|
Volumn 36, Issue 5, 2000, Pages 953-963
|
Should dams be modified for the probable maximum flood?
|
Author keywords
Dam safety; Dams; Economics; Floods; Probable maximum flood; Probable maximum precipitation; Risk; Safety
|
Indexed keywords
ACCIDENT PREVENTION;
ECONOMICS;
FLOODS;
PRECIPITATION (METEOROLOGY);
RISKS;
SPILLWAYS;
PROBABLE MAXIMUM FLOOD;
PROBABLE MAXIMUM PRECIPITATION;
DAMS;
COST-BENEFIT ANALYSIS;
DAM;
DESIGN;
FLOOD CONTROL;
OVERTOPPING;
SPILLWAY;
DAM CONSTRUCTION;
FLOOD CONTROL;
OVERTOPPING;
SPILLWAY;
UNITED STATES;
|
EID: 0034302220
PISSN: 1093474X
EISSN: None
Source Type: Journal
DOI: 10.1111/j.1752-1688.2000.tb05701.x Document Type: Article |
Times cited : (24)
|
References (36)
|