-
2
-
-
0012303620
-
An integrated algorithm for successful implementation of total quality control programs
-
Spring
-
Azadeh.M.A., An Integrated Algorithm for Successful Implementation of Total Quality Control Programs, Rahyaft (Science Policy Quarterly), No. 20, Spring, 1999.
-
(1999)
Rahyaft (Science Policy Quarterly)
, vol.20
-
-
Azadeh, M.A.1
-
4
-
-
33745776364
-
Integrating methods of enhancing reliability of manufacturing systems in 21 century
-
Faculty of Engineering, University of Tehran, Iran
-
Azadeh.M.A., Integrating Methods of Enhancing Reliability of Manufacturing Systems in 21 Century, Proceedings of the Conference on Fundamental and Industrial Research Achievement, Faculty of Engineering, University of Tehran, Iran, 2000.
-
(2000)
Proceedings of the Conference on Fundamental and Industrial Research Achievement
-
-
Azadeh, M.A.1
-
5
-
-
0003964033
-
-
Cambridge, MA, MIT, Center for Advanced Engineering Study
-
Deming.W.E., Out of Crisis, Cambridge, MA, MIT, Center for Advanced Engineering Study, 1986.
-
(1986)
Out of Crisis
-
-
Deming, W.E.1
-
6
-
-
0012254770
-
Assessment of the factors affecting quality in industrial world
-
Sharif University of Technology, December
-
Azadeh.M.A., Assessment of the Factors Affecting Quality in Industrial World, Proceedings of the National Conference on Quality Management, Sharif University of Technology, December 1999.
-
(1999)
Proceedings of the National Conference on Quality Management
-
-
Azadeh, M.A.1
-
7
-
-
0012320997
-
Strategies for variability reduction
-
Mackay.R.J. and Steiner.S.H., Strategies for Variability Reduction, Quality Engineering, Vol. 10, No.1, 1998, pp125-136.
-
(1998)
Quality Engineering
, vol.10
, Issue.1
, pp. 125-136
-
-
Mackay, R.J.1
Steiner, S.H.2
-
9
-
-
0025480251
-
Team concept to mitigate a MIC failure in a petrochemical plant cooling system
-
Hart.R.A., Whitaker.J.M., Hughes.D.H. and Templet.H.P., Team Concept to Mitigate a MIC Failure in a Petrochemical Plant Cooling System, Material Performance, Vol.29, 1990, pp40-44.
-
(1990)
Material Performance
, vol.29
, pp. 40-44
-
-
Hart, R.A.1
Whitaker, J.M.2
Hughes, D.H.3
Templet, H.P.4
-
10
-
-
0012306356
-
How to build an effective team
-
Raudsepp.E., How to Build an Effective Team, Machine Design, Vol.55, 1983, pp61-69.
-
(1983)
Machine Design
, vol.55
, pp. 61-69
-
-
Raudsepp, E.1
-
11
-
-
0012287272
-
A new system of vendor quality rating
-
Koslow.B. and Lutzker.L., A New System of Vendor Quality Rating, Quality Engineering, Vol.10, No.4, 1998, pp701-703.
-
(1998)
Quality Engineering
, vol.10
, Issue.4
, pp. 701-703
-
-
Koslow, B.1
Lutzker, L.2
-
14
-
-
0012297922
-
Difficulty associated with installation of quality assurance and management in a developing country
-
SCGM
-
Rezaie.K. and Azadeh.M.A., Difficulty Associated with Installation of Quality Assurance and Management in a Developing Country, CSME Forum, SCGM, Volume 3, 1988.
-
(1988)
CSME Forum
, vol.3
-
-
Rezaie, K.1
Azadeh, M.A.2
-
17
-
-
3543112094
-
An international study of quality improvement approach and firm performance
-
Ribera.J. and Samson.D., An International Study of Quality Improvement Approach and Firm Performance, International Journal of Operations Management, Vol. 17, No.9, 1997.
-
(1997)
International Journal of Operations Management
, vol.17
, Issue.9
-
-
Ribera, J.1
Samson, D.2
-
18
-
-
0032183983
-
Computer aided statistical monitoring of automated manufacturing processes
-
Xie.M., Goh.T.N. and Lu.S., Computer Aided Statistical Monitoring of Automated Manufacturing Processes, Computers & Industrial Engineering, Vol.35, Nos.1-2, 1998, pp189-192.
-
(1998)
Computers & Industrial Engineering
, vol.35
, Issue.1-2
, pp. 189-192
-
-
Xie, M.1
Goh, T.N.2
Lu, S.3
-
19
-
-
0025568743
-
Example of an analysis for the introduction of a computer aided quality (CAQ) system
-
Example of an Analysis for the Introduction of a Computer Aided Quality (CAQ) System, Welding in the World, Vol.28, No.5/6, 1990, pp84-90.
-
(1990)
Welding in the World
, vol.28
, Issue.5-6
, pp. 84-90
-
-
|