-
1
-
-
0000653202
-
A lot sizing and sequencing algorithm for dynamic demands upon a single facility
-
Aras O.A., Swanson L.A. A lot sizing and sequencing algorithm for dynamic demands upon a single facility. J. Ops. Mgmt. 2:(3):1982;177-185.
-
(1982)
J. Ops. Mgmt.
, vol.2
, Issue.3
, pp. 177-185
-
-
Aras, O.A.1
Swanson, L.A.2
-
3
-
-
0021494311
-
A cyclical scheduling heuristic for lot sizing with capacity constraints
-
Bahl H.C., Ritzman L.P. A cyclical scheduling heuristic for lot sizing with capacity constraints. Int. J. Prod. Rsch. 22:(5):1984;791-800.
-
(1984)
Int. J. Prod. Rsch.
, vol.22
, Issue.5
, pp. 791-800
-
-
Bahl, H.C.1
Ritzman, L.P.2
-
4
-
-
0023343841
-
Determining lot sizes and resource requirements: A review
-
Bahl H.C., Ritzman L.P., Gupta J.N.D. Determining lot sizes and resource requirements: a review. Ops. Rsch. 35:(3):1987;329-345.
-
(1987)
Ops. Rsch.
, vol.35
, Issue.3
, pp. 329-345
-
-
Bahl, H.C.1
Ritzman, L.P.2
Gupta, J.N.D.3
-
5
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran G.R., Yanasse H.H. Computational complexity of the capacitated lot size problem. Mgmt Sci. 28:(10):1982;1174-1186.
-
(1982)
Mgmt Sci.
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
6
-
-
0000204962
-
Cyclical schedules for capacitated lot sizing with dynamic demands
-
Campbell G.M., Mabert V.A. Cyclical schedules for capacitated lot sizing with dynamic demands. Mgmt Sci. 37:(4):1991;409-427.
-
(1991)
Mgmt Sci.
, vol.37
, Issue.4
, pp. 409-427
-
-
Campbell, G.M.1
Mabert, V.A.2
-
7
-
-
0023420909
-
The economic lot-scheduling problem: Achieving feasibility using time-varying lot sizes
-
Dobson G. The economic lot-scheduling problem: achieving feasibility using time-varying lot sizes. Ops. Rsch. 35:(5):1987;764-771.
-
(1987)
Ops. Rsch.
, vol.35
, Issue.5
, pp. 764-771
-
-
Dobson, G.1
-
8
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extensions
-
Elmaghraby S.E. The economic lot scheduling problem (ELSP): review and extensions. Mgmt Sci. 24:(6):1978;587-598.
-
(1978)
Mgmt Sci.
, vol.24
, Issue.6
, pp. 587-598
-
-
Elmaghraby, S.E.1
-
11
-
-
0019585243
-
A review of production scheduling
-
Graves S.C. A review of production scheduling. Ops. Rsch. 29:1981;646-675.
-
(1981)
Ops. Rsch.
, vol.29
, pp. 646-675
-
-
Graves, S.C.1
-
12
-
-
0023979380
-
Cycle scheduling for improvement
-
Hall R.W. Cycle scheduling for improvement. Int. J. Prod. Rsch. 26:(3):1988;457-472.
-
(1988)
Int. J. Prod. Rsch.
, vol.26
, Issue.3
, pp. 457-472
-
-
Hall, R.W.1
-
14
-
-
0029343762
-
Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems
-
Kim D., Mabert V.A. Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems. Int. J. Prod. Rsch. 33:(7):1995;2007-2022.
-
(1995)
Int. J. Prod. Rsch.
, vol.33
, Issue.7
, pp. 2007-2022
-
-
Kim, D.1
Mabert, V.A.2
-
15
-
-
84990623219
-
Integrative cycle scheduling approach for a capacitated flexible assembly system
-
Kim D., Mabert V.A., Pinto P.A. Integrative cycle scheduling approach for a capacitated flexible assembly system. Dec. Sci. 24:(1):1993;126-147.
-
(1993)
Dec. Sci.
, vol.24
, Issue.1
, pp. 126-147
-
-
Kim, D.1
Mabert, V.A.2
Pinto, P.A.3
-
16
-
-
0030284744
-
Optimal demand rate, lot sizing, and process reliability improvement decisions
-
Lee W.J., Kim D., Cabot A.V. Optimal demand rate, lot sizing, and process reliability improvement decisions. IIE Trans. 28:1996;941-952.
-
(1996)
IIE Trans.
