메뉴 건너뛰기




Volumn 26, Issue 4, 2000, Pages 181-192

Group technology approach to the open shop scheduling problem with batch setup times

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; APPROXIMATION THEORY; BENCHMARKING; COMPUTATIONAL COMPLEXITY; GROUP TECHNOLOGY; HEURISTIC METHODS; PROCESS CONTROL; SCHEDULING;

EID: 0033743394     PISSN: 01676377     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0167-6377(00)00021-3     Document Type: Article
Times cited : (28)

References (7)
  • 1
    • 0012694908 scopus 로고    scopus 로고
    • Approximation algorithms for two-machine flow shop scheduling with batch setup times
    • Chen B., Potts C.N., Strusevich V.A. Approximation algorithms for two-machine flow shop scheduling with batch setup times. Math. Programming B. 82:1998;255-271.
    • (1998) Math. Programming B , vol.82 , pp. 255-271
    • Chen, B.1    Potts, C.N.2    Strusevich, V.A.3
  • 2
    • 0017012325 scopus 로고
    • Open shop scheduling to minimize finish time
    • Gonzalez T., Sahni S. Open shop scheduling to minimize finish time. J. Assoc. Comput. Mach. 23:1976;665-679.
    • (1976) J. Assoc. Comput. Mach. , vol.23 , pp. 665-679
    • Gonzalez, T.1    Sahni, S.2
  • 3
    • 0003075019 scopus 로고
    • Optimal two- And three-stage production schedules with setup times included
    • Johnson S.M. Optimal two- and three-stage production schedules with setup times included. Naval Res. Log. Quart. 1:1954;61-68.
    • (1954) Naval Res. Log. Quart. , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 4
    • 38249004716 scopus 로고
    • Two-machine shop scheduling problems with batch processing
    • Kleinau U. Two-machine shop scheduling problems with batch processing. Math. Comput. Modelling. 17:1993;55-66.
    • (1993) Math. Comput. Modelling , vol.17 , pp. 55-66
    • Kleinau, U.1
  • 6
    • 0027641391 scopus 로고
    • Two machine open shop scheduling problem with setup, processing and removal times separated
    • Strusevich V.A. Two machine open shop scheduling problem with setup, processing and removal times separated. Comput. Oper. Res. 20:1993;597-611.
    • (1993) Comput. Oper. Res. , vol.20 , pp. 597-611
    • Strusevich, V.A.1
  • 7
    • 0018520161 scopus 로고
    • Optimal two-stage production scheduling with setup times separated
    • Yoshida T., Hitomi K. Optimal two-stage production scheduling with setup times separated. AIIE Trans. 11:1979;261-263.
    • (1979) AIIE Trans. , vol.11 , pp. 261-263
    • Yoshida, T.1    Hitomi, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.