메뉴 건너뛰기




Volumn 126, Issue 6, 2000, Pages 511-520

Flow past bench-scale vertical ground-water cutoff walls

Author keywords

[No Author keywords available]

Indexed keywords

CONTAINMENT BARRIER; CUTOFF WALL; FLOW AROUND OBJECT; FLOW VELOCITY; GEOSYNTHETICS; HYDRAULIC CONDUCTIVITY;

EID: 0033832108     PISSN: 10900241     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)1090-0241(2000)126:6(511)     Document Type: Article
Times cited : (17)

References (31)
  • 1
    • 0008065672 scopus 로고    scopus 로고
    • Installing a HDPE vertical containment and collection system in one pass utilizing a deep trencher
    • U.S. DOE, U.S. EPA, and DuPont Co.
    • Bocchino, W., and Burson, B. (1997). "Installing a HDPE vertical containment and collection system in one pass utilizing a deep trencher." Proc., Int. Containment Technol. Conf., U.S. DOE, U.S. EPA, and DuPont Co., 193-199.
    • (1997) Proc., Int. Containment Technol. Conf. , pp. 193-199
    • Bocchino, W.1    Burson, B.2
  • 2
    • 0021861581 scopus 로고
    • Hydraulic conductivity tests on compacted clay
    • ASCE
    • Boynton, S., and Daniel, D. (1985). "Hydraulic conductivity tests on compacted clay." J. Geotech. Engrg., ASCE, 111(4), 465-478.
    • (1985) J. Geotech. Engrg. , vol.111 , Issue.4 , pp. 465-478
    • Boynton, S.1    Daniel, D.2
  • 3
    • 0008020725 scopus 로고    scopus 로고
    • Cut-off wall system for subsurface liquid containment
    • U.S. DOE, U.S. EPA, and DuPont Co.
    • Carlson, R., and Khan, F. (1997). "Cut-off wall system for subsurface liquid containment." Proc., Int. Containment Technol. Conf., U.S. DOE, U.S. EPA, and DuPont Co., 104-110.
    • (1997) Proc., Int. Containment Technol. Conf. , pp. 104-110
    • Carlson, R.1    Khan, F.2
  • 4
    • 0026992285 scopus 로고
    • Composite barrier slurry wall
    • D. B. Pual, R. R. Davidson, and N. J. Cavalli, eds., ASTM, West Conshohocken, Pa.
    • Cavalli, N. (1992). "Composite barrier slurry wall." Slurry walls: Design, construction, and quality control, STP 1129, D. B. Pual, R. R. Davidson, and N. J. Cavalli, eds., ASTM, West Conshohocken, Pa., 78-85.
    • (1992) Slurry Walls: Design, Construction, and Quality Control, STP , vol.1129 , pp. 78-85
    • Cavalli, N.1
  • 7
    • 0019009615 scopus 로고
    • Soil-bentonite slurry trench cutoffs
    • ASCE
    • D'Appolonia, D. J. (1980). "Soil-bentonite slurry trench cutoffs." J. Geotech. Engrg. Div., ASCE, 106(4), 399-417.
    • (1980) J. Geotech. Engrg. Div. , vol.106 , Issue.4 , pp. 399-417
    • D'Appolonia, D.J.1
  • 8
    • 0028574676 scopus 로고
    • The compatibility of slurry cutoff wall materials with contaminated groundwater
    • D. Daniel and S. Trautwein, eds., West Conshohocken, Pa.
    • Day, S. (1994). "The compatibility of slurry cutoff wall materials with contaminated groundwater." Hydraulic conductivity and waste contaminant transport in soil, STP 1142, D. Daniel and S. Trautwein, eds., West Conshohocken, Pa., 284-300.
    • (1994) Hydraulic Conductivity and Waste Contaminant Transport in Soil, STP , vol.1142 , pp. 284-300
    • Day, S.1
  • 9
    • 0008019815 scopus 로고
    • Geotechnics of hazardous waste control systems
    • H. Y. Fang, ed., Van Nostrand Reinhold, New York
    • Evans, J. (1991). "Geotechnics of hazardous waste control systems." Foundation engineering handbook, 2nd Ed., H. Y. Fang, ed., Van Nostrand Reinhold, New York, 750-777.
    • (1991) Foundation Engineering Handbook, 2nd Ed. , pp. 750-777
    • Evans, J.1
  • 10
    • 0002501739 scopus 로고
    • Vertical cutoff walls
    • D. Daniel, ed., Chapman & Hall, London
    • Evans, J. (1993). "Vertical cutoff walls." Geotechnical practice for waste disposal, D. Daniel, ed., Chapman & Hall, London, 430-454.
    • (1993) Geotechnical Practice for Waste Disposal , pp. 430-454
    • Evans, J.1
  • 11
    • 0028595522 scopus 로고
    • Hydraulic conductivity of vertical cutoff walls
    • D. Daniel and S. Trautwein, eds., ASTM, West Conshohocken, Pa.
    • Evans, J. (1994). "Hydraulic conductivity of vertical cutoff walls." Hydraulic conductivity and waste contaminant transport in soil, STP 1142, D. Daniel and S. Trautwein, eds., ASTM, West Conshohocken, Pa., 79-94.
    • (1994) Hydraulic Conductivity and Waste Contaminant Transport in Soil, STP , vol.1142 , pp. 79-94
    • Evans, J.1
  • 14
    • 0024475995 scopus 로고
    • Leakage through liners constructed with geomembranes: Parts I and II
    • Giroud, J., and Bonaparte, R. (1989). "Leakage through liners constructed with geomembranes: Parts I and II." J. Geotextiles and Geomembranes, 8, 27-107.
    • (1989) J. Geotextiles and Geomembranes , vol.8 , pp. 27-107
    • Giroud, J.1    Bonaparte, R.2
  • 15
    • 0021554394 scopus 로고
