-
1
-
-
0025694085
-
Two new rules to minimize tardiness in a job shop
-
Anderson, E. J., and Nyirenda, J. C., 1990, Two new rules to minimize tardiness in a job shop. International Journal of Production Research, 28, 2277-2292.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2277-2292
-
-
Anderson, E.J.1
Nyirenda, J.C.2
-
2
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
Baker, K. R., 1984, Sequencing rules and due-date assignments in a job shop. Management Science, 30, 1093-1104.
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
3
-
-
0002563758
-
Job shop scheduling with modified due dates
-
Baker, K. R., and Kanet, J. J., 1983, Job shop scheduling with modified due dates. Journal of Operations Management, 4, 11-22.
-
(1983)
Journal of Operations Management
, vol.4
, pp. 11-22
-
-
Baker, K.R.1
Kanet, J.J.2
-
4
-
-
0030214652
-
A simulated annealing approach for the one-machine mean tardiness scheduling problem
-
Ben-Daya, M and Al-Fawzan, M., 1996, A simulated annealing approach for the one-machine mean tardiness scheduling problem. European Journal of Operational Research, 93, 61-67.
-
(1996)
European Journal of Operational Research
, vol.93
, pp. 61-67
-
-
Ben-Daya, M.1
Al-Fawzan, M.2
-
5
-
-
0025449198
-
Simulated annealing: A tool for operational research
-
Eglese, R. W., 1990, Simulated annealing: a tool for operational research. European Journal of Operational Research, 46, 271-281.
-
(1990)
European Journal of Operational Research
, vol.46
, pp. 271-281
-
-
Eglese, R.W.1
-
7
-
-
0027698798
-
A multiple-pass heuristic rule for job shop scheduling with due dates
-
He, Z., Yang, T., and Deal, D. E., 1993, A multiple-pass heuristic rule for job shop scheduling with due dates. International Journal of Production Research, 31, 2677-2692.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2677-2692
-
-
He, Z.1
Yang, T.2
Deal, D.E.3
-
8
-
-
0029632605
-
Modified simulated annealing algorithms for the flow shop sequencing problem
-
Ishibuchi, H., Misaki, S., and Tanaka, H., 1995, Modified simulated annealing algorithms for the flow shop sequencing problem. European Journal of Operational Research, 81, 388-398.
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 388-398
-
-
Ishibuchi, H.1
Misaki, S.2
Tanaka, H.3
-
9
-
-
0012298197
-
Priority dispatching with operation due dates in a job shop
-
Kanet, J. J., and Hayya, J. C., 1982, Priority dispatching with operation due dates in a job shop. Journal of Operations Management, 2, 167-175.
-
(1982)
Journal of Operations Management
, vol.2
, pp. 167-175
-
-
Kanet, J.J.1
Hayya, J.C.2
-
10
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatt, C. D., and Vecchi, M. P., 1983, Optimization by simulated annealing. Science, 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
11
-
-
0032019125
-
A systematic procedure for setting parameters in simulated annealing algorithms
-
Park, M. W., and Kim, Y. D., 1998, A systematic procedure for setting parameters in simulated annealing algorithms. Computers and Operations Research, 25, 207-217.
-
(1998)
Computers and Operations Research
, vol.25
, pp. 207-217
-
-
Park, M.W.1
Kim, Y.D.2
-
13
-
-
0024480849
-
Simulated annealing algorithms: An overview
-
January, 19-26
-
Rutenbar, R. A., 1989, Simulated annealing algorithms: an overview. IEEE Circuits and Devices Magazine, January, 19-26.
-
(1989)
IEEE Circuits and Devices Magazine
-
-
Rutenbar, R.A.1
-
14
-
-
0027814376
-
Scheduling in a cellular manufacturing system: A simulated annealing approach
-
Sridhar, J., and Rajendran, C., 1993, Scheduling in a cellular manufacturing system: a simulated annealing approach. International Journal of Production Research, 31, 2927-2945.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2927-2945
-
-
Sridhar, J.1
Rajendran, C.2
-
15
-
-
0031521417
-
Minimizing tardiness on a single processor with sequence-dependent setup times: A simulated annealing approach
-
Tan, K. C., and Narasimhan, R., 1997, Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach. Omega, 25, 619-634.
-
(1997)
Omega
, vol.25
, pp. 619-634
-
-
Tan, K.C.1
Narasimhan, R.2
-
16
-
-
0026461248
-
Job shop scheduling by simulated annealing
-
Van Laarhoven, P. J. M., Aarts, E. H. L., and Lenstra, J. K., 1992, Job shop scheduling by simulated annealing. Operations Research, 40, 113-125.
-
(1992)
Operations Research
, vol.40
, pp. 113-125
-
-
Van Laarhoven, P.J.M.1
Aarts, E.H.L.2
Lenstra, J.K.3
-
17
-
-
0032674030
-
An efficient configuration generation mechanism to solve job shop scheduling problems by the simulated annealing algorithm
-
1999b, A parameter set design procedure for the simulated annealing algorithm under the computational time constraint. Computers and Operations Research, 26, 665-678
-
Wang, T. Y., and Wu, K. B., 1999a, An efficient configuration generation mechanism to solve job shop scheduling problems by the simulated annealing algorithm. International Journal of Systems Science, 30, 527-532; 1999b, A parameter set design procedure for the simulated annealing algorithm under the computational time constraint. Computers and Operations Research, 26, 665-678.
-
(1999)
International Journal of Systems Science
, vol.30
, pp. 527-532
-
-
Wang, T.Y.1
Wu, K.B.2
-
18
-
-
0032042555
-
An improved simulated annealing for facility layout problems in cellular manufacturing systems
-
Wang, T.Y., Lin, H. C., and Wu, K. B., 1998, An improved simulated annealing for facility layout problems in cellular manufacturing systems. Computers and Industrial Engineering, 34, 309-319.
-
(1998)
Computers and Industrial Engineering
, vol.34
, pp. 309-319
-
-
Wang, T.Y.1
Lin, H.C.2
Wu, K.B.3
-
19
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks, J. K., 1979, A simulation study of predictable due-dates. Management Science, 25, 363-373.
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
20
-
-
0029375875
-
Minimizing makespan for flow shop scheduling by combining simulated annealing with sequencing knowledge
-
Zegordi, S. H., Itoh, K., and Enkawa, T., 1995, Minimizing makespan for flow shop scheduling by combining simulated annealing with sequencing knowledge. European Journal of Operational Research, 85, 515-531.
-
(1995)
European Journal of Operational Research
, vol.85
, pp. 515-531
-
-
Zegordi, S.H.1
Itoh, K.2
Enkawa, T.3
|