|
Volumn 26, Issue 4, 2000, Pages 181-192
|
Group technology approach to the open shop scheduling problem with batch setup times
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ALGORITHMS;
APPROXIMATION THEORY;
BENCHMARKING;
COMPUTATIONAL COMPLEXITY;
GROUP TECHNOLOGY;
HEURISTIC METHODS;
PROCESS CONTROL;
SCHEDULING;
LINEAR-TIME HEURISTIC ALGORITHMS;
OPEN SHOP SCHEDULING;
WORST-CASE ANALYSIS;
PRODUCTION CONTROL;
|
EID: 0033743394
PISSN: 01676377
EISSN: None
Source Type: Journal
DOI: 10.1016/S0167-6377(00)00021-3 Document Type: Article |
Times cited : (28)
|
References (7)
|