메뉴 건너뛰기




Volumn 24, Issue 2-7, 2000, Pages 345-351

Autonomous decentralized scheduling system for just-in-time production

Author keywords

Decentralized scheduling; Flowshop scheduling; Just in time production; Storage cost

Indexed keywords

ALGORITHMS; CHEMICAL PLANTS; COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; COST EFFECTIVENESS; DECENTRALIZED CONTROL; DISCRETE TIME CONTROL SYSTEMS; INVENTORY CONTROL; JUST IN TIME PRODUCTION; OPTIMIZATION; SCHEDULING; UNCERTAIN SYSTEMS;

EID: 0034661227     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0098-1354(00)00471-3     Document Type: Article
Times cited : (17)

References (4)
  • 2
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties
    • Baker, R., & Scudder, D. (1990). Sequencing with earliness and tardiness penalties. Operations Research, 38, 22-33.
    • (1990) Operations Research , vol.38 , pp. 22-33
    • Baker, R.1    Scudder, D.2
  • 4
    • 33646316340 scopus 로고    scopus 로고
    • Parallel machine scheduling problem with a non-regular objective function (Japanese)
    • Nagoya, Japan
    • Tamaki, H., Sugimoto, T., & Araki, M. (1996). Parallel machine scheduling problem with a non-regular objective function (Japanese). Proceedings of the production scheduling symposium'96 (67-72). Nagoya, Japan.
    • (1996) Proceedings of the Production Scheduling Symposium'96 , pp. 67-72
    • Tamaki, H.1    Sugimoto, T.2    Araki, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.