    • (1985) Interfaces , vol.15 , pp. 25-34
    • Oliff, M.D.1    Burch, E.E.2
  • 15
    • 0027568692 scopus 로고
    • The relative significance of forecast errors in multistage manufacturing
    • Ritzman, L.P. and King, B.E., 1993, The relative significance of forecast errors in multistage manufacturing. Journal of Operations Management, 1, 51-65.
    • (1993) Journal of Operations Management , vol.1 , pp. 51-65
    • Ritzman, L.P.1    King, B.E.2
  • 17
    • 84990557283 scopus 로고
    • A new framework for manufacturing planning and control systems
    • Sum, C. and Hill, A.V., 1993, A new framework for manufacturing planning and control systems. Decision Sciences, 4, 739-760.
    • (1993) Decision Sciences , vol.4 , pp. 739-760
    • Sum, C.1    Hill, A.V.2
  • 21
    • 0011781409 scopus 로고
    • Using production and transfer batches in flowshops under MRP control
    • Veral, E., 1995, Using production and transfer batches in flowshops under MRP control. Journal of Operations Management, 2, 89-100.
    • (1995) Journal of Operations Management , vol.2 , pp. 89-100
    • Veral, E.1
  • 23
    • 0002112447 scopus 로고
    • The statistical analysis of simulation results
    • edited by S.S. Lavenburg (New York: Academic Press)
    • Welch, P.D., 1983, The statistical analysis of simulation results. The Computer Performance Modeling Handbook, edited by S.S. Lavenburg (New York: Academic Press).
    • (1983) The Computer Performance Modeling Handbook
    • Welch, P.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.