메뉴 건너뛰기




Volumn 38, Issue 9, 2000, Pages 2099-2123

A model for comparing supply chain schedule integration approaches

Author keywords

[No Author keywords available]

Indexed keywords

ENTERPRISE RESOURCE PLANNING; FORECASTING; SCHEDULING; STOCHASTIC CONTROL SYSTEMS;

EID: 0034659574     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/002075400188528     Document Type: Article
Times cited : (30)

References (29)
  • 1
    • 0001947733 scopus 로고    scopus 로고
    • Supply contracts with quantity commitments and stochastic demand
    • edited by S. Tayur, R. Ganeshan and M. Magazine (Boston: Kluwer Academic), Chapter 7
    • Anupidi, R. and Bassok, Y., 1999, Supply contracts with quantity commitments and stochastic demand. In Quantitative Models for Supply Chain Management, edited by S. Tayur, R. Ganeshan and M. Magazine (Boston: Kluwer Academic), Chapter 7, pp. 197-232.
    • (1999) Quantitative Models for Supply Chain Management , pp. 197-232
    • Anupidi, R.1    Bassok, Y.2
  • 2
    • 0032258584 scopus 로고    scopus 로고
    • Simulation analysis of a manufacturing supply chain
    • Bhaskaran, S., 1998, Simulation analysis of a manufacturing supply chain. Decision Sciences, 29, 633-657.
    • (1998) Decision Sciences , vol.29 , pp. 633-657
    • Bhaskaran, S.1
  • 3
    • 0002355705 scopus 로고
    • Effective supply chain management
    • Davis, T., 1993, Effective supply chain management. Sloan Management Review, Summer, 35-46.
    • (1993) Sloan Management Review , vol.SUMMER , pp. 35-46
    • Davis, T.1
  • 5
    • 0031272776 scopus 로고    scopus 로고
    • Backup agreements in fashion buying the value of upstream flexibility
    • Eppen, G.D. and Iyer, A.V., 1997, Backup agreements in fashion buying the value of upstream flexibility. Management Science, 43, 1469-1484.
    • (1997) Management Science , vol.43 , pp. 1469-1484
    • Eppen, G.D.1    Iyer, A.V.2
  • 8
    • 0011726881 scopus 로고
    • Order-launching and delivery sequencing for an automotive manufacturer
    • Hahn, C., Watts, C. and Kim, K., 1991, Order-launching and delivery sequencing for an automotive manufacturer. Production and Inventory Management, 32, 49-53.
    • (1991) Production and Inventory Management , vol.32 , pp. 49-53
    • Hahn, C.1    Watts, C.2    Kim, K.3
  • 10
    • 0031164721 scopus 로고    scopus 로고
    • The causes of schedule instability in an automotive supply chain
    • Inman, R.R. and Gonsalvez, D.J.A., 1997, The causes of schedule instability in an automotive supply chain. Production and Inventory Management Journal, Second Quarter, 26-31.
    • (1997) Production and Inventory Management Journal , vol.SECOND QUARTER , pp. 26-31
    • Inman, R.R.1    Gonsalvez, D.J.A.2
  • 11
    • 0030514060 scopus 로고    scopus 로고
    • Master production rescheduling policy in capacity-unstrained just-in-time make-to-stock environments
    • Kern, G. and Wei, J., 1996, Master production rescheduling policy in capacity-unstrained just-in-time make-to-stock environments. Decision Sciences, 27, 365-387.
    • (1996) Decision Sciences , vol.27 , pp. 365-387
    • Kern, G.1    Wei, J.2
  • 15
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply chain: The Bullwhip effect
    • Lee, H.L., Padmanabhan, V. and Whang, S., 1997b, Information distortion in a supply chain: the Bullwhip effect. Management Science, 43, 5456-558.
    • (1997) Management Science , vol.43 , pp. 5456-5558
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 16
    • 84985848296 scopus 로고
    • A model for master production scheduling in uncertain environments
    • Lin, N.P. and Krajewski, L., 1992, A model for master production scheduling in uncertain environments. Decision Sciences, 23, 839-861.
    • (1992) Decision Sciences , vol.23 , pp. 839-861
    • Lin, N.P.1    Krajewski, L.2
  • 17
    • 0028401193 scopus 로고
    • The effects of environmental factors on the design of master production scheduling systems
    • Lin, N.P., Krajewski, L., Leong, K. and Benton, W.C., 1994, The effects of environmental factors on the design of master production scheduling systems. Journal of Operations Management, 11, 367-384.
