메뉴 건너뛰기




Volumn 49, Issue 50, 2000, Pages 811-816

Experience gained during the modification of the Caprice system to Caper

Author keywords

[No Author keywords available]

Indexed keywords

CATALYST ACTIVITY; EXHAUST GASES; FUSION REACTIONS; ISOTOPES; PIPE LININGS; TRITIUM;

EID: 0034317434     PISSN: 09203796     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0920-3796(00)00206-4     Document Type: Article
Times cited : (17)

References (7)
  • 1
    • 85120197073 scopus 로고    scopus 로고
    • th SOFT, Marseille, France, 1998, pp. 1015.
  • 2
    • 85120221534 scopus 로고    scopus 로고
    • th SOFT, Lisbon, Portugal, 1996, pp. 1197.
  • 3
    • 0029393068 scopus 로고
    • Commissioning of the catalytic plasma exhaust clean-up facility Caprice and first experimental results
    • M. Glugla R. Kraemer R.-D. Penzhorn Commissioning of the catalytic plasma exhaust clean-up facility Caprice and first experimental results Fus. Technol. 28 1995 625
    • (1995) Fus. Technol. , vol.28 , pp. 625
    • Glugla, M.1    Kraemer, R.2    Penzhorn, R.-D.3
  • 4
    • 85120223418 scopus 로고    scopus 로고
    • th SOFT, Lisbon, Portugal, 1996, pp. 1193.
  • 5
    • 85120209406 scopus 로고    scopus 로고
    • L. Rodrigo, J.M. Miller, J.A. Senohrabek, et al. ITER Task T299 (1996): Fuel Cleanup System Demonstration Tests, Report CFFTP G-9722, May, 1997.
  • 6
    • 85120190597 scopus 로고    scopus 로고
    • P. Herrmann Ph.D. Thesis 1998 Universität Marburg Germany
    • (1998)
    • Herrmann, P.1
  • 7
    • 0002330331 scopus 로고
    • The Tritium Laboratory Karlsruhe: laboratory design and equipment
    • P. Schira E. Hutter G. Jourdan R.D. Penzhorn The Tritium Laboratory Karlsruhe: laboratory design and equipment Fus. Eng. Des. 18 1991 19
    • (1991) Fus. Eng. Des. , vol.18 , pp. 19
    • Schira, P.1    Hutter, E.2    Jourdan, G.3    Penzhorn, R.D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.