메뉴 건너뛰기




Volumn , Issue A, 2000, Pages 891-904

New through-tubing junction-isolation system enables high-pressure stimulation in the Ekofisk X-02 North Sea multilateral well: Case history

Author keywords

[No Author keywords available]

Indexed keywords

COSTS; DRILLING PLATFORMS; HIGH PRESSURE EFFECTS; LITHOLOGY; RISK ASSESSMENT;

EID: 0034589493     PISSN: 08859248     EISSN: None     Source Type: Journal    
DOI: 10.2118/63268-ms     Document Type: Conference Paper
Times cited : (8)

References (7)
  • 1
    • 0032676756 scopus 로고    scopus 로고
    • Continuous improvement in the design and execution of multilateral projects in the greater ekofisk area
    • Paper SPE/IADC 52870, Amsterdam, Holland, 911 March
    • Berg, J.R., Liland, G.: "Continuous Improvement in the Design and Execution of Multilateral Projects in the Greater Ekofisk Area," Paper SPE/IADC 52870 presented at the 1999 SPE/IADC Drilling Conference held in Amsterdam, Holland, 911 March 1999.
    • (1999) 1999 SPE/IADC Drilling Conference
    • Berg, J.R.1    Liland, G.2
  • 2
    • 0029727971 scopus 로고    scopus 로고
    • World's first application of a multilateral system combining a cased and cemented junction with full bore access to both laterals
    • paper SPE36488, in Denver, October
    • Hovda, S., Haugland, T., Waddell, K., Leknes, R., "World's First Application of a Multilateral System Combining a Cased and Cemented Junction with Full Bore Access to Both Laterals," paper SPE36488 presented at the 71st Annual Technical Conference in Denver, October 1996.
    • (1996) 71st Annual Technical Conference
    • Hovda, S.1    Haugland, T.2    Waddell, K.3    Leknes, R.4
  • 3
    • 0031679122 scopus 로고    scopus 로고
    • First successful multilateral well installation from a floating rig: Development and Case history
    • SPE 39369, Dallas, 3-6 March
    • Freemen, A., Berge, F., Gronas, T., Durst, D., and Luke, M.: "First Successful Multilateral Well Installation From a Floating Rig: Development and Case History". SPE 39369 presented at the 1998 SPE Drilling Conference, Dallas, 3-6 March 1998.
    • (1998) 1998 SPE Drilling Conference
    • Freemen, A.1    Berge, F.2    Gronas, T.3    Durst, D.4    Luke, M.5
  • 4
    • 17044448868 scopus 로고    scopus 로고
    • Design, planning, implementation & management of a multi-lateral well on the forties field: A north sea case history
    • OTC Paper, Houston, TX 5-6 May
    • Jones, R.D., Lurie, P., Hibbert, E.D., Butler, P., Freeman, A.: "Design, Planning, Implementation & Management of a Multi-Lateral Well on the Forties Field: A North Sea Case History," OTC Paper presented at the 1997 OTC held in Houston, TX 5-6 May 1997.
    • (1997) 1997 OTC
    • Jones, R.D.1    Lurie, P.2    Hibbert, E.D.3    Butler, P.4    Freeman, A.5
  • 5
    • 0012087989 scopus 로고    scopus 로고
    • Unique test process resolves junction difficulties in a multilateral completion on the north sea
    • Paper SPE 50661, The Hague, 10/20/98 to 10/22/98
    • Hovda S., Arrestad, A., Bjorneli, H.M., Freeman, A.:"Unique Test Process Resolves Junction Difficulties in a Multilateral Completion on the North Sea," Paper SPE 50661 presented at the SPE European Petroleum Conference, The Hague, 10/20/98 to 10/22/98.
    • SPE European Petroleum Conference
    • Hovda, S.1    Arrestad, A.2    Bjorneli, H.M.3    Freeman, A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.