메뉴 건너뛰기




Volumn 120, Issue 3, 2000, Pages 575-582

Optimal production run length for products sold with warranty

Author keywords

[No Author keywords available]

Indexed keywords

MARKOV PROCESSES; MATHEMATICAL MODELS; OPTIMIZATION; PROCESS ENGINEERING; QUALITY ASSURANCE; SENSITIVITY ANALYSIS; VALUE ENGINEERING;

EID: 0033896176     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(99)00004-1     Document Type: Article
Times cited : (88)

References (14)
  • 4
    • 0031141332 scopus 로고    scopus 로고
    • An extended EMQ model for a failure prone machine with general lifetime distribution
    • Kim H.C., Hong Y. An extended EMQ model for a failure prone machine with general lifetime distribution. International Journal of Production Economics. 49:1997;215-223.
    • (1997) International Journal of Production Economics , vol.49 , pp. 215-223
    • Kim, H.C.1    Hong, Y.2
  • 5
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedule in a production system
    • Lee H.L., Rosenblatt M.J. Simultaneous determination of production cycle and inspection schedule in a production system. Management Science. 33(9):1987;1125-1136.
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 6
    • 0024914068 scopus 로고
    • A production and maintenance planning model with restoration cost dependent on detection delay
    • Lee H.L., Rosenblatt M.J. A production and maintenance planning model with restoration cost dependent on detection delay. IIE Transactions. 21(4):1989;368-375.
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 368-375
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 7
    • 0001012373 scopus 로고
    • Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework
    • Lee H.L. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework. Management Science. 38(9):1992;1314-1328.
    • (1992) Management Science , vol.38 , Issue.9 , pp. 1314-1328
    • Lee, H.L.1
  • 8
    • 0000218363 scopus 로고
    • Optimal reliability choice in product design
    • Murthy D.N.P. Optimal reliability choice in product design. Engineering Optimization. 15:1990;281-294.
    • (1990) Engineering Optimization , vol.15 , pp. 281-294
    • Murthy, D.N.P.1
  • 12
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus E.L. Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research. 34(1):1986;137-144.
    • (1986) Operations Research , vol.34 , Issue.1 , pp. 137-144
    • Porteus, E.L.1
  • 13
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production process
    • Rosenblatt M.J., Lee H.L. Economic production cycles with imperfect production process. IIE Transactions. 18:1986;48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 14
    • 0030218654 scopus 로고    scopus 로고
    • Optimal preventive maintenance policy for deteriorating production system
    • Tseng S.T. Optimal preventive maintenance policy for deteriorating production system. IIE Transactions. 28:1996;687-694.
    • (1996) IIE Transactions , vol.28 , pp. 687-694
    • Tseng, S.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.