    • (1994) Journal of Operations Management , vol.11 , pp. 367-384
    • Lin, N.P.1    Krajewski, L.2    Leong, K.3    Benton, W.C.4
  • 18
  • 19
    • 0002630635 scopus 로고
    • Bose Corp.: Hi-fi leaders stretches to meet growth challenges
    • Moody, P.E., 1991, Bose Corp.: Hi-fi leaders stretches to meet growth challenges. Target, Winter, 17-22.
    • (1991) Target , vol.WINTER , pp. 17-22
    • Moody, P.E.1
  • 20
    • 0011751874 scopus 로고
    • WAW's 14th annual supplier surveysuppliers to Uncle Sam: Build us a ladder, let's form a MITI
    • Plumb, S.E., 1992, WAW's 14th annual supplier surveysuppliers to Uncle Sam: build us a ladder, let's form a MITI. Ward's Auto World, July.
    • (1992) Ward's Auto World , vol.JULY
    • Plumb, S.E.1
  • 21
    • 84985759548 scopus 로고
    • Freezing the master production schedule under demand uncertainty
    • Sridharan, V. and Berry, W.L., 1990a, Freezing the master production schedule under demand uncertainty. Decision Sciences, 21, 97-120.
    • (1990) Decision Sciences , vol.21 , pp. 97-120
    • Sridharan, V.1    Berry, W.L.2
  • 22
    • 0025399203 scopus 로고
    • Master production scheduling make-to-stock products: A framework for analysis
    • Sridharan, V. and Berry, W.L., 1990b, Master production scheduling make-to-stock products: a framework for analysis. International Journal of Production Research, 28, 541-558.
    • (1990) International Journal of Production Research , vol.28 , pp. 541-558
    • Sridharan, V.1    Berry, W.L.2
  • 23
    • 0023404035 scopus 로고
    • Freezing the master production schedule under rolling planning horizons
    • Sridharan, V., Berry, W.L. and Udayabhanu, V., 1987, Freezing the master production schedule under rolling planning horizons. Management Science, 33, 1137-1149.
    • (1987) Management Science , vol.33 , pp. 1137-1149
    • Sridharan, V.1    Berry, W.L.2    Udayabhanu, V.3
  • 24
    • 84985855322 scopus 로고
    • Measuring master production scheduling stability under rolling planning horizons
    • Sridharan, V., Berry, W.L. and Udayabhanu, V., 1988, Measuring master production scheduling stability under rolling planning horizons. Decision Sciences, 19, 147-166.
    • (1988) Decision Sciences , vol.19 , pp. 147-166
    • Sridharan, V.1    Berry, W.L.2    Udayabhanu, V.3
  • 25
    • 21844485482 scopus 로고
    • Freezing the master production schedule: Implications for fill rate
    • Sridharan, V. and Laforge, R., 1994, Freezing the master production schedule: implications for fill rate. Decision Sciences, 25, 461-469.
    • (1994) Decision Sciences , vol.25 , pp. 461-469
    • Sridharan, V.1    Laforge, R.2
  • 27
    • 0002211882 scopus 로고    scopus 로고
    • Modeling supply contracts: A review
    • edited by S. Tayur, R. Ganeshan and M. Magazine (Boston: Kluwer Academic), Chapter 10
    • Tsay, A.A., Nahmias, S. and Agrawal, N., 1999, Modeling supply contracts: a review. In Quantitative Models for Supply Chain Management, edited by S. Tayur, R. Ganeshan and M. Magazine (Boston: Kluwer Academic), Chapter 10, pp. 308-336.
    • (1999) Quantitative Models for Supply Chain Management , pp. 308-336
    • Tsay, A.A.1    Nahmias, S.2    Agrawal, N.3
  • 28
    • 84968118669 scopus 로고
    • The management of manufacturing flexibility
    • Upton, D.M., 1994, The management of manufacturing flexibility. California Management Review, Winter, 72-89.
    • (1994) California Management Review , vol.WINTER , pp. 72-89
    • Upton, D.M.1
  • 29
    • 0027612429 scopus 로고
    • Freezing the master production schedule for material requirements planning systems under demand uncertainty
    • Zhao, X. and Lee, T.S., 1993, Freezing the master production schedule for material requirements planning systems under demand uncertainty. Journal of Operations Management, 11, 185-205.
    • (1993) Journal of Operations Management , vol.11 , pp. 185-205
    • Zhao, X.1    Lee, T.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.