메뉴 건너뛰기




Volumn 15, Issue 1, 2000, Pages 49-54

Tunnel Boring Machine performance in basalts of the Lesotho Formation

Author keywords

[No Author keywords available]

Indexed keywords

BASALT; PROJECT MANAGEMENT; WATER SUPPLY TUNNELS;

EID: 0034112295     PISSN: 08867798     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0886-7798(00)00028-6     Document Type: Article
Times cited : (14)

References (13)
  • 3
    • 0001961177 scopus 로고    scopus 로고
    • Design and construction of the transfer tunnel
    • Special issue: Lesotho Highlands Water Project
    • Boniface, A. 1997. Design and construction of the transfer tunnel. Proc. Inst. of Civil Engineers, Special issue: Lesotho Highlands Water Project, 30-42.
    • (1997) Proc. Inst. of Civil Engineers , pp. 30-42
    • Boniface, A.1
  • 4
    • 0033496161 scopus 로고    scopus 로고
    • 1999 Performance of tunnel boring machines in basalts of the lesotho formation
    • Rotterdam: Balkema
    • Boniface, A. 1999. 1999 performance of tunnel boring machines in basalts of the lesotho formation. Proc. World Tunnel Congress '99, Oslo, Norway. Rotterdam: Balkema.
    • (1999) Proc. World Tunnel Congress '99, Oslo, Norway
    • Boniface, A.1
  • 5
    • 0013646703 scopus 로고
    • Two tunnel boring machines for lesotho: A design and case history
    • London: IMM
    • Finnsson, S. 1994, Two tunnel boring machines for lesotho: A design and case history. Proc. Tunnelling '94, IMM/BTS, London. London: IMM.
    • (1994) Proc. Tunnelling '94, IMM/BTS, London
    • Finnsson, S.1
  • 6
    • 0013649658 scopus 로고
    • Tunnelling in basalts in iceland and the faroe islands with special reference to bored tunnels at the fljotsdalur and eidi projects
    • Maseru, Lesotho
    • Jonsson, B. 1992. Tunnelling in basalts in iceland and the faroe islands with special reference to bored tunnels at the fljotsdalur and eidi projects. Proc. TUNCON '92, Design and Construction of Tunnels. Maseru, Lesotho.
    • (1992) Proc. TUNCON '92, Design and Construction of Tunnels
    • Jonsson, B.1
  • 10
    • 85031647021 scopus 로고
    • Univ. of Trondheim/Norwegian Inst. of Technology/Division of Construction Engineering
    • NTNU. 1988. Project Report 1.88 - Hard Rock Tunnel Boring. Univ. of Trondheim/Norwegian Inst. of Technology/Division of Construction Engineering.
    • (1988) Project Report 1.88 - Hard Rock Tunnel Boring
  • 11
    • 85031642480 scopus 로고
    • Univ. of Trondheim/Norwegian Inst. of Technology/Division of Construction Engineering
    • NTNU. 1990. Project Report 13.90 - Drillability; Drilling Rate Index Catalogue. Univ. of Trondheim/Norwegian Inst. of Technology/Division of Construction Engineering.
    • (1990) Project Report 13.90 - Drillability; Drilling Rate Index Catalogue.
  • 12
    • 0013694052 scopus 로고
    • Univ. of Trondheim/Norwegian Inst. of Technology/Division of Construction Engineering
    • NTNU. 1994. Project Report 1-94 - Hard Rock Tunnel Boring. Univ. of Trondheim/Norwegian Inst. of Technology/Division of Construction Engineering.
    • (1994) Project Report 1-94 - Hard Rock Tunnel Boring


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.