-
2
-
-
0000111181
-
Controlling prototype development through risk analysis
-
Baskerville R.L., Stage J. Controlling prototype development through risk analysis. MIS Quarterly. 20:1996;481-504.
-
(1996)
MIS Quarterly
, vol.20
, pp. 481-504
-
-
Baskerville, R.L.1
Stage, J.2
-
3
-
-
84976748356
-
Selecting the appropriate application development methodology
-
Burns, R.N., Dennis, A.R., 1985. Selecting the appropriate application development methodology. Data Base 19-23.
-
(1985)
Data Base
, pp. 19-23
-
-
Burns, R.N.1
Dennis, A.R.2
-
4
-
-
0019928380
-
Strategies for information requirements determination
-
Davis G.B. Strategies for information requirements determination. IBM Systems Journal. 21(1):1982;3-30.
-
(1982)
IBM Systems Journal
, vol.21
, Issue.1
, pp. 3-30
-
-
Davis, G.B.1
-
5
-
-
0343552676
-
An empirical validation of a contingency model for information requirements determination
-
El Louadi M., Galleta D.F., Sampler J.L. An empirical validation of a contingency model for information requirements determination. Data Base. 29(3):1999;16-28.
-
(1999)
Data Base
, vol.29
, Issue.3
, pp. 16-28
-
-
El Louadi, M.1
Galleta, D.F.2
Sampler, J.L.3
-
6
-
-
0039306428
-
Selecting a requirement determination methodology-contingency approach revisited
-
Fazlollahi B., Tanniru M.R. Selecting a requirement determination methodology-contingency approach revisited. Information and Management. 21:1991;291-303.
-
(1991)
Information and Management
, vol.21
, pp. 291-303
-
-
Fazlollahi, B.1
Tanniru, M.R.2
-
7
-
-
0343552677
-
L'effet de L'incertitude et des strategies de determination des besoins de l'utilisateur sur les projets d'informatisation
-
Galleta D.F., El Louadi M. L'effet de L'incertitude et des strategies de determination des besoins de l'utilisateur sur les projets d'informatisation. Canadian Journal of Administrative Systems. 12(1):1995;56-76.
-
(1995)
Canadian Journal of Administrative Systems
, vol.12
, Issue.1
, pp. 56-76
-
-
Galleta, D.F.1
El Louadi, M.2
-
8
-
-
0032207894
-
A framework for identifying software project risks
-
Keil M., Cule P., Lyytinen K., Schmidt R. A framework for identifying software project risks. Communications of the ACM. 41(11):1998;76-83.
-
(1998)
Communications of the ACM
, vol.41
, Issue.11
, pp. 76-83
-
-
Keil, M.1
Cule, P.2
Lyytinen, K.3
Schmidt, R.4
-
10
-
-
0025587166
-
Complexity and uncertainty in software design
-
IEEE Computer Society Press, Silver Spring, MD
-
Mathiassen, L., Stage, J., 1990. Complexity and uncertainty in software design. In: Proceedings of the 1990 IEEE Conference on Computer Systems and Software Engineering. IEEE Computer Society Press, Silver Spring, MD, pp. 482-489.
-
(1990)
In: Proceedings of the 1990 IEEE Conference on Computer Systems and Software Engineering
, pp. 482-489
-
-
Mathiassen, L.1
Stage, J.2
-
11
-
-
0030361295
-
An inventory of personal constructs for risk researchers
-
Moynihan T. An inventory of personal constructs for risk researchers. Journal of Information Technology. 11:1996;359-371.
-
(1996)
Journal of Information Technology
, vol.11
, pp. 359-371
-
-
Moynihan, T.1
-
12
-
-
0343988675
-
-
Working Paper, University of Minneapolis, Minnesota
-
Naumann, J.D., Jenkins, A.M., Wetherbe, J.C., 1983. The information requirements determination contingency model: an empirical Investigation. Working Paper, University of Minneapolis, Minnesota.
-
(1983)
The Information Requirements Determination Contingency Model: An Empirical Investigation
-
-
Naumann, J.D.1
Jenkins, A.M.2
Wetherbe, J.C.3
-
13
-
-
0030368793
-
Standardization, requirements uncertainty and software project performance
-
Nidumolu S.R. Standardization, requirements uncertainty and software project performance. Information and Management. 31:1996;135-150.
-
(1996)
Information and Management
, vol.31
, pp. 135-150
-
-
Nidumolu, S.R.1
-
16
-
-
0029368306
-
Uncertainty and equivocality in projects: Managing their implications for the project team
-
Stork D., Sapienza A.M. Uncertainty and equivocality in projects: managing their implications for the project team. Engineering Management Journal. 7(3):1995;33-38.
-
(1995)
Engineering Management Journal
, vol.7
, Issue.3
, pp. 33-38
-
-
Stork, D.1
Sapienza, A.M.2
|