|
Volumn 15, Issue 4, 2000, Pages 415-420
|
Application of multicriteria analysis to select the best highway alignment
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ALIGNMENT;
COSTS;
ENVIRONMENTAL IMPACT;
OPTIMIZATION;
ROAD CONSTRUCTION;
ALIGNMENT GEOMETRY;
HIGHWAY ENGINEERING;
MULTICRITERIA ANALYSIS;
ROAD CONSTRUCTION;
TRAJECTORY;
TUNNELING;
|
EID: 0034289716
PISSN: 08867798
EISSN: None
Source Type: Journal
DOI: 10.1016/S0886-7798(01)00010-4 Document Type: Article |
Times cited : (32)
|
References (6)
|