-
1
-
-
0028462030
-
A multiple objective approach for constructing attribute-sampling plans for non-serial assembly items
-
Baker, J.R., Clayton, E.R., Matheson, L.A. and Rakes, T.R., 1994, A multiple objective approach for constructing attribute-sampling plans for non-serial assembly items. International Journal of Production Research, 32, 1599-1613.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1599-1613
-
-
Baker, J.R.1
Clayton, E.R.2
Matheson, L.A.3
Rakes, T.R.4
-
2
-
-
0002762260
-
Design of an optimal sequence of interrelated sampling plans
-
Beightler, C.C. and Mitten, L.G., 1964, Design of an optimal sequence of interrelated sampling plans. Journal of the American Statistical Association, 59, 96-104.
-
(1964)
Journal of the American Statistical Association
, vol.59
, pp. 96-104
-
-
Beightler, C.C.1
Mitten, L.G.2
-
3
-
-
0020593225
-
On the selection of a prior distribution in Bayesian acceptance sampling
-
Case, K.E. and Keats, B.J., 1982, On the selection of a prior distribution in Bayesian acceptance sampling. Journal of Quality Technology, 14, 10-18.
-
(1982)
Journal of Quality Technology
, vol.14
, pp. 10-18
-
-
Case, K.E.1
Keats, B.J.2
-
4
-
-
4243274498
-
-
Working paper, Operations Research Center, MIT, Cambridge, MA
-
Chevalier, P.B. and Wein, L.M., 1996, Inspection for circuit board assembly. Working paper, Operations Research Center, MIT, Cambridge, MA.
-
(1996)
Inspection for circuit board assembly
-
-
Chevalier, P.B.1
Wein, L.M.2
-
5
-
-
0002025538
-
A Bayesian quality assurance model for a multistage production process
-
Boston, MA
-
Dietrich, D.L. and Saunders, J.L., 1974, A Bayesian quality assurance model for a multistage production process. ASQC Technical Conference Transactions, Boston, MA, pp. 338-348.
-
(1974)
ASQC Technical Conference Transactions
, pp. 338-348
-
-
Dietrich, D.L.1
Saunders, J.L.2
-
6
-
-
0023416587
-
Multiobjective decision analysis for acceptance sampling plans
-
Evans, G.W. and Alexander, S.M., 1987, Multiobjective decision analysis for acceptance sampling plans, IIE Transactions, 19, 308-316.
-
(1987)
IIE Transactions
, vol.19
, pp. 308-316
-
-
Evans, G.W.1
Alexander, S.M.2
-
7
-
-
0017937877
-
A taxonomy of economically based quality control procedures
-
Menipaz, E., 1978, A taxonomy of economically based quality control procedures. International Journal of Production Research, 16, 153-167.
-
(1978)
International Journal of Production Research
, vol.16
, pp. 153-167
-
-
Menipaz, E.1
-
8
-
-
0022737756
-
Multistage multiattribute acceptance sampling in serial production systems
-
Moskowitz, H., Plante, R. and Tang, K., 1986, Multistage multiattribute acceptance sampling in serial production systems. IIE Transactions, 18, 130-137.
-
(1986)
IIE Transactions
, vol.18
, pp. 130-137
-
-
Moskowitz, H.1
Plante, R.2
Tang, K.3
-
9
-
-
0001650113
-
A survey of models for allocating inspection effort in multistage production systems
-
Raz, T., 1986, A survey of models for allocating inspection effort in multistage production systems. Journal of Quality Technology, 18, 239-247.
-
(1986)
Journal of Quality Technology
, vol.18
, pp. 239-247
-
-
Raz, T.1
-
10
-
-
0026205992
-
Location and sequencing of imperfect inspection operations in serial multi-stage production systems
-
Raz, T. and Kaspi, M., 1991, Location and sequencing of imperfect inspection operations in serial multi-stage production systems. International Journal of Production Research, 29, 1645-1659.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1645-1659
-
-
Raz, T.1
Kaspi, M.2
-
11
-
-
0022737555
-
Multiattribute Bayesian acceptance sampling plans under nondestructive inspection
-
Tang, K., Plante, R. and Moskowitz, H., 1986, Multiattribute Bayesian acceptance sampling plans under nondestructive inspection. Management Science, 32, 739-750.
-
(1986)
Management Science
, vol.32
, pp. 739-750
-
-
Tang, K.1
Plante, R.2
Moskowitz, H.3
-
12
-
-
4243217630
-
-
Leaders for Manufacturing technical report, Massachusetts Institute of Technology, Cambridge, MA
-
Veatch, M.H., 1996, Inspection strategies to reduce the cost of quality. Leaders for Manufacturing technical report, Massachusetts Institute of Technology, Cambridge, MA.
-
(1996)
Inspection strategies to reduce the cost of quality
-
-
Veatch, M.H.1
-
13
-
-
0003131458
-
Optimal allocation of inspection effort in multistage manufacturing processes
-
Woo, W.K. and Metcalfe, T.E., 1972, Optimal allocation of inspection effort in multistage manufacturing processes. Western Electric Engineer, 16, 8-16.
-
(1972)
Western Electric Engineer
, vol.16
, pp. 8-16
-
-
Woo, W.K.1
Metcalfe, T.E.2
|