    • Ground-water regions of the United States
    • U.S. Geological Survey, Reston, Va.
    • Heath, R. (1984). "Ground-water regions of the United States." Geological Survey Water Supply Paper No. 2242, U.S. Geological Survey, Reston, Va.
    • (1984) Geological Survey Water Supply Paper No. 2242 , vol.2242
    • Heath, R.1
  • 16
    • 0008150176 scopus 로고    scopus 로고
    • An improved method for interpreting API filter press hydraulic conductivity test results
    • U.S. DOE, U.S. EPA, and DuPont Co.
    • Heslin, G., Filz, G., Baxter, D., and Davidson, R. (1997). "An improved method for interpreting API filter press hydraulic conductivity test results. Proc., Int. Containment Technol. Conf., U.S. DOE, U.S. EPA, and DuPont Co., 71-77.
    • (1997) Proc., Int. Containment Technol. Conf. , pp. 71-77
    • Heslin, G.1    Filz, G.2    Baxter, D.3    Davidson, R.4
  • 17
    • 0026962507 scopus 로고
    • Design, construction and performance of a soil-bentonite cutoff wall constructed in two stages
    • D. B. Pual, R. R. Davidson, and N. J. Cavalli, eds., ASTM, West Conshohocken, Pa.
    • Khoury, M., Fayad, P., and Ladd, R. (1992). "Design, construction and performance of a soil-bentonite cutoff wall constructed in two stages." Slurry walls: Design, construction, and quality control, STP 1129, D. B. Pual, R. R. Davidson, and N. J. Cavalli, eds., ASTM, West Conshohocken, Pa., 289-308.
    • (1992) Slurry Walls: Design, Construction, and Quality Control, STP , vol.1129 , pp. 289-308
    • Khoury, M.1    Fayad, P.2    Ladd, R.3
  • 22
    • 0008020913 scopus 로고
    • Innovative aspects of leachate containment with composite slurry walls: A case history
    • D. B. Pual, R. R. Davidson, and N. J. Cavalli, eds., ASTM, West Conshohocken, Pa.
    • Manassero, M., and Viola, C. (1992). "Innovative aspects of leachate containment with composite slurry walls: A case history." Slurry walls: Design, construction, and quality control, STP 1129, D. B. Pual, R. R. Davidson, and N. J. Cavalli, eds., ASTM, West Conshohocken, Pa., 42-67.
    • (1992) Slurry Walls: Design, Construction, and Quality Control, STP , vol.1129 , pp. 42-67
    • Manassero, M.1    Viola, C.2
  • 23
    • 0019606473 scopus 로고
    • Current USA practices: Slurry wall specifications
    • ASCE
    • Millet, R. A., and Perez, J.-Y. (1981). "Current USA practices: Slurry wall specifications." J. Geotech. Engrg. Div., ASCE, 107(8), 1041-1056.
    • (1981) J. Geotech. Engrg. Div. , vol.107 , Issue.8 , pp. 1041-1056
    • Millet, R.A.1    Perez, J.-Y.2
  • 24
    • 0026976316 scopus 로고
    • USA practice-slurry wall specifications 10 years later
    • D. B. Pual, R. R. Davidson, and N. J. Cavalli, eds., ASTM, West Conshohocken, Pa.
    • Millett, R., Perez, J., and Davidson, R. (1992). "USA practice-slurry wall specifications 10 years later." Slurry walls: Design, construction, and quality control, STP 1129, D. B. Pual, R. R. Davidson, and N. J. Cavalli, eds., ASTM, West Conshohocken, Pa., 42-67.
    • (1992) Slurry Walls: Design, Construction, and Quality Control, STP , vol.1129 , pp. 42-67
    • Millett, R.1    Perez, J.2    Davidson, R.3
  • 26
    • 0008019286 scopus 로고    scopus 로고
    • Slurry walls and slurry trenches - Construction quality control
    • U.S. DOE, U.S. EPA, and DuPont Co.
    • Poletto, R., and Good, D. (1997). "Slurry walls and slurry trenches - Construction quality control." Proc., Int. Containment Technol. Conf., U.S. DOE, U.S. EPA, and DuPont Co., 45-51.
    • (1997) Proc., Int. Containment Technol. Conf. , pp. 45-51
    • Poletto, R.1    Good, D.2
  • 27
    • 0023169140 scopus 로고
    • Vertical barriers in soil for pollution containment
    • R. Woods, ed., ASCE, New York
    • Ryan, C. (1987). "Vertical barriers in soil for pollution containment." Geotechnical practice for waste disposal '87, 13, R. Woods, ed., ASCE, New York, 182-204.
    • (1987) Geotechnical Practice for Waste Disposal '87 , vol.13 , pp. 182-204
    • Ryan, C.1
  • 28
    • 0008068846 scopus 로고    scopus 로고
    • Installation of a HDPE curtain wall with sheetpile tie-in on both ends
    • U.S. DOE, U.S. EPA, and DuPont Co.
    • Schindler, R., and Maltese, P. (1997). "Installation of a HDPE curtain wall with sheetpile tie-in on both ends." Proc., Int. Containment Technol. Conf., U.S. DOE, U.S. EPA, and DuPont Co., 229-234.
    • (1997) Proc., Int. Containment Technol. Conf. , pp. 229-234
    • Schindler, R.1    Maltese, P.2
  • 31
    • 0003740296 scopus 로고
    • Academic, San Diego, and McGraw-Hill, New York
    • Xanthakos, P. (1979). Slurry walls. Academic, San Diego, and McGraw-Hill, New York.
    • (1979) Slurry Walls
    • Xanthakos, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.