, vol.28
, pp. 941-952
-
-
Lee, W.J.1
Kim, D.2
Cabot, A.V.3
-
17
-
-
0342583029
-
Ford motor company plastics division: Sandusky, Ohio, plant
-
V.A. Mabert. Englewood Cliffs, NJ: Prentice-Hall
-
Mabert V.A., Pinto P.A. Ford motor company plastics division: Sandusky, Ohio, plant. Mabert V.A. Cases in manufacturing and service systems. 1991;Prentice-Hall, Englewood Cliffs, NJ.
-
(1991)
Cases in Manufacturing and Service Systems
-
-
Mabert, V.A.1
Pinto, P.A.2
-
18
-
-
0022737333
-
Multi item single level capacitated dynamic lot sizing heuristics: A computational comparison (part 1: Static case)
-
Maes J., Van Wassenhove L.N. Multi item single level capacitated dynamic lot sizing heuristics: a computational comparison (part 1: static case). IIE Trans. 18:(2):1986;114-123.
-
(1986)
IIE Trans.
, vol.18
, Issue.2
, pp. 114-123
-
-
Maes, J.1
Van Wassenhove, L.N.2
-
19
-
-
84974870384
-
Multi item single level capacitated dynamic lot-sizing heuristics: A general review
-
Maes J., Van Wassenhove L.N. Multi item single level capacitated dynamic lot-sizing heuristics: a general review. J. Ops. Rsch. Soc. 39:(11):1988;991-1004.
-
(1988)
J. Ops. Rsch. Soc.
, vol.39
, Issue.11
, pp. 991-1004
-
-
Maes, J.1
Van Wassenhove, L.N.2
-
20
-
-
0022182776
-
Cyclic assembly schedules
-
McClain J.O., Trigeiro W.W. Cyclic assembly schedules. IIE Trans. 17:(4):1985;346-353.
-
(1985)
IIE Trans.
, vol.17
, Issue.4
, pp. 346-353
-
-
McClain, J.O.1
Trigeiro, W.W.2
-
21
-
-
84985817984
-
A joint lot sizing rule for fixed labor-cost situations
-
Pinto P.A., Mabert V.A. A joint lot sizing rule for fixed labor-cost situations. Dec. Sci. 17:(2):1986;139-150.
-
(1986)
Dec. Sci.
, vol.17
, Issue.2
, pp. 139-150
-
-
Pinto, P.A.1
Mabert, V.A.2
-
22
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus E.L. Optimal lot sizing, process quality improvement and setup cost reduction. Ops. Rsch. 34:1986;137-144.
-
(1986)
Ops. Rsch.
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
23
-
-
0000967878
-
Some extensions of the discrete lotsizing and scheduling problem
-
Salomon M., Kroon L.G., Kuik R., Van Wassenhove L.N. Some extensions of the discrete lotsizing and scheduling problem. Mgmt Sci. 37:(7):1991;801-812.
-
(1991)
Mgmt Sci.
, vol.37
, Issue.7
, pp. 801-812
-
-
Salomon, M.1
Kroon, L.G.2
Kuik, R.3
Van Wassenhove, L.N.4
-
24
-
-
0017557653
-
Toyota production system and kanban system: Materialization of just-in-time and respect-for-human system
-
Sugimori Y., Kusunoki K., Cho F., Unkikawa S. Toyota production system and kanban system: materialization of just-in-time and respect-for-human system. Int. J. Prod. Rsch. 15:1977;553-564.
-
(1977)
Int. J. Prod. Rsch.
, vol.15
, pp. 553-564
-
-
Sugimori, Y.1
Kusunoki, K.2
Cho, F.3
Unkikawa, S.4
-
25
-
-
0022699406
-
A comparative evaluation of heuristic line balancing techniques
-
Talbot F.B., Patterson J.H., Gehrlein W.V. A comparative evaluation of heuristic line balancing techniques. Mgmt Sci. 32:(4):1986;430-454.
-
(1986)
Mgmt Sci.
, vol.32
, Issue.4
, pp. 430-454
-
-
Talbot, F.B.1
Patterson, J.H.2
Gehrlein, W.V.3
-
26
-
-
0000555407
-
Capacitated lot sizing with setup times
-
Trigeiro W.W., Thomas L.J., McClain J.O. Capacitated lot sizing with setup times. Mgmt Sci. 35:(3):1989;353-366.
-
(1989)
Mgmt Sci.
, vol.35
, Issue.3
, pp. 353-366
-
-
Trigeiro, W.W.1
Thomas, L.J.2
McClain, J.O.3
|