메뉴 건너뛰기




Volumn 11, Issue 5, 2000, Pages 443-458

Genetic algorithm to production planning and scheduling problems for manufacturing systems

Author keywords

Earliness tardiness production scheduling and planning (ETPSP); Genetic algorithms (GAs); Multi objective (MO); Optimization; Production inventory management and control (PIMC)

Indexed keywords

COMPUTER SIMULATION; GENETIC ALGORITHMS; INVENTORY CONTROL; JUST IN TIME PRODUCTION; OPTIMIZATION; PRODUCTION CONTROL; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0034236861     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/09537280050051942     Document Type: Article
Times cited : (37)

References (27)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker, K.R., and Scudder, G.D., 1990, Sequencing with earliness and tardiness penalties: a review. Operation Research, 38, 22-36.
    • (1990) Operation Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0027542554 scopus 로고
    • Single-machine scheduling with early and tardy completion costs
    • Davis, J.S., and Kanet, J.J., 1993, Single-machine scheduling with early and tardy completion costs. Naval Research Logistics, 40, 85-101.
    • (1993) Naval Research Logistics , vol.40 , pp. 85-101
    • Davis, J.S.1    Kanet, J.J.2
  • 4
    • 0025792925 scopus 로고
    • Scheduling to minimize weighted earliness and tardiness about a common due-date
    • De, P., Ghosh, J.B., and Wells, C.E., 1991, Scheduling to minimize weighted earliness and tardiness about a common due-date. Computer Operation Research, 18, 465-475.
    • (1991) Computer Operation Research , vol.18 , pp. 465-475
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 9
    • 0026223827 scopus 로고
    • Earlinesstardiness scheduling problem II: Deviation of completion times about a restrictive common due date
    • Hall, N.G., Kubiak, W., and Sethi, S.P., 1991, Earlinesstardiness scheduling problem II: deviation of completion times about a restrictive common due date. Operation Research, 39, 847-856.
    • (1991) Operation Research , vol.39 , pp. 847-856
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.P.3
  • 10
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problem I: Weighted deviation of completion times about a common due date
    • Hall, N.G., and Posner, M.E., 1991, Earliness-tardiness scheduling problem I: weighted deviation of completion times about a common due date. Operation Research, 39, 836-846.
    • (1991) Operation Research , vol.39 , pp. 836-846
    • Hall, N.G.1    Posner, M.E.2
  • 11
    • 0032095739 scopus 로고    scopus 로고
    • Minimizing the sum of job earliness and tardiness in a multimachine system
    • Heady, R.B., and Zhu, Z., 1998, Minimizing the sum of job earliness and tardiness in a multimachine system. International Journal of Production Research, 36, 1619-1632.
    • (1998) International Journal of Production Research , vol.36 , pp. 1619-1632
    • Heady, R.B.1    Zhu, Z.2
  • 12
    • 0024702296 scopus 로고
    • Evaluation the impact operating environment on MRP system nervousness
    • Ho, C.J., 1989, Evaluation the impact operating environment on MRP system nervousness. International Journal of Production Research, 27, 1115-1135.
    • (1989) International Journal of Production Research , vol.27 , pp. 1115-1135
    • Ho, C.J.1
  • 13
    • 0026168681 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part 1
    • Hodgson, T.J., and Wang, D.W., 1991a, Optimal hybrid push/pull control strategies for a parallel multistage system: part 1. International Journal of Production Research, 29, 1279-1287.
    • (1991) International Journal of Production Research , vol.29 , pp. 1279-1287
    • Hodgson, T.J.1    Wang, D.W.2
  • 14
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part 2
    • Hodgson, T.J., and Wang, D.W., 1991b, Optimal hybrid push/pull control strategies for a parallel multistage system: part 2. International Journal of Production Research, 29, 1453-1460.
    • (1991) International Journal of Production Research , vol.29 , pp. 1453-1460
    • Hodgson, T.J.1    Wang, D.W.2
  • 15
    • 0001599645 scopus 로고
    • The impact of just-in-time on firm performance in the US
    • Huson, M., and Nanda, D., 1995, The impact of just-in-time on firm performance in the US. Journal of Operations Management, 12, 297-310.
    • (1995) Journal of Operations Management , vol.12 , pp. 297-310
    • Huson, M.1    Nanda, D.2
  • 16
    • 0028734441 scopus 로고
    • Minimizing mean tardiness and earliness in single-machine scheduling problem with unequal due dates
    • Kim, Y.D., and Yano, C.A., 1994, Minimizing mean tardiness and earliness in single-machine scheduling problem with unequal due dates. Naval Research Logistics, 41, 913-933.
    • (1994) Naval Research Logistics , vol.41 , pp. 913-933
    • Kim, Y.D.1    Yano, C.A.2
  • 20
    • 0028014741 scopus 로고
    • Revisiting the Johnson algorithm for flowshop scheduling with genetic algorithms
    • North-Holland: Elsevier Science B. V
    • Mulkens, H., 1994, Revisiting the Johnson algorithm for flowshop scheduling with genetic algorithms. In IPIF Transactions on Knowledge-Based Reactive Scheduling (B-15) (North-Holland: Elsevier Science B. V), pp. 69-80.
    • (1994) IPIF Transactions on Knowledge-Based Reactive Scheduling (B-15) , pp. 69-80
    • Mulkens, H.1
  • 23
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • Sarker, B.R., and Fitzsimmons, J.A., 1989, The performance of push and pull systems: a simulation and comparative study. International Journal of Production Research, 27, 1715-1732.
    • (1989) International Journal of Production Research , vol.27 , pp. 1715-1732
    • Sarker, B.R.1    Fitzsimmons, J.A.2
  • 24
    • 0027557236 scopus 로고
    • Adjacent orderings in single-machine scheduling with earliness and tardiness penalties
    • Szwarc, W., 1993, Adjacent orderings in single-machine scheduling with earliness and tardiness penalties. Naval Research Logistics, 49, 229-243.
    • (1993) Naval Research Logistics , vol.49 , pp. 229-243
    • Szwarc, W.1
  • 25
    • 84977334714 scopus 로고
    • Optimal timing scheduling in earliness-tardiness single machine sequencing
    • Szwarc, W., and Mukhopadhyay, S.K., 1995, Optimal timing scheduling in earliness-tardiness single machine sequencing. Naval Research Logistics, 21, 1109-1114.
    • (1995) Naval Research Logistics , vol.21 , pp. 1109-1114
    • Szwarc, W.1    Mukhopadhyay, S.K.2
  • 26
    • 0029346791 scopus 로고
    • Earliness/tardiness production planning approaches for manufacturing systems
    • Wang, D.W., 1995, Earliness/tardiness production planning approaches for manufacturing systems. Computers & Industrial Engineering, 28, 425-436.
    • (1995) Computers & Industrial Engineering , vol.28 , pp. 425-436
    • Wang, D.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.