1
-
-
0003737163
-
ITER: Technical Basis for the ITER Final Design Report
-
Chapter II, Section 4.4, 13, July
-
ITER: Technical Basis for the ITER Final Design Report, Cost Review and Safety Analysis (FDR), Chapter II, Section 4.4, 13, July 1998.
-
(1998)
Cost Review and Safety Analysis (FDR)
-
-
-
2
-
-
0033225914
-
Tritium inventory issues for future reactors: Choices, parameters, limits
-
(Proc. SOFT 20, Marseille, Sept., in publication
-
D.K. Murdoch, Ch. Day, P. Gierszewski, R-D. Penzhorn, C.H. Wu, Tritium inventory issues for future reactors: choices, parameters, limits; Fus. Eng. Des. (1999), (Proc. SOFT 20, Marseille, Sept., 1998), in publication.
-
(1998)
Fus. Eng. Des.
-
-
Murdoch, D.K.1
Day, Ch.2
Gierszewski, P.3
Penzhorn, R.-D.4
Wu, C.H.5
-
3
-
-
0032157981
-
Design of a catalytic exhaust clean-up unit for ITER and experimental results
-
Glugla M., Murdoch D.K., Geißler H., Herrmann P., Kraemer R., Le T.L. Design of a catalytic exhaust clean-up unit for ITER and experimental results. Fus. Eng. Des. 39-40:1998;893-899.
-
(1998)
Fus. Eng. Des.
, vol.3940
, pp. 893-899
-
-
Glugla, M.1
Murdoch, D.K.2
Geißler, H.3
Herrmann, P.4
Kraemer, R.5
Le, T.L.6
-
4
-
-
0000756541
-
Tritium tests with a Permcat reactor for isotopic swamping
-
Fus. Technol. Lisbon, Portugal
-
M. Glugla, J. Miller, P. Herrmann, M. Iseli, R.-D. Penzhorn, Tritium tests with a Permcat reactor for isotopic swamping, Fus. Technol. 1996, 1193; Proceedings of the 19th SOFT, Lisbon, Portugal.
-
(1996)
Proceedings of the 19th SOFT
, pp. 1193
-
-
Glugla, M.1
Miller, J.2
Herrmann, P.3
Iseli, M.4
Penzhorn, R.-D.5
-
5
-
-
0342722109
-
-
September 20, ITER-IL-FC-8.1-0-18
-
A. Busigin, S.K. Sood, O.K. Kveton, R.H. Sherman, J.L. Anderson, ITER Isotope Separation System Conceptual Design Description Revision 2.0, September 20, 1990, ITER-IL-FC-8.1-0-18.
-
(1990)
ITER Isotope Separation System Conceptual Design Description Revision 2.0
-
-
Busigin, A.1
Sood, S.K.2
Kveton, O.K.3
Sherman, R.H.4
Anderson, J.L.5
-
7
-
-
0029393999
-
Installation and early operation of a complex low inventory cryogenic distillation system for the Princeton TFTR
-
(Oct.
-
A. Busigin et al., Installation and early operation of a complex low inventory cryogenic distillation system for the Princeton TFTR. Fus, Technol. 28 (Oct. 1995).
-
(1995)
Fus, Technol.
, vol.28
-
-
Busigin, A.1
-
9
-
-
0342287000
-
Ontario Hydro: Process simulation with microcomputers: A generalized simulation code for application to fission and fusion systems
-
A. Busigin, S.K. Sood, Ontario Hydro: process simulation with microcomputers: a generalized simulation code for application to fission and fusion systems, Can. Nucl. Soc. Bull. 9(3) (May/June 1988).
-
(1988)
Can. Nucl. Soc. Bull.
, vol.9
, Issue.3 MAY-JUNE
-
-
Busigin, A.1
Sood, S.K.2
-
10
-
-
0032156190
-
CFTSIM-ITER dynamic fuel cycle model
-
Busigin A., Gierszewski P. CFTSIM-ITER dynamic fuel cycle model. Fus. Eng. Des. 39-40:1998;909-914.
-
(1998)
Fus. Eng. Des.
, vol.3940
, pp. 909-914
-
-
Busigin, A.1
Gierszewski, P.